{"id":116995,"date":"2020-07-15T12:41:23","date_gmt":"2020-07-15T09:41:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=116995"},"modified":"2020-07-15T12:49:18","modified_gmt":"2020-07-15T09:49:18","slug":"asunim-lisansli-ges-projelerini-hayata-gecirmeyi-surduruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/asunim-lisansli-ges-projelerini-hayata-gecirmeyi-surduruyor\/","title":{"rendered":"(Turkish) Asunim Lisansl\u0131 GES Projelerini Hayata Ge\u00e7irmeyi S\u00fcrd\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/116995\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>T\u00fcrkiye\u2019de 4 adet lisansl\u0131 GES dahil 240MWp \u00fczerinde GES kurulumu ger\u00e7ekle\u015ftirmi\u015f olan Asunim T\u00fcrkiye, yurt i\u00e7i ve yurt d\u0131\u015f\u0131nda yenilenebilir enerji alan\u0131nda bir\u00e7ok yat\u0131r\u0131m\u0131 olan Art\u0131bir Grup ile Antalya\u2019da hayata ge\u00e7irece\u011fi toplam da 31,5 MWp g\u00fcc\u00fcndeki lisansl\u0131 ges projesine y\u00f6nelik EPC s\u00f6zle\u015fmesi imzalad\u0131.<\/h1>\n<p><em>T\u00fcm projelendirme ve m\u00fchendislik hizmetleri;<\/em> <strong>Asunim<\/strong>\u2019in Avrupa\u2019daki <strong>m\u00fchendislik departman\u0131<\/strong> taraf\u0131ndan, <strong>3D modelleme teknikleri, en geli\u015fmi\u015f meteorolojik ve g\u00f6lge hesap enstr\u00fcmanlar\u0131<\/strong> ve <strong>Asunim\u2019e \u00f6zel yaz\u0131l\u0131mlar<\/strong> kullan\u0131larak yap\u0131lacak.<\/p>\n<h2><strong><img loading=\"lazy\" class=\"alignright wp-image-116997\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/asunim-lisansli-projelerini-hayata-gecirmeyi-surduruyor.jpg\" alt=\"\" width=\"340\" height=\"195\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/asunim-lisansli-projelerini-hayata-gecirmeyi-surduruyor.jpg 853w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/asunim-lisansli-projelerini-hayata-gecirmeyi-surduruyor-300x172.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/asunim-lisansli-projelerini-hayata-gecirmeyi-surduruyor-768x439.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/asunim-lisansli-projelerini-hayata-gecirmeyi-surduruyor-500x286.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/asunim-lisansli-projelerini-hayata-gecirmeyi-surduruyor-80x46.jpg 80w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>Asunim Lisansl\u0131 Ges Projelerinde de Lider<\/strong><\/h2>\n<p><strong>Asunim T\u00fcrkiye<\/strong> Genel M\u00fcd\u00fcr\u00fc <strong>Umut G\u00fcrb\u00fcz<\/strong>; <strong>b\u00fcy\u00fck \u00f6l\u00e7ekli GES segmenti<\/strong>nde a\u00e7\u0131k ara lider konumda bulunduklar\u0131na, kurulumda olan ve tamamlanan <strong>5 lisansl\u0131 proje<\/strong> ile toplam <strong>72 MWp<\/strong>\u2019leri bulan lisanl\u0131 <strong>GES projesi<\/strong> portf\u00f6y\u00fcne sahip olduklar\u0131na de\u011findi. G\u00fcrb\u00fcz; <strong>Elaz\u0131\u011f<\/strong>\u2019da <strong>EPC<\/strong> olarak yer ald\u0131\u011f\u0131m\u0131z <strong>Solentegre GES projesi<\/strong> ile T\u00fcrkiye\u2019nin ilk <strong>lisansl\u0131 g\u00fcne\u015f enerji santrali<\/strong>ni biz kurduk, akabinde <strong>YBT Enerji<\/strong> ve <strong>Akfen Yenilenebilir Enerji<\/strong> i\u00e7in <strong>3 adet<\/strong> daha lisansl\u0131 projenin <strong>EPC i\u015fleri<\/strong>ni \u00fcstlendik, \u015fimdi de enerjide <strong>son derece aktif<\/strong> bir \u015firket olan <strong>Art\u0131bir Enerji<\/strong>\u2019nin <strong>31,5MWp<\/strong>&#8216;lik projesinin <strong>EPC i\u015fleri<\/strong>ni \u00fcstlenmenin mutlulu\u011funu ya\u015f\u0131yoruz.<\/p>\n<p>T\u00fcrkiye\u2019de ve uluslararas\u0131 alanda da <strong>enerji yat\u0131r\u0131mlar\u0131<\/strong> olan <strong>Art\u0131bir Enerji<\/strong> gibi titiz ve kurumsal bir yat\u0131r\u0131mc\u0131ya ait bu <strong>lisansl\u0131 projede<\/strong>, alan\u0131nda uzman bir \u00e7ok <strong>dan\u0131\u015fmanl\u0131k \u015firketi<\/strong>nin<strong> teknik ve finansal kriterleri<\/strong>ni sa\u011flayarak se\u00e7ilmi\u015f olmaktan mutluluk duyuyoruz. T\u00fcm projelerimizde oldu\u011fu gibi bu projeyi de, piyasadaki <strong>en kaliteli \u00fcr\u00fcnlerle, en iyi m\u00fchendislik ve bak\u0131m hizmetlerini<\/strong> sunarak <strong>Avrupa standartlar\u0131<\/strong>na uygun bir \u015fekilde <strong>projeyi zaman\u0131nda<\/strong> ve <strong>hesaplanan b\u00fct\u00e7e dahilinde<\/strong> nihayete erdirece\u011fiz dedi.<\/p>\n<h2><strong>Y\u0131lda 48.500.000 kWh Enerji \u00dcretimi<\/strong><\/h2>\n<p><strong>Art\u0131bir Enerji<\/strong>\u2019ye ait olan sistemin y\u0131ll\u0131k <strong>48.5 milyon kWh<\/strong> enerji \u00fcretece\u011fini dile getiren, Umut G\u00fcrb\u00fcz; <strong>\u00e7evre y\u00f6netiminden at\u0131k y\u00f6netimine, hidrolik \u00e7al\u0131\u015fmalardan trafik y\u00f6netimine<\/strong> kadar <strong>\u00e7ok titiz bir \u00e7al\u0131\u015fma<\/strong> i\u00e7inde olacaklar\u0131n\u0131 ekledi.<\/p>\n<p><strong>31,5MWp<\/strong> kapasitesinde olan santralin proje <strong>planlama, m\u00fchendislik ve kurulumu<\/strong> <em>4,5 ay<\/em> i\u00e7erisinde tamamlanacak. Projenin <strong>bak\u0131m onar\u0131m faaliyetleri<\/strong> ise <strong>Asunim\u2019in<\/strong> i\u015ftiraki, GES\u2019lerin bak\u0131m onar\u0131m\u0131 alan\u0131nda lider; ba\u011f\u0131ms\u0131z bir bak\u0131m onar\u0131m \u015firketi olan <strong>Maxima Enerji<\/strong> taraf\u0131ndan y\u00fcr\u00fct\u00fclecektir.<\/p>\n<p><strong>Lisansl\u0131 ges projeleri ve \u00e7at\u0131 uygulamalar\u0131<\/strong> konusunda \u00f6nc\u00fc bir firma oldu\u011funu kan\u0131tlayan <strong>Asunim T\u00fcrkiye<\/strong>, <em>2020 y\u0131l\u0131 ilk \u00e7eyre\u011fi<\/em> itibariyle T\u00fcrkiye\u2019de <strong>245 MW<\/strong>\u2019\u0131 a\u015fan referanslara sahip olurken, <strong>Art\u0131bir Enerji<\/strong> ile imzalad\u0131\u011f\u0131 <strong>bu s\u00f6zle\u015fme<\/strong> ile tamamlanan ve kurulumda olan <strong>lisansl\u0131 GES portf\u00f6y\u00fc<\/strong> ise <strong>72 MW<\/strong>\u2019lar mertebesine ula\u015fm\u0131\u015ft\u0131r.<\/p>\n<p><strong>Daha Detayl\u0131 Bilgi \u0130\u00e7in:<\/strong>\u00a0<a href=\"https:\/\/www.asunim.com.tr\/\" target=\"_blank\" rel=\"nofollow noopener\">https:\/\/www.asunim.com.tr\/<\/a> adresini ziyaret edebilirsiniz.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019de 4 adet lisansl\u0131 GES dahil 240MWp \u00fczerinde GES kurulumu ger\u00e7ekle\u015ftirmi\u015f olan Asunim T\u00fcrkiye, yurt i\u00e7i ve yurt d\u0131\u015f\u0131nda yenilenebilir enerji alan\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":116997,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[28245,5201,75882,75878,6742,6743,5070,52259,532,75883,72452,75884,35038,7440,53157,75885,75880,75887,35380,75886,75879,36099,75881,54979,8494,36817],"views":214,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116995"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=116995"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116995\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/116997"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=116995"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=116995"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=116995"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}