{"id":11450,"date":"2013-05-31T09:09:45","date_gmt":"2013-05-31T06:09:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=11450"},"modified":"2013-05-31T09:09:45","modified_gmt":"2013-05-31T06:09:45","slug":"lisanssiz-elektrikte-kafalar-karisti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/lisanssiz-elektrikte-kafalar-karisti\/","title":{"rendered":"(Turkish) Lisanss\u0131z Elektrikte Kafalar Kar\u0131\u015ft\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/11450\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>EPDK, ikincil mevzuat \u00e7al\u0131\u015fmalar\u0131 tamamlanana kadar lisanss\u0131z elektrik \u00fcretimine ili\u015fkin i\u015flem tesis edilmemesi gerekti\u011fini bildirdi. Elektrik piyasas\u0131nda ya\u015fanan yo\u011fun mevzuat de\u011fi\u015fikli\u011fi trafi\u011fi, kar\u0131\u015f\u0131kl\u0131\u011f\u0131 da beraberinde getirdi.<\/strong><\/p>\n<p>Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK), 7 May\u0131s\u2019ta 21 enerji da\u011f\u0131t\u0131m \u015firketlerine lisanss\u0131z elektrik \u00fcretimi konusunda bir yaz\u0131 g\u00f6nderdi.<\/p>\n<p>Elektrik Piyasas\u0131 Kanunu\u2019na g\u00f6re, lisans alma ve \u015firket kurma y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcnden muaf faaliyetlerin an\u0131msat\u0131ld\u0131\u011f\u0131 yaz\u0131da, \u201cimdat gruplar\u0131 ve iletim ya da da\u011f\u0131t\u0131m sistemiyle ba\u011flant\u0131 tesis etmeyen \u00fcretim tesisi\u201d, \u201ckurulu g\u00fcc\u00fc azami 1 megavatl\u0131k yenilenebilir enerji kaynaklar\u0131na dayal\u0131 \u00fcretim tesisi\u201d, \u201cbelediyelerin kat\u0131 at\u0131k tesisleri ile ar\u0131tma tesisi \u00e7amurlar\u0131n\u0131n bertaraf\u0131nda kullan\u0131lmak \u00fczere kurulan elektrik \u00fcretim tesisi\u201d, \u201cmikrokojenerasyon tesisleri ile bakanl\u0131k\u00e7a belirlenecek verimlilik de\u011ferini sa\u011flayan kojenerasyon tesislerinden Enerji Piyasas\u0131 D\u00fczenleme Kurulu\u2019nca belirlenecek olan kategoride olanlar\u0131\u201d, \u201c\u00fcretti\u011fi enerjinin tamam\u0131n\u0131 iletim veya da\u011f\u0131t\u0131m sistemine vermeden kullanan, \u00fcretimi ve t\u00fcketimi ayn\u0131 \u00f6l\u00e7\u00fcm noktas\u0131nda olan, yenilenebilir enerji kaynaklar\u0131na dayal\u0131 \u00fcretim tesisleri\u201dnin lisans\u0131z \u00e7al\u0131\u015fma yapabileceklerine i\u015faret edildi.<\/p>\n<p>Kanunda bu ki\u015filerin sisteme ba\u011flanmas\u0131, ba\u015fvuru ve denetiminin \u00e7\u0131kar\u0131lan y\u00f6netmelikle d\u00fczenlenece\u011fi h\u00fckm\u00fc bulundu\u011funa yer verilen yaz\u0131da, gerekli y\u00f6netmelik ve tebli\u011f de\u011fi\u015fiklerine y\u00f6nelik \u00e7al\u0131\u015fmalar\u0131n devam etti\u011fi bildirildi.<\/p>\n<p>Yaz\u0131da, hukuki sonu\u00e7 do\u011fmas\u0131na mahal vermemek amac\u0131yla kurum taraf\u0131ndan ikincil mevzuat \u00e7al\u0131\u015fmalar\u0131 tamamlanana kadar lisans\u0131z elektrik \u00fcretimine ili\u015fkin i\u015flem tesis edilmemesi gerekti\u011fi kaydedildi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/05\/30\/lisanssiz-elektrikte-kafalar-karisti\/\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.EPDK, ikincil mevzuat \u00e7al\u0131\u015fmalar\u0131 tamamlanana kadar lisanss\u0131z elektrik \u00fcretimine ili\u015fkin i\u015flem tesis edilmemesi gerekti\u011fini bildirdi. Elektrik piyasas\u0131nda ya\u015fanan yo\u011fun mevzuat de\u011fi\u015fikli\u011fi trafi\u011fi, kar\u0131\u015f\u0131kl\u0131\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9237,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[1451,1588,63,67,1046,165,750,3518,2282,5679],"views":723,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11450"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=11450"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11450\/revisions"}],"predecessor-version":[{"id":11451,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/11450\/revisions\/11451"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9237"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=11450"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=11450"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=11450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}