{"id":116380,"date":"2020-07-04T03:41:58","date_gmt":"2020-07-04T00:41:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=116380"},"modified":"2020-07-04T03:41:58","modified_gmt":"2020-07-04T00:41:58","slug":"yeka-ges-3-yarisma-ilani-yayimlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-ges-3-yarisma-ilani-yayimlandi\/","title":{"rendered":"(Turkish) &#8217;YEKA GES-3 Yar\u0131\u015fma&#8217; \u0130lan\u0131 Yay\u0131mland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/116380\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan g\u00fcne\u015f enerjisinde 1000 MWe g\u00fcc\u00fcndeki kapasite tahsisine y\u00f6nelik 36 ilde mini yenilenebilir enerji kaynak alanlar\u0131 (YEKA) ihaleleri yapacak.\u00a0Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131&#8217;n\u0131n g\u00fcne\u015f enerjisine dayal\u0131 YEKA ve ba\u011flant\u0131 kapasitelerinin tahsisine ili\u015fkin yar\u0131\u015fma ilan\u0131 Resmi Gazete&#8217;de yay\u0131mland\u0131.<\/h1>\n<p>Buna g\u00f6re, toplam <strong>1.000 MWe<\/strong> g\u00fcc\u00fcndeki <strong>ba\u011flant\u0131 kapasitesi<\/strong>nin tahsisi i\u00e7in <strong>10 MWe, 15 MWe<\/strong> veya <strong>20 MWe<\/strong> kapasitelerinde olacak \u015fekilde <strong>g\u00fcne\u015f enerjisine dayal\u0131<\/strong> toplam <strong>74 adet<\/strong> yar\u0131\u015fma (<strong>YEKA GES-3 Yar\u0131\u015fmalar\u0131<\/strong>)\u00a0 yap\u0131lacak.<\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-116382\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/yeka-ges-3-yarisma-ilani-yayimlandi.jpg\" alt=\"\" width=\"340\" height=\"205\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/yeka-ges-3-yarisma-ilani-yayimlandi.jpg 810w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/yeka-ges-3-yarisma-ilani-yayimlandi-300x181.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/yeka-ges-3-yarisma-ilani-yayimlandi-768x463.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/yeka-ges-3-yarisma-ilani-yayimlandi-500x301.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/yeka-ges-3-yarisma-ilani-yayimlandi-80x48.jpg 80w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>Her bir yar\u0131\u015fmaya <strong>kat\u0131labilmek i\u00e7in<\/strong> sat\u0131n al\u0131nmas\u0131 gereken <strong>\u015fartname bedeli 2.000 TL<\/strong> olarak belirlendi. Her bir ihalenin ba\u015flang\u0131\u00e7 <strong>tavan fiyat\u0131 kilovatsaat<\/strong> ba\u015f\u0131na <strong>30 kuru\u015f<\/strong>, elektrik enerjisi <strong>al\u0131m s\u00fcresi<\/strong> ise s\u00f6zle\u015fmenin imzaland\u0131\u011f\u0131 tarihten itibaren <strong>15 y\u0131l<\/strong> olacak.<\/p>\n<p>S\u00f6z konusu ihalelere sadece <strong>T\u00fcrk Ticaret Kanunu&#8217;na<\/strong> g\u00f6re <strong>anonim<\/strong> veya <strong>limited \u015firket<\/strong> \u015feklinde kurulmu\u015f <strong>t\u00fczel ki\u015filer<\/strong> ba\u015fvurabilecek.<\/p>\n<p><strong>Her bir yar\u0131\u015fmaya kat\u0131labilmek<\/strong> i\u00e7in ba\u015fvuru a\u015famas\u0131nda kesin, <strong>1 y\u0131l<\/strong> s\u00fcreli, <strong>tamamen<\/strong> ve<strong> k\u0131smen<\/strong> nakde \u00e7evrilebilir, <strong>limit d\u0131\u015f\u0131<\/strong> ve <strong>10 MWe<\/strong> kapasiteli yar\u0131\u015fmalar i\u00e7in <strong>3,5 milyon TL<\/strong>, <strong>15 MWe<\/strong> kapasiteli\u00a0 yar\u0131\u015fmalar i\u00e7in <strong>5,5 milyon TL<\/strong>, <strong>20 MWe<\/strong> <strong>kapasiteli yar\u0131\u015fmalar<\/strong> i\u00e7in <strong>7,0 milyon TL<\/strong> tutar\u0131ndaki <strong>teminat mektubu \u0130dare\u2019ye<\/strong> sunulacak.<\/p>\n<p><strong>Yar\u0131\u015fman\u0131n kazan\u0131lmas\u0131<\/strong> halinde ise, <strong>s\u00f6zle\u015fmenin imzalanaca\u011f\u0131<\/strong> tarihten en ge\u00e7 <strong>1 g\u00fcn \u00f6ncesine<\/strong> kadar kesin, <strong>10 y\u0131l<\/strong> s\u00fcreli, <strong>tamamen ve k\u0131smen<\/strong> nakde \u00e7evrilebilir, <strong>limit d\u0131\u015f\u0131<\/strong> ve <strong>10 MWe<\/strong> kapasiteli yar\u0131\u015fmalar\u00a0 i\u00e7in <strong>7,0 milyon TL, 15 MWe<\/strong> kapasiteli yar\u0131\u015fmalar i\u00e7in <strong>11,0 milyon TL, 20 MWe<\/strong> kapasiteli yar\u0131\u015fmalar i\u00e7in <strong>14,0 milyon TL<\/strong> tutar\u0131ndaki teminat mektubu \u0130dare\u2019ye sunulacak.<\/p>\n<p>Ba\u015fvurular\u0131\u00a0<strong>19-23 Ekim 2020 <\/strong>tarihleri aral\u0131\u011f\u0131nda\u00a0de\u011fi\u015fen <strong>her bir yar\u0131\u015fmaya y\u00f6nelik<\/strong> belirtilen<strong> tarih ve saatler<\/strong> aras\u0131nda ba\u015fvuru ger\u00e7ekle\u015ftirilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan g\u00fcne\u015f enerjisinde 1000 MWe g\u00fcc\u00fcndeki kapasite tahsisine y\u00f6nelik 36 ilde mini yenilenebilir enerji kaynak alanlar\u0131 (YEKA) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":116382,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[75067,75069,53114,52259,1972,1635,53157,46048,75068,62596,1388,32594,39626,61203,75066,32142,75071,75065,58674,75070],"views":269,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116380"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=116380"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116380\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/116382"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=116380"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=116380"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=116380"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}