{"id":116216,"date":"2020-07-01T10:39:12","date_gmt":"2020-07-01T07:39:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=116216"},"modified":"2020-07-01T10:42:25","modified_gmt":"2020-07-01T07:42:25","slug":"akkuyu-ngs-1inci-guc-unitesinin-2inci-katman-ici-kaplama-montaji-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-1inci-guc-unitesinin-2inci-katman-ici-kaplama-montaji-yapildi\/","title":{"rendered":"(Turkish) Akkuyu NGS 1&#8217;inci G\u00fc\u00e7 \u00dcnitesi\u2019nin 2&#8217;inci Katman \u0130\u00e7i Kaplama Montaj\u0131 Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/116216\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u0130n\u015faat\u0131 devam eden Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1&#8217;inci g\u00fc\u00e7 \u00fcnitesi reakt\u00f6r binas\u0131n\u0131n i\u00e7 koruma kaplamas\u0131n\u0131n 2&#8217;inci kat\u0131n\u0131n montaj\u0131 tamamland\u0131. \u0130\u00e7 kaplama, g\u00fc\u00e7 \u00fcnitesinde radyoaktif maddelerin \u00e7evreye yay\u0131lmas\u0131n\u0131 \u00f6nleyen g\u00fcvenlik sisteminin en \u00f6nemli unsurlar\u0131ndan birini olu\u015fturuyor.<\/h1>\n<p><strong>Akkuyu N\u00fckleer A\u015e<\/strong> Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 NGS Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc <strong>Sergey Butckikh<\/strong>; &#8220;\u0130kinci kat i\u00e7 kaplaman\u0131n montaj\u0131yla, ilk g\u00fc\u00e7 \u00fcnitesinin in\u015faat\u0131n\u0131n tamamlanmas\u0131na bir ad\u0131m daha yakla\u015ft\u0131k.&#8221; dedi. Butckikh, konuyla ilgili \u015funlar\u0131 s\u00f6yledi: &#8220;<strong>Reakt\u00f6r binas\u0131<\/strong>n\u0131n en b\u00fcy\u00fck yap\u0131sal elemanlar\u0131ndan biri olan <strong>ikinci katman\u0131n\u0131n<\/strong> i\u00e7 kaplamas\u0131n\u0131n kald\u0131r\u0131lmas\u0131 ve montaj\u0131n\u0131n ba\u015far\u0131yla <img loading=\"lazy\" class=\"alignright wp-image-116218\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-1inci-guc-unitesinin-2inci-katman-ici-kaplama-montaji-yapildi-2.jpg\" alt=\"\" width=\"320\" height=\"195\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-1inci-guc-unitesinin-2inci-katman-ici-kaplama-montaji-yapildi-2.jpg 800w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-1inci-guc-unitesinin-2inci-katman-ici-kaplama-montaji-yapildi-2-300x183.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-1inci-guc-unitesinin-2inci-katman-ici-kaplama-montaji-yapildi-2-768x468.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-1inci-guc-unitesinin-2inci-katman-ici-kaplama-montaji-yapildi-2-500x305.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/07\/akkuyu-ngs-1inci-guc-unitesinin-2inci-katman-ici-kaplama-montaji-yapildi-2-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>tamamlanmas\u0131, bizim i\u00e7in son derece \u00f6nemli bir olay. Bir sonraki a\u015famada, <strong>monte edilen yap\u0131n\u0131n<\/strong> <strong>demir donat\u0131 i\u015fleri<\/strong> tamamlanacak, \u00fczerine kal\u0131p yerle\u015ftirilerek beton d\u00f6k\u00fclecek.&#8221;<\/p>\n<p>D\u00fcnyan\u0131n <strong>en g\u00fc\u00e7l\u00fc paletli vin\u00e7lerinden<\/strong> biri olan <strong>Liebherr LR 13000<\/strong> ile y\u00fcr\u00fct\u00fclen <strong>montaj i\u015flerinin<\/strong> ard\u0131ndan, reakt\u00f6r binas\u0131n\u0131n y\u00fcksekli\u011fi <strong>12 metre<\/strong> artarak <strong>4,95 metre<\/strong>den <strong>16,95 metre<\/strong>ye \u00e7\u0131kt\u0131. Monte edilen yap\u0131n\u0131n toplam a\u011f\u0131rl\u0131\u011f\u0131 <strong>411 tona<\/strong>, \u00e7ap\u0131 ise <strong>20 metreden<\/strong> fazlaya ula\u015f\u0131yor. \u0130\u00e7 kaplama toplamda \u00fc\u00e7 katmandan ve kubbeden olu\u015facak. \u0130\u00e7 kaplaman\u0131n montaj\u0131 <strong>tamamlan\u0131r tamamlanmaz<\/strong> s\u0131zd\u0131rmazl\u0131k a\u00e7\u0131s\u0131ndan test edilecek.<\/p>\n<p>Reakt\u00f6r binas\u0131 i\u00e7 kaplamas\u0131n\u0131n yan\u0131 s\u0131ra <strong>+3 nesil VVER-1200<\/strong> olan yenilik\u00e7i <strong>Rus g\u00fc\u00e7 \u00fcniteleri<\/strong>nin tasar\u0131m\u0131nda d\u0131\u015f kaplama da \u00f6ng\u00f6r\u00fcl\u00fcyor. D\u0131\u015f kaplaman\u0131n amac\u0131,<strong> reakt\u00f6r, buhar jenerat\u00f6r\u00fc<\/strong> ve <strong>di\u011fer ekipmanlar\u0131<\/strong> ola\u011fan\u00fcst\u00fc d\u0131\u015f etkilerden korumak.<\/p>\n<p>Reakt\u00f6r binas\u0131n\u0131n koruyucu \u00e7ift kaplamas\u0131, <strong>Akkuyu NGS Projesi<\/strong>\u2019ne esas olu\u015fturan<strong> VVER-1200 reakt\u00f6rl\u00fc<\/strong> yenilik\u00e7i Rus tasar\u0131m\u0131 reakt\u00f6rlerin ay\u0131r\u0131c\u0131 \u00f6zelli\u011fi olarak \u00f6ne \u00e7\u0131k\u0131yor. Koruyucu kaplaman\u0131n bu tasar\u0131m\u0131 b\u00fcy\u00fck bir g\u00fcvenilirlik sa\u011flarken n\u00fckleer santrallerin g\u00fcvenli\u011finin art\u0131r\u0131lmas\u0131nda da yeni bir ad\u0131m olu\u015fturuyor.\u00a0<strong>VVER-1200 reakt\u00f6rleri<\/strong>yle donat\u0131lm\u0131\u015f <strong>Rus tasar\u0131m\u0131 g\u00fc\u00e7 \u00fcniteleri<\/strong> sadece T\u00fcrkiye\u2019de de\u011fil, <strong>Beyaz Rusya, \u00c7in, M\u0131s\u0131r<\/strong> gibi di\u011fer \u00fclkelerde de kuruluyor. <strong>VVER-1200 reakt\u00f6r\u00fc<\/strong> olan 3 g\u00fc\u00e7 \u00fcnitesi <strong>Rusya\u2019da<\/strong> ba\u015far\u0131l\u0131 bir \u015fekilde i\u015fletiliyor.<\/p>\n<p><strong>Akkuyu NGS<\/strong>&#8216;nin 3 g\u00fc\u00e7 \u00fcnitesinin <strong>in\u015faat<\/strong> ve <strong>montaj i\u015fleri<\/strong> e\u015f zamanl\u0131 olarak y\u00fcr\u00fct\u00fcl\u00fcyor. <strong>1&#8217;inci \u00fcnite t\u00fcrbin adas\u0131<\/strong>n\u0131n temelinin <strong>beton d\u00f6k\u00fcm\u00fc tamamland\u0131<\/strong> ve <strong>kor tutucu monte<\/strong> edildi. 2&#8217;inci \u00fcnitede reakt\u00f6r binas\u0131n\u0131n ve t\u00fcrbin adas\u0131n\u0131n temellerine <strong>beton d\u00f6k\u00fcm\u00fc i\u015fleri<\/strong> tamamlan\u0131yor. <strong>3&#8217;\u00fcnc\u00fc \u00fcnitenin in\u015faat alan\u0131<\/strong>nda n\u00fckleer <strong>ada tesislerinin in\u015fas\u0131<\/strong> i\u00e7in temel \u00e7ukurunun <strong>haz\u0131rl\u0131k i\u015fleri<\/strong> kapsam\u0131nda <strong>delme<\/strong> ve <strong>kontroll\u00fc patlatma \u00e7al\u0131\u015fmalar\u0131<\/strong> planl\u0131 bir \u015fekilde y\u00fcr\u00fct\u00fcl\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130n\u015faat\u0131 devam eden Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1&#8217;inci g\u00fc\u00e7 \u00fcnitesi reakt\u00f6r binas\u0131n\u0131n i\u00e7 koruma kaplamas\u0131n\u0131n 2&#8217;inci kat\u0131n\u0131n montaj\u0131 tamamland\u0131. \u0130\u00e7 kaplama, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":116219,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[13232,19126,48024,5070,52259,74849,1301,53348,72487],"views":219,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116216"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=116216"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/116216\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/116219"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=116216"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=116216"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=116216"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}