{"id":115166,"date":"2020-06-12T14:48:42","date_gmt":"2020-06-12T11:48:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=115166"},"modified":"2020-06-12T14:48:42","modified_gmt":"2020-06-12T11:48:42","slug":"2020-mayis-sonu-itibari-ile-kurulu-gucun-6-152-mwlik-kismi-gunesten","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2020-mayis-sonu-itibari-ile-kurulu-gucun-6-152-mwlik-kismi-gunesten\/","title":{"rendered":"(Turkish) 2020 May\u0131s Sonu \u0130tibari ile Kurulu G\u00fcc\u00fcn 6.152 MW\u2019l\u0131k K\u0131sm\u0131 G\u00fcne\u015f&#8217;ten!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/115166\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>T\u00fcrkiye Elektrik \u0130letim A.\u015e., May\u0131s 2020 kurulu g\u00fc\u00e7 raporunu yay\u0131nlarken rapor verilerine g\u00f6re, toplam kurulu g\u00fc\u00e7 91.932 MW olurken 2020 May\u0131s ay\u0131 sonu itibariyle kurulu g\u00fcc\u00fcn 6.152 MW\u2019l\u0131k k\u0131sm\u0131 g\u00fcne\u015f enerjisi santrallerinden elde edildi.<\/strong><\/h1>\n<p><strong>TE\u0130A\u015e<\/strong>\u2019\u0131n ayl\u0131k olarak yay\u0131nlad\u0131\u011f\u0131 <strong>kurulu g\u00fc\u00e7 raporuna g\u00f6re<\/strong>, may\u0131s ay\u0131nda <strong>elektrik \u00fcretim kurulu g\u00fcc\u00fc<\/strong> bir \u00f6nceki aya g\u00f6re <strong>367,6 MW<\/strong> art\u0131\u015f ile <strong>91.932 MW<\/strong> de\u011ferine ula\u015ft\u0131.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-115169\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/kurulu-g\u00fc\u00e7-grafik-may\u0131s.jpg\" alt=\"\" width=\"550\" height=\"241\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/kurulu-g\u00fc\u00e7-grafik-may\u0131s.jpg 1114w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/kurulu-g\u00fc\u00e7-grafik-may\u0131s-300x131.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/kurulu-g\u00fc\u00e7-grafik-may\u0131s-768x336.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/kurulu-g\u00fc\u00e7-grafik-may\u0131s-1024x449.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/kurulu-g\u00fc\u00e7-grafik-may\u0131s-500x219.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/kurulu-g\u00fc\u00e7-grafik-may\u0131s-80x35.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>May\u0131s ay\u0131 sonu itibariyle kurulu g\u00fcc\u00fcn <strong>25.655,6 MW<\/strong>\u2019\u0131n\u0131 <strong>do\u011falgaz<\/strong> yak\u0131tl\u0131 santraller, <strong>21,131 MW<\/strong>\u2019\u0131n\u0131 <strong>barajl\u0131 hidroelektrik santralleri<\/strong>, <strong>10,097 MW<\/strong>\u2019\u0131n\u0131 <strong>linyit yak\u0131tl\u0131 santraller<\/strong>, <strong>8,967 MW<\/strong>\u2019\u0131n\u0131 <strong>ithal k\u00f6m\u00fcr yak\u0131tl\u0131 santraller<\/strong>, <strong>7,884 MW<\/strong>\u2019\u0131n\u0131 <strong>akarsu tipi hidroelektrik santraller<\/strong>, <strong>7,810 MW<\/strong>\u2019\u0131n\u0131 <strong>r\u00fczgar santralleri<\/strong>,<strong> 6,152 MW<\/strong>\u2019\u0131n\u0131 <strong>g\u00fcne\u015f santralleri<\/strong>,<strong> 1.514,7 MW<\/strong>\u2019\u0131n\u0131 <strong>jeotermal santraller<\/strong>, <strong>827 MW<\/strong>\u2019\u0131n\u0131 <strong>biyok\u00fctle santralleri<\/strong>, <strong>811 MW<\/strong>\u2019\u0131n\u0131 <strong>ta\u015fk\u00f6m\u00fcr\u00fc yak\u0131tl\u0131 santraller<\/strong>, <strong>405 MW<\/strong>\u2019\u0131n\u0131 <strong>asfaltit k\u00f6m\u00fcr yak\u0131tl\u0131 santraller<\/strong>, <strong>364 MW<\/strong>\u2019\u0131n\u0131 <strong>at\u0131k \u0131s\u0131 santralleri<\/strong> ve <strong>306 MW<\/strong>\u2019\u0131n\u0131 da<strong> fuel oil yak\u0131tl\u0131 santraller<\/strong> meydana getirdi.<\/p>\n<p>Lisanss\u0131z santraller <strong>% 7<\/strong>; lisansl\u0131 santraller ise <strong>% 97<\/strong>\u2019lik k\u0131s\u0131mdan meydana gelirken T\u00fcrkiye\u2019deki <strong>lisanss\u0131z g\u00fcne\u015f enerjisi santral<\/strong> say\u0131s\u0131 ise\u00a0<strong>7.062<\/strong> ve lisansl\u0131 <strong>GES<\/strong> say\u0131s\u0131 ise <strong>18<\/strong> olmu\u015ftur.<\/p>\n<p>Rapora <a href=\"https:\/\/webapi.teias.gov.tr\/file\/7ec45c45-d93e-4e55-9d29-bdb5c747f86e?download\" target=\"_blank\" rel=\"nofollow noopener\">Ula\u015farak \u0130ndirmek \u0130\u00e7in TIKLAYIN&gt;&gt;&gt;\u00a0<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Elektrik \u0130letim A.\u015e., May\u0131s 2020 kurulu g\u00fc\u00e7 raporunu yay\u0131nlarken rapor verilerine g\u00f6re, toplam kurulu g\u00fc\u00e7 91.932 MW olurken 2020 May\u0131s ay\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":115170,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[64024,92,5070,73569,52259,2326,35038,1325,53157,73572,73571,73570,53036,1582,54431,4309],"views":261,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/115166"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=115166"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/115166\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/115170"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=115166"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=115166"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=115166"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}