{"id":11477,"date":"2013-06-01T09:08:43","date_gmt":"2013-06-01T06:08:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=11477"},"modified":"2013-06-01T09:08:43","modified_gmt":"2013-06-01T06:08:43","slug":"vestas-latin-amerikada-yerini-iyice-saglamlastirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/vestas-latin-amerikada-yerini-iyice-saglamlastirdi\/","title":{"rendered":"(Turkish) Vestas, Latin Amerika\u2019da Yerini \u0130yice Sa\u011flamla\u015ft\u0131rd\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/11477\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Vestas, Forestal Uruguaya\u2019 dan sipari\u015f ald\u0131\u011f\u0131 90MW \u2018l\u0131k projeyle Latin Amerika\u2019da yerini iyice sa\u011flamla\u015ft\u0131rd\u0131. Vestas, Uruguay\u2019\u0131n ba\u015fkenti olan Montevideo\u2019nun kuzeyindeki Pintado r\u00fczgar \u00e7iftli\u011fine t\u00fcrbi<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/vestas-ruzgar-turibini-icci.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-9982\" title=\"vestas-r\u00fczgar-t\u00fcrbini-latin-amerika\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/vestas-ruzgar-turibini-icci-300x222.jpg\" alt=\"\" width=\"300\" height=\"222\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/vestas-ruzgar-turibini-icci-300x222.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/vestas-ruzgar-turibini-icci-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/vestas-ruzgar-turibini-icci.jpg 400w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>n tedarik edecek.T\u00fcrbinler 2013 \u00fcn \u00fc\u00e7\u00fcnc\u00fc \u00e7eyre\u011finde temin edilmi\u015f olunacak ve proje 2014 y\u0131l\u0131nda hayata ge\u00e7irilecek.<\/strong><\/p>\n<p>Taraflar aras\u0131nda 15 y\u0131ll\u0131k bir hizmet anla\u015fmas\u0131 imzaland\u0131.<\/p>\n<p>Bu Vestas\u2019\u0131n bu y\u0131l Uruguay\u2019da ald\u0131\u011f\u0131 ikinci i\u015f.Ge\u00e7ti\u011fimiz ocak ay\u0131nda Minas r\u00fczgar \u00e7iftli\u011finde kurulmak \u00fczere Frans\u0131z Akuo Energy\u2019den 42 MW l\u0131k i\u015f ald\u0131.<\/p>\n<p>Uruguay, r\u00fczgar sekt\u00f6r\u00fcndeki etkisini art\u0131rmak i\u00e7in en pop\u00fcler Latin Amerikan pazar\u0131 haline gelmi\u015f durumda.<\/p>\n<p>Ocak ay\u0131nda Alman t\u00fcrbin \u00fcreticisi Nordex, yapt\u0131\u011f\u0131 iki antla\u015fmayla toplamda 107MW l\u0131k i\u015f ald\u0131.Bunun 50 MW l\u0131k k\u0131sm\u0131 Florida r\u00fczgar projesinde kullan\u0131lmak \u00fczere Akuo Energy ile anla\u015f\u0131ld\u0131.<\/p>\n<p>Daha bir ay \u00f6nce the Inter-American Development Bank (IDB), bu iki r\u00fczgar tarlas\u0131n\u0131n yap\u0131m\u0131n\u0131n finanse edilmesi i\u00e7in 18 milyon dolarl\u0131k kredi vermeye raz\u0131 olmu\u015ftu..<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/05\/31\/vestas-latin-amerikada-yerini-iyice-saglamlastirdi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Vestas, Forestal Uruguaya\u2019 dan sipari\u015f ald\u0131\u011f\u0131 90MW \u2018l\u0131k projeyle Latin Amerika\u2019da yerini iyice sa\u011flamla\u015ft\u0131rd\u0131. Vestas, Uruguay\u2019\u0131n ba\u015fkenti olan Montevideo\u2019nun kuzeyindeki Pintado r\u00fczgar \u00e7iftli\u011fine [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9982,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,165,5696,69,2511,16,324,4734],"views":532,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11477"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=11477"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11477\/revisions"}],"predecessor-version":[{"id":11478,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11477\/revisions\/11478"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9982"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=11477"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=11477"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=11477"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}