{"id":115704,"date":"2020-06-22T12:50:13","date_gmt":"2020-06-22T09:50:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=115704"},"modified":"2020-06-22T12:50:13","modified_gmt":"2020-06-22T09:50:13","slug":"rosatom-belene-ngsye-yonelik-uzlasi-belgesi-imzaladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rosatom-belene-ngsye-yonelik-uzlasi-belgesi-imzaladi\/","title":{"rendered":"(Turkish) &#8217;Rosatom&#8217; Belene NGS&#8217;ye Y\u00f6nelik Uzla\u015f\u0131 Belgesi \u0130mzalad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/115704\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Rusya Devlet Atom Enerjisi Kurumu Rosatom, Bulgaristan&#8217;daki Belene N\u00fckleer Santrali (NGS) ile ilgili olarak stratejik yat\u0131r\u0131mc\u0131 se\u00e7im\u00a0 prosed\u00fcr\u00fc \u00e7er\u00e7evesinde Framatome SAS (Fransa) ve GE Steam Power ile Uzla\u015f\u0131 Belgesi imzalad\u0131.<\/h1>\n<p>Uzla\u015f\u0131 Belgelerini Rosatom&#8217;un <strong>Kurumsal Geli\u015fim ve Uluslararas\u0131 \u0130\u015fletme<\/strong> Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131, Sat\u0131\u015ftan Sorumlu K\u0131demli Ba\u015fkan Yard\u0131mc\u0131s\u0131 <strong>Kirill Komarov<\/strong>, Framatome\u2019un Sat\u0131\u015f, B\u00f6lgesel Platformlar ve Enstr\u00fcman Kontrol\u2019den Sorumlu Ba\u015fkan Yard\u0131mc\u0131s\u0131 <strong>Fr\u00e9d\u00e9ric Leli\u00e8vre<\/strong>, ve General Electric Steam Power Ba\u015fkan\u0131 <strong>Michael Keroulle<\/strong> imzalad\u0131.<\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-115706\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/rosatom-belene-ngsye-yonelik-uzlasi-belgesi-imzaladi.jpeg\" alt=\"\" width=\"320\" height=\"191\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/rosatom-belene-ngsye-yonelik-uzlasi-belgesi-imzaladi.jpeg 865w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/rosatom-belene-ngsye-yonelik-uzlasi-belgesi-imzaladi-300x179.jpeg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/rosatom-belene-ngsye-yonelik-uzlasi-belgesi-imzaladi-768x457.jpeg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/rosatom-belene-ngsye-yonelik-uzlasi-belgesi-imzaladi-500x298.jpeg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/rosatom-belene-ngsye-yonelik-uzlasi-belgesi-imzaladi-80x48.jpeg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Anla\u015fmalar \u00e7er\u00e7evesinde \u015firketler, <strong>Belene NGS in\u015fas\u0131 ihalesi<\/strong>ne\u00a0 kat\u0131lmak i\u00e7in birlikte \u00e7al\u0131\u015facaklar. Anla\u015fman\u0131n bir par\u00e7as\u0131 olarak, <strong>Rosatom<\/strong> Devlet \u015eirketi rekabet\u00e7i bir s\u00fcrecin ard\u0131ndan <strong>projenin\u00a0 stratejik yat\u0131r\u0131mc\u0131s\u0131<\/strong> olursa, <strong>General Electric<\/strong>, Arabelle merkezli bir\u00a0<strong>t\u00fcrbin-jenerat\u00f6r setinin<\/strong> orta\u011f\u0131 ve <strong>Turbine Hall Equipment<\/strong> ve <strong>Framatome SAS<\/strong> da Bulgar <strong>NGS\u2019nin Enstr\u00fcmantasyon<\/strong> ve <strong>Kontrol (I&amp;C) Sistemleri<\/strong>nin ana ortaklar\u0131 olacakt\u0131r.<\/p>\n<p>Kirill Komarov, \u201c<strong>\u0130mzal\u0131 Uzla\u015f\u0131 Belgeleri<\/strong> \u015firketlerimiz aras\u0131ndaki <strong>y\u00fcksek g\u00fcven d\u00fczeyinin<\/strong> alt\u0131n\u0131 \u00e7iziyor,\u201d diyerek \u015funlar\u0131 s\u00f6yledi:\u00a0 \u201cEminim ki <strong>n\u00fckleer end\u00fcstri liderleri<\/strong> aras\u0131ndaki uluslararas\u0131\u00a0 i\u015fbirli\u011fi, <strong>Belene NGS<\/strong>&#8216;nin hayata ge\u00e7irilmesi i\u00e7in <strong>en iyi finansal ve teknik ko\u015fullar<\/strong>\u0131n yarat\u0131lmas\u0131na yard\u0131mc\u0131 olacak.&#8221;<\/p>\n<p>Daha \u00f6nce, <strong>Rosatom, Framatome SAS ve General Electric, \u00c7in Ulusal N\u00fckleer \u015eirketi (CNNC)<\/strong> ve <strong>Kore Hidro &amp; N\u00fckleer G\u00fc\u00e7 \u015eirketi (KHNP)<\/strong> ile birlikte <strong>Belene NGS projesi<\/strong>ne y\u00f6nelik ba\u015fvuru yapan <strong>5 \u015firketten<\/strong> listeye girenler aras\u0131nda yer alm\u0131\u015flard\u0131.<\/p>\n<p><strong>Rosatom, Paks-2 NGS (Macaristan)<\/strong> ve <strong>Hanhikivi-1 NGS (Finlandiya)\u00a0<\/strong>gibi uluslararas\u0131 projelerde <strong>Framatome SAS<\/strong> ve <strong>General Electric<\/strong> ile ba\u015far\u0131l\u0131 i\u015fbirli\u011finde bulundu. T\u00fcrkiye&#8217;deki <strong>Akkuyu NGS projesi<\/strong> ve M\u0131s\u0131r&#8217;daki <strong>El-Dabaa NGS projesi<\/strong> <strong>General Electric<\/strong> ile i\u015fbirli\u011fi \u00e7er\u00e7evesinde y\u00fcr\u00fct\u00fcl\u00fcrken <strong>GE<\/strong> ile <strong>Rosatom<\/strong> aras\u0131ndaki ortak giri\u015fim, <strong>t\u00fcrbin adas\u0131<\/strong> i\u00e7in bir <strong>ekipman tedarik\u00e7isi<\/strong> olarak hizmet sa\u011fl\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet Atom Enerjisi Kurumu Rosatom, Bulgaristan&#8217;daki Belene N\u00fckleer Santrali (NGS) ile ilgili olarak stratejik yat\u0131r\u0131mc\u0131 se\u00e7im\u00a0 prosed\u00fcr\u00fc \u00e7er\u00e7evesinde Framatome SAS (Fransa) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":115706,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[13232,74231,74225,74232,74219,74234,74233,5070,52674,52259,74226,74220,74223,2422,74221,785,74228,20038,74224,36443,74230,53348,2587,42759,74227,74222,74229],"views":262,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/115704"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=115704"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/115704\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/115706"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=115704"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=115704"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=115704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}