{"id":115450,"date":"2020-06-17T10:48:47","date_gmt":"2020-06-17T07:48:47","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=115450"},"modified":"2020-06-17T10:49:13","modified_gmt":"2020-06-17T07:49:13","slug":"aksaray-belediyesi-5-mw-ges-kurma-calismalarina-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksaray-belediyesi-5-mw-ges-kurma-calismalarina-basladi\/","title":{"rendered":"(Turkish) &#8217;Aksaray Belediyesi&#8217; 5 MW GES&#8217;i \u0130\u00e7in Kurulum \u00c7al\u0131\u015fmalar\u0131na Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/115450\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong><img loading=\"lazy\" class=\"alignright wp-image-115452\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/aksaray-belediyesi-g\u00fcne\u015f-enerjisi-1200x1200.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/aksaray-belediyesi-g\u00fcne\u015f-enerjisi-1200x1200.jpg 640w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/aksaray-belediyesi-g\u00fcne\u015f-enerjisi-1200x1200-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/aksaray-belediyesi-g\u00fcne\u015f-enerjisi-1200x1200-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/aksaray-belediyesi-g\u00fcne\u015f-enerjisi-1200x1200-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/aksaray-belediyesi-g\u00fcne\u015f-enerjisi-1200x1200-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Aksaray Belediyesi taraf\u0131ndan 5 megavatl\u0131k g\u00fcne\u015f enerji santrali kurmaya y\u00f6nelik \u00e7al\u0131\u015fmalara ba\u015fland\u0131.<\/strong><\/h1>\n<p>Aksaray\u2019\u0131n Ba\u011fl\u0131 K\u00f6y Ar\u0131tma Tesisleri b\u00f6lgesine <strong>100 bin metre karelik<\/strong> alana kurulacak tesisin, <strong>18 bin 400<\/strong> g\u00fcne\u015f paneli ve <strong>77 invert\u00f6r<\/strong> i\u00e7ermesi planlan\u0131rken ges tesisi ile yakla\u015f\u0131k <strong>3 bin 500 konutun<\/strong> enerjisine denk <strong>elektrik \u00fcretimi<\/strong> ger\u00e7ekle\u015ftirilmesi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p><strong>Projenin hayata ge\u00e7mesi<\/strong> ile birlikte elde edilecek <strong>enerji ar\u0131tma tesisinde<\/strong> kullan\u0131lacak ve kalan enerji ise <strong>ekonomiye kazand\u0131r\u0131larak gelir kayna\u011f\u0131<\/strong> sa\u011flanacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksaray Belediyesi taraf\u0131ndan 5 megavatl\u0131k g\u00fcne\u015f enerji santrali kurmaya y\u00f6nelik \u00e7al\u0131\u015fmalara ba\u015fland\u0131. Aksaray\u2019\u0131n Ba\u011fl\u0131 K\u00f6y Ar\u0131tma Tesisleri b\u00f6lgesine 100 bin metre karelik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":115452,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[10080,5070,52259,53157,54979],"views":173,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/115450"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=115450"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/115450\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/115452"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=115450"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=115450"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=115450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}