{"id":116402,"date":"2020-07-04T14:51:21","date_gmt":"2020-07-04T11:51:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=116402"},"modified":"2020-07-04T14:52:44","modified_gmt":"2020-07-04T11:52:44","slug":"turkiye-nin-ilk-entegre-gunes-paneli-uretim-fabrikasi-agustos-ta-aciliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-nin-ilk-entegre-gunes-paneli-uretim-fabrikasi-agustos-ta-aciliyor\/","title":{"rendered":"(Turkish) T\u00fcrkiye&#8217;nin &#8216;Entegre G\u00fcne\u015f Paneli \u00dcretim Fabrikas\u0131&#8217; A\u011fustos&#8217;ta A\u00e7\u0131l\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/116402\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Enerji ve Tabii Kaynaklar Bakan\u0131 Fatih D\u00f6nmez taraf\u0131ndan Ankara&#8217;da montaj\u0131 bitme a\u015famas\u0131na gelen tam entegre g\u00fcne\u015f paneli \u00fcretim fabrikas\u0131nda incelemelerde bulunuldu. Bakan D\u00f6nmez, &#8220;D\u00fcnyan\u0131n farkl\u0131 yerlerinde &#8216;Made In T\u00fcrkiye&#8217; yaz\u0131l\u0131 g\u00fcne\u015f panellerini g\u00f6rece\u011fiz. T\u00fcrkiye&#8217;nin g\u00fcne\u015fi daha \u00e7ok parlayacak&#8221; dedi.<img loading=\"lazy\" class=\"alignright wp-image-116406\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/turkiye-nin-ilk-entegre-gunes-paneli-uretim-fabrikasi-agustos-ta-aciliyor-1.jpg\" alt=\"\" width=\"320\" height=\"205\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/turkiye-nin-ilk-entegre-gunes-paneli-uretim-fabrikasi-agustos-ta-aciliyor-1.jpg 763w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/turkiye-nin-ilk-entegre-gunes-paneli-uretim-fabrikasi-agustos-ta-aciliyor-1-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/turkiye-nin-ilk-entegre-gunes-paneli-uretim-fabrikasi-agustos-ta-aciliyor-1-500x320.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/turkiye-nin-ilk-entegre-gunes-paneli-uretim-fabrikasi-agustos-ta-aciliyor-1-78x50.jpg 78w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/h1>\n<p>D\u00f6nmez, beraberinde <strong>T\u00fcrkiye B\u00fcy\u00fck Millet Meclisi (TBMM) Plan ve B\u00fct\u00e7e Komisyon Ba\u015fkan\u0131<\/strong> L\u00fctfi Elvan, <em>Enerji Piyasas\u0131 D\u00fczenleme Kurumu<\/em> Ba\u015fkan\u0131 <strong>Mustafa Y\u0131lmaz<\/strong> ile birlikte <strong>Kalyon Holding<\/strong> yat\u0131r\u0131m\u0131yla <strong>montaj\u0131 bitme a\u015famas\u0131na<\/strong> gelen <strong>Ba\u015fkent Organize Sanayi B\u00f6lgesi<\/strong>\u2019ndeki tam <strong>entegre g\u00fcne\u015f paneli \u00fcretim fabrikas\u0131n\u0131<\/strong> ziyaret etti.<\/p>\n<p>Fabrikada inceleme sonras\u0131 a\u00e7\u0131klamalarda bulunan D\u00f6nmez, <strong>T\u00fcrkiye, Avrupa ve Orta Do\u011fu<\/strong>&#8216;daki tek <strong>entegre g\u00fcne\u015f paneli fabrikas\u0131<\/strong>nda olduklar\u0131n\u0131 belirtti. D\u00f6nmez, &#8220;Bu tesis, <strong>4 farkl\u0131 \u00fcretimi<\/strong> bir araya getiren <strong>tek entegre tesis<\/strong>. Bulundu\u011fumuz tesisin temeli <strong>Say\u0131n Cumhurba\u015fkan\u0131m\u0131z\u0131n te\u015frifleri<\/strong> ile at\u0131lm\u0131\u015ft\u0131 ve <strong>\u00f6n\u00fcm\u00fczdeki ay<\/strong> da yine <strong>kendilerinin kat\u0131l\u0131m\u0131 ile<\/strong> a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131lacak&#8221; ifadelerini kulland\u0131.<\/p>\n<p>Ayr\u0131ca Bakan D\u00f6nmez, tesiste <strong>AR-GE merkezi<\/strong>nin kurulaca\u011f\u0131n\u0131, yakla\u015f\u0131k <strong>100 m\u00fchendis<\/strong> ve <strong>ara\u015ft\u0131rmac\u0131n\u0131n<\/strong> g\u00f6rev alaca\u011f\u0131n\u0131 dile getirerek, &#8220;<strong>Daha \u00e7ok yerli<\/strong> daha \u00e7ok <strong>yenilebilir enerji mottosuyla<\/strong> yola \u00e7\u0131kt\u0131k. Kendi kaynaklar\u0131m\u0131z\u0131 kendi <strong>yerli teknolojimiz ile elektri\u011fe d\u00f6n\u00fc\u015ft\u00fcrmek<\/strong> istiyoruz. <strong>Bu tesiste \u00fcretilecek paneller<\/strong> \u00f6nce <strong>Karap\u0131nar\u2019da<\/strong> yap\u0131lacak <strong>g\u00fcne\u015f enerji santrali<\/strong>nde kullan\u0131lacak. Ard\u0131ndan da <strong>yurt d\u0131\u015f\u0131na ihra\u00e7 f\u0131rsatlar\u0131<\/strong> kullan\u0131larak, yerli teknolojiyi yurt d\u0131\u015f\u0131na g\u00f6nderece\u011fiz.&#8221; dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakan\u0131 Fatih D\u00f6nmez taraf\u0131ndan Ankara&#8217;da montaj\u0131 bitme a\u015famas\u0131na gelen tam entegre g\u00fcne\u015f paneli \u00fcretim fabrikas\u0131nda incelemelerde bulunuldu. Bakan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":116407,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[65727,14412,75092,53114,1046,52259,1389,75093,75095,750,27530,2569,53157,8255,35882,3059,27779,12996,75096,75094],"views":211,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116402"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=116402"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116402\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/116407"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=116402"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=116402"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=116402"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}