{"id":116221,"date":"2020-07-01T10:56:05","date_gmt":"2020-07-01T07:56:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=116221"},"modified":"2020-07-01T10:56:05","modified_gmt":"2020-07-01T07:56:05","slug":"paks-2-ngs-insaat-lisansi-belgeleri-macar-atom-enerjisi-kurumuna-sunuldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/paks-2-ngs-insaat-lisansi-belgeleri-macar-atom-enerjisi-kurumuna-sunuldu\/","title":{"rendered":"(Turkish) Paks-2 NGS \u0130n\u015faat Lisans\u0131 Belgeleri Macar Atom Enerjisi Kurumu&#8217;na Sunuldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/116221\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Paks-2 N\u00fckleer G\u00fc\u00e7 Santrali (NGS) projesini \u00fcstlenen Paks 2 \u015eirketi, Paks\u2019taki 2 yeni VVER-1200 3+ nesil n\u00fckleer santral \u00fcnitesi in\u015faat\u0131 i\u00e7in 30 Haziran 2020 tarihinde Macar Atom Enerjisi Kurumu&#8217;na (HAEA) lisans ba\u015fvurusu yapt\u0131. Belgeler proje \u00e7al\u0131\u015fma takvimine uygun olarak sunuldu.<\/h1>\n<p><strong>Paks NGS<\/strong>\u2019nin 2 yeni <strong>g\u00fc\u00e7 \u00fcnitesi<\/strong>nin <strong>tasar\u0131m\u0131ndan<\/strong>, <strong>in\u015fas\u0131ndan<\/strong> ve <strong>i\u015fletmeye al\u0131nmas\u0131ndan<\/strong> sorumlu Portf\u00f6ys\u00fcz Bakan\u0131 <span style=\"text-decoration: underline;\"><strong>Janos S\u00fcli;<\/strong><\/span><\/p>\n<p>\u201c<strong>283 bin<\/strong> sayfal\u0131k <strong>lisansl\u0131 belgelerin<\/strong> sunulmas\u0131, <strong>Paks-2 n\u00fckleer santrali<\/strong>nin in\u015fas\u0131nda \u00f6nemli bir kilometre ta\u015f\u0131d\u0131r. Haz\u0131rlanan belgeler, yeni g\u00fc\u00e7 \u00fcnitelerinin her a\u00e7\u0131dan <strong>Macarca<\/strong> ve <strong>Avrupa kurallar\u0131<\/strong> ve <strong>g\u00fcvenlik gerekliliklerine uygun<\/strong> oldu\u011funun kan\u0131t\u0131d\u0131r. <strong>Paks-2 tasar\u0131m\u0131<\/strong>nda g\u00fcvenlik kilit \u00f6neme <img loading=\"lazy\" class=\"alignright wp-image-116225\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/paks-2-ngs-insaat-lisansi-belgeleri-macar-atom-enerjisi-kurumuna-sunuldu-1.jpg\" alt=\"\" width=\"320\" height=\"373\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/paks-2-ngs-insaat-lisansi-belgeleri-macar-atom-enerjisi-kurumuna-sunuldu-1.jpg 419w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/paks-2-ngs-insaat-lisansi-belgeleri-macar-atom-enerjisi-kurumuna-sunuldu-1-258x300.jpg 258w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/paks-2-ngs-insaat-lisansi-belgeleri-macar-atom-enerjisi-kurumuna-sunuldu-1-343x400.jpg 343w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/paks-2-ngs-insaat-lisansi-belgeleri-macar-atom-enerjisi-kurumuna-sunuldu-1-43x50.jpg 43w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>sahiptir.Enerji tedariki gerektiren aktif g\u00fcvenlik sistemlerine ek olarak, reakt\u00f6rlere insan veya teknik m\u00fcdahale olmadan \u00e7al\u0131\u015fan pasif g\u00fcvenlik sistemleri ile donat\u0131lacak\u201d dedi.<\/p>\n<p><strong>HAEA<\/strong> ba\u015fvuruyu <strong>12 ay<\/strong> boyunca, bu s\u00fcreyi <strong>3 ay uzatma<\/strong> olas\u0131l\u0131\u011f\u0131 ile de\u011ferlendirecek. Kurum,<strong> lisans belgelerini incelemek<\/strong> i\u00e7in <strong>IAEA (Uluslararas\u0131 Atom Enerji Ajans\u0131)<\/strong> arac\u0131l\u0131\u011f\u0131yla uluslararas\u0131 uzmanlarla \u00e7al\u0131\u015facak.<\/p>\n<p><strong>Avrupa Komisyonu<\/strong> karar\u0131na g\u00f6re, in\u015faat ruhsat\u0131 i\u00e7in ba\u015fvuruda bulunulmas\u0131ndan <strong>3 ay<\/strong> sonra, <strong>Paks-2 \u015eirketi<\/strong> sahada <strong>kaz\u0131 \u00e7al\u0131\u015fmalar\u0131 yapma izni<\/strong> i\u00e7in ba\u015fvurabilecek.<\/p>\n<p><strong>Rusya Devlet Atom Enerjisi Kurumu<\/strong> <strong>Rosatom<\/strong> Genel M\u00fcd\u00fcr\u00fc <strong>Alexei Likhachev<\/strong>, ise <span style=\"text-decoration: underline;\">\u015f\u00f6yle konu\u015ftu:<\/span><\/p>\n<p>\u201c<strong>Modern 3+ nesil n\u00fckleer santral<\/strong> olan <strong>Paks-2 NGS<\/strong>&#8216;nin in\u015fas\u0131na haz\u0131rl\u0131ktaki en \u00f6nemli a\u015fama tamamland\u0131.Macar ortaklarla birlikte, belgelerin haz\u0131rlanmas\u0131 i\u00e7in yo\u011fun bir \u00e7al\u0131\u015fma yap\u0131ld\u0131.Yeni <strong>Macar n\u00fckleer g\u00fc\u00e7 \u00fcniteleri<\/strong>nin in\u015fas\u0131, <strong>karbonsuz \u00fcretim<\/strong> sa\u011flayabilen ve b\u00f6ylece iklim koruma hedeflerine ula\u015f\u0131lmas\u0131n\u0131 destekleyen <strong>n\u00fckleer enerjinin artan rol\u00fcn\u00fc<\/strong> do\u011fruluyor.\u201d<\/p>\n<p><strong>Paks-2 NGS projesi<\/strong>, <strong>14 Ocak 2014<\/strong> tarihli <strong>Rus-Macar h\u00fck\u00fcmetleraras\u0131 anla\u015fmas\u0131<\/strong> temelinde uygulan\u0131yor. <strong>Rosatom<\/strong>\u2019un <strong>ASE IC<\/strong> adl\u0131 m\u00fchendislik \u015firketi <strong>projenin m\u00fcteahhitli\u011fi<\/strong>ni \u00fcstleniyor.2 adet <strong>VVER-1200 tipi \u00fcnite<\/strong> de uluslararas\u0131 i\u015fbirli\u011fi \u00e7er\u00e7evesinde uygulan\u0131yor. T\u00fcrbin makine dairesi ekipman\u0131 <strong>GE<\/strong> taraf\u0131ndan sa\u011flan\u0131rken, <strong>enstr\u00fcmantasyon<\/strong> ve<strong> kontrol<\/strong> ise <strong>Fransa Framatome<\/strong> ve <strong>Almanya Siemens konsorsiyumu<\/strong> taraf\u0131ndan sa\u011flan\u0131yor. <strong>Paks -2 NGS teknolojisi<\/strong>ni sa\u011flayan Rosatom, \u00f6nde gelen k\u00fcresel n\u00fckleer \u015firketleri aras\u0131nda yer al\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Paks-2 N\u00fckleer G\u00fc\u00e7 Santrali (NGS) projesini \u00fcstlenen Paks 2 \u015eirketi, Paks\u2019taki 2 yeni VVER-1200 3+ nesil n\u00fckleer santral \u00fcnitesi in\u015faat\u0131 i\u00e7in 30 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":116226,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[74562,74865,3969,52259,74856,74858,74855,74854,74859,74862,53348,74864,74853,74860,74851,53449,53452,74850,48293,74857,2587,74861,42759,74852,74863],"views":166,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116221"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=116221"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116221\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/116226"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=116221"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=116221"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=116221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}