{"id":116477,"date":"2020-07-05T23:52:52","date_gmt":"2020-07-05T20:52:52","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=116477"},"modified":"2020-07-05T23:54:00","modified_gmt":"2020-07-05T20:54:00","slug":"totalin-belcikadaki-gaz-calismalari-gucunu-ruzgardan-alacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/totalin-belcikadaki-gaz-calismalari-gucunu-ruzgardan-alacak\/","title":{"rendered":"(Turkish) Total&#8217;in Bel\u00e7ika\u2019daki Gaz \u00c7al\u0131\u015fmalar\u0131 G\u00fcc\u00fcn\u00fc R\u00fczgardan Alacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/116477\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Frans\u0131z \u015firket Total taraf\u0131ndan Bel\u00e7ika\u2019da enerji ve gaz tedari\u011fi faaliyetlerini s\u00fcrd\u00fcren birimi Lampiris&#8217;in elektri\u011fi Kuzey Denizi ve Bel\u00e7ika sular\u0131nda yer alan 309 MW <img loading=\"lazy\" class=\"alignright wp-image-116481\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/total-in-belcika-daki-gaz-calismalari-gucunu-ruzgardan-alacak.jpg\" alt=\"\" width=\"320\" height=\"178\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/total-in-belcika-daki-gaz-calismalari-gucunu-ruzgardan-alacak.jpg 800w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/total-in-belcika-daki-gaz-calismalari-gucunu-ruzgardan-alacak-300x167.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/total-in-belcika-daki-gaz-calismalari-gucunu-ruzgardan-alacak-768x427.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/total-in-belcika-daki-gaz-calismalari-gucunu-ruzgardan-alacak-500x278.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/total-in-belcika-daki-gaz-calismalari-gucunu-ruzgardan-alacak-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>kapasiteli Rentel R\u00fczgar Enerjisi Santrali&#8217;nden (RES) sat\u0131n al\u0131nacak.<\/h1>\n<p>Lampiris&#8217;ten yap\u0131lan a\u00e7\u0131klamada, <strong>Rentel RES<\/strong>\u2019te \u00fcretilen elektri\u011fin tamam\u0131n\u0131 sat\u0131n alaca\u011f\u0131 belirtilirken y\u0131lda <strong>1 TWh<\/strong> <em>r\u00fczgar elektri\u011fi sat\u0131n al\u0131m\u0131<\/em> i\u00e7in <strong>Otary Group<\/strong> ile <strong>15 y\u0131ll\u0131k<\/strong> bir <strong>tedarik anla\u015fmas\u0131<\/strong> imzalad\u0131. \u015eirket <strong>elektrik sat\u0131n al\u0131m\u0131<\/strong>na ise\u00a0<strong>1 Ekim 2020<\/strong>&#8216;de ba\u015flayacak.<\/p>\n<p><strong>Zeebrugge<\/strong> a\u00e7\u0131klar\u0131nda yer alan <em>Rentel RES<\/em> <strong>42<\/strong> adet <strong>Siemens Gamesa t\u00fcrbini<\/strong>nden meydana gelirken 2018 y\u0131l\u0131n\u0131n sonlar\u0131na do\u011fru \u00fcretime ge\u00e7en santrali <strong>8<\/strong> \u015firketin meydana getirdi\u011fi bir <strong>konsorsiyum<\/strong> olan <strong>Otary Group<\/strong> i\u015fletiyor. <strong>Santralin \u00fcretti\u011fi<\/strong> elektrik <strong>300 bin hanenin<\/strong> elektrik ihtiyac\u0131na kar\u015f\u0131l\u0131k gelmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Frans\u0131z \u015firket Total taraf\u0131ndan Bel\u00e7ika\u2019da enerji ve gaz tedari\u011fi faaliyetlerini s\u00fcrd\u00fcren birimi Lampiris&#8217;in elektri\u011fi Kuzey Denizi ve Bel\u00e7ika sular\u0131nda yer alan 309 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":116481,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[6687,5070,34818,57597,52259,75188,75183,75184,75186,75181,75185,75182,35002,35004,53282,48994,52215,75187,54979,1847],"views":168,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116477"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=116477"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116477\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/116481"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=116477"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=116477"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=116477"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}