{"id":115134,"date":"2020-06-11T20:39:02","date_gmt":"2020-06-11T17:39:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=115134"},"modified":"2020-06-11T20:39:02","modified_gmt":"2020-06-11T17:39:02","slug":"generalsolar-aslankaya-group-ile-2-4-mwlik-ges-icin-sozlesme-imzaladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/generalsolar-aslankaya-group-ile-2-4-mwlik-ges-icin-sozlesme-imzaladi\/","title":{"rendered":"(Turkish) &#8217;Generalsolar&#8217; Aslankaya Group ile 2.4 MW\u2019l\u0131k GES \u0130\u00e7in S\u00f6zle\u015fme \u0130mzalad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/115134\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Generalsolar Enerji, b\u00f6lgenin en b\u00fcy\u00fck \u00e7elik d\u00f6k\u00fcm ve T\u00fcrkiye\u2019nin en b\u00fcy\u00fck kat\u0131 sabun <img loading=\"lazy\" class=\"alignright wp-image-115136\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/generalsolar-aslankaya-group-ile-2-4-mwlik-ges-icin-sozlesme-imzaladi.jpg\" alt=\"\" width=\"320\" height=\"320\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/generalsolar-aslankaya-group-ile-2-4-mwlik-ges-icin-sozlesme-imzaladi.jpg 488w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/generalsolar-aslankaya-group-ile-2-4-mwlik-ges-icin-sozlesme-imzaladi-150x150.jpg 150w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/generalsolar-aslankaya-group-ile-2-4-mwlik-ges-icin-sozlesme-imzaladi-300x300.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/generalsolar-aslankaya-group-ile-2-4-mwlik-ges-icin-sozlesme-imzaladi-400x400.jpg 400w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/generalsolar-aslankaya-group-ile-2-4-mwlik-ges-icin-sozlesme-imzaladi-50x50.jpg 50w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/06\/generalsolar-aslankaya-group-ile-2-4-mwlik-ges-icin-sozlesme-imzaladi-100x100.jpg 100w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ve gliserin \u00fcretim tesislerine sahip olan Aslankaya Group ile de 2.4 MW\u2019l\u0131k g\u00fcne\u015f enerji santrali i\u00e7in s\u00f6zle\u015fme imzalad\u0131\u011f\u0131n\u0131 duyurdu.<\/strong><\/h1>\n<p><strong>2009 y\u0131l\u0131nda<\/strong> g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcne giri\u015f yapan ve <strong>PV mod\u00fcl \u00fcretimi<\/strong> ile yola \u00e7\u0131kan<strong> General Solar Enerji<\/strong>, <strong>GES\u2019lerin proje geli\u015ftirme, tasar\u0131m ve kurulumlar\u0131n\u0131 da<\/strong> \u00fcstlenerek <strong>2013<\/strong> y\u0131l\u0131nda faaliyete ge\u00e7ti.<\/p>\n<p>\u015eirket, T\u00fcrkiye\u2019nin en b\u00fcy\u00fck <strong>kat\u0131 sabun ve gliserin \u00fcretim tesisleri<\/strong>ne sahip olan<strong> Aslankaya Group<\/strong> ile de <strong>2.4 MW<\/strong>\u2019l\u0131k <strong>g\u00fcne\u015f enerji santrali<\/strong> i\u00e7in s\u00f6zle\u015fme imzalad\u0131\u011f\u0131n\u0131 duyurdu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Generalsolar Enerji, b\u00f6lgenin en b\u00fcy\u00fck \u00e7elik d\u00f6k\u00fcm ve T\u00fcrkiye\u2019nin en b\u00fcy\u00fck kat\u0131 sabun ve gliserin \u00fcretim tesislerine sahip olan Aslankaya Group ile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":115136,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[73547,52259,73549,73550,61365,35038,6014,53157,73546,73548,6413],"views":325,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/115134"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=115134"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/115134\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/115136"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=115134"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=115134"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=115134"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}