{"id":115481,"date":"2020-06-17T20:18:51","date_gmt":"2020-06-17T17:18:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=115481"},"modified":"2020-06-17T20:21:21","modified_gmt":"2020-06-17T17:21:21","slug":"gokceada-ve-bozcaada-kendi-elektrigini-uretecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gokceada-ve-bozcaada-kendi-elektrigini-uretecek\/","title":{"rendered":"(Turkish) G\u00f6k\u00e7eada ve Bozcaada Kendi Elektri\u011fini \u00dcretecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/115481\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u00c7anakkale&#8217;nin Kuzey Ege&#8217;deki turizm cennetlerinden olan G\u00f6k\u00e7eada ve Bozcaada&#8217;n\u0131n ihtiyac\u0131 olan enerjinin, yenilenebilir kaynaklardan sa\u011flanmas\u0131na y\u00f6nelik olarak ba\u015fvurulan Avrupa Birli\u011fi (AB) destekli <img loading=\"lazy\" class=\"alignright wp-image-115483\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/gokceada-ve-bozcaada-kendi-elektrigini-uretecek.jpg\" alt=\"\" width=\"320\" height=\"205\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/gokceada-ve-bozcaada-kendi-elektrigini-uretecek.jpg 760w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/gokceada-ve-bozcaada-kendi-elektrigini-uretecek-300x193.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/gokceada-ve-bozcaada-kendi-elektrigini-uretecek-500x321.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/gokceada-ve-bozcaada-kendi-elektrigini-uretecek-78x50.jpg 78w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>proje kabul edildi.<\/h1>\n<p><strong>&#8220;Horizon2020&#8221;<\/strong> ismine sahip\u00a0<strong>6 milyon avro<\/strong> b\u00fct\u00e7eli projeyle <strong>2<\/strong> adaya <strong>yeni nesil depolama sistemleri, g\u00fcne\u015f enerjisi panelleri<\/strong> ve <strong>\u015febeke modelleri<\/strong> kurularak \u00fcretilecek enerjinin <strong>ka\u00e7 megawatt g\u00fcc\u00fcnde olaca\u011f\u0131<\/strong>, yap\u0131lacak \u00e7al\u0131\u015fmalar\u0131n sonucunda belirlenmi\u015f olacak.<\/p>\n<p><strong>Troya \u00c7evre Derne\u011fi<\/strong>&#8216;nin Y\u00f6netim Kurulu Ba\u015fkan\u0131 <strong>Oral Kaya <\/strong>yapt\u0131\u011f\u0131 a\u00e7\u0131klamada,\u00a0&#8220;Bu proje, bir <strong>yenilik program\u0131<\/strong> asl\u0131nda. Bu programda <strong>yeni modeller<\/strong> ve <strong>ara\u015ft\u0131rma teknikleri<\/strong> y\u00f6n\u00fcnde ara\u015ft\u0131rmalar yap\u0131l\u0131yor. T\u00fcrkiye&#8217;den <strong>4 kurum<\/strong> ile <strong>AB<\/strong>&#8216;nin bu projesine yapt\u0131\u011f\u0131m\u0131z ba\u015fvuru kabul edildi.&#8221; dedi.<\/p>\n<p><strong>G\u00f6k\u00e7eada ve Bozcaada<\/strong>&#8216;ya enerji sa\u011flayan sistemler\u00a0<strong>yenilenebilir enerji kaynaklar\u0131ndan olu\u015facak<\/strong> olup bu konuda\u00a0ortak \u00e7al\u0131\u015facaklar\u0131 kurumlardan birinin ise <strong>Uluda\u011f Elektrik Da\u011f\u0131t\u0131m A\u015e. (UEDA\u015e)<\/strong> olaca\u011f\u0131 da belirtilmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7anakkale&#8217;nin Kuzey Ege&#8217;deki turizm cennetlerinden olan G\u00f6k\u00e7eada ve Bozcaada&#8217;n\u0131n ihtiyac\u0131 olan enerjinin, yenilenebilir kaynaklardan sa\u011flanmas\u0131na y\u00f6nelik olarak ba\u015fvurulan Avrupa Birli\u011fi (AB) destekli [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":115483,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[73967,25917,73962,73966,4427,52674,2625,52259,73965,53157,73971,73964,73970,54979,73961,73963,73969,73968],"views":397,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/115481"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=115481"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/115481\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/115483"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=115481"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=115481"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=115481"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}