{"id":114386,"date":"2020-05-28T16:25:10","date_gmt":"2020-05-28T13:25:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=114386"},"modified":"2020-05-28T16:28:42","modified_gmt":"2020-05-28T13:28:42","slug":"generalsolar-enerji-14-mwlik-gunes-santrali-ilk-etabi-icin-sozlesme-imzaladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/generalsolar-enerji-14-mwlik-gunes-santrali-ilk-etabi-icin-sozlesme-imzaladi\/","title":{"rendered":"(Turkish) &#8217;Generalsolar Enerji&#8217; 14 MW&#8217;l\u0131k G\u00fcne\u015f Santrali \u0130lk Etap S\u00f6zle\u015fmesini \u0130mzalad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/114386\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Generalsolar Enerji ile Pet Preform <img loading=\"lazy\" class=\"alignright wp-image-114389\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/generalsolar-enerji-14-mwlik-gunes-santrali-ilk-etabi-icin-sozlesme-imzaladi-1.jpg\" alt=\"\" width=\"320\" height=\"203\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/generalsolar-enerji-14-mwlik-gunes-santrali-ilk-etabi-icin-sozlesme-imzaladi-1.jpg 1170w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/generalsolar-enerji-14-mwlik-gunes-santrali-ilk-etabi-icin-sozlesme-imzaladi-1-300x190.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/generalsolar-enerji-14-mwlik-gunes-santrali-ilk-etabi-icin-sozlesme-imzaladi-1-768x486.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/generalsolar-enerji-14-mwlik-gunes-santrali-ilk-etabi-icin-sozlesme-imzaladi-1-1024x649.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/generalsolar-enerji-14-mwlik-gunes-santrali-ilk-etabi-icin-sozlesme-imzaladi-1-500x317.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/generalsolar-enerji-14-mwlik-gunes-santrali-ilk-etabi-icin-sozlesme-imzaladi-1-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>sekt\u00f6r\u00fcnde d\u00fcnya liderlerinden K\u00d6KSAN Holding aras\u0131nda \u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f santrali kurulumuna y\u00f6nelik bir s\u00f6zle\u015fme imzaland\u0131.<\/strong><\/h1>\n<p>Tek \u00e7at\u0131da yer alacak olan T\u00fcrkiye\u2019nin en b\u00fcy\u00fck projesi olma \u00f6zelli\u011fine sahip\u00a0<strong>14 MW<\/strong>&#8216;l\u0131k g\u00fcne\u015f enerjisi santralinin <strong>4.2 MW\u2019l\u0131k<\/strong>\u00a0<em>1&#8217;inci etab\u0131na<\/em> ba\u015flamaya y\u00f6nelik bir s\u00f6zle\u015fme imzaland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Generalsolar Enerji ile Pet Preform sekt\u00f6r\u00fcnde d\u00fcnya liderlerinden K\u00d6KSAN Holding aras\u0131nda \u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f santrali kurulumuna y\u00f6nelik bir s\u00f6zle\u015fme imzaland\u0131. Tek \u00e7at\u0131da [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":114388,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[45409,52259,61365,53157,72782,72781],"views":168,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/114386"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=114386"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/114386\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/114388"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=114386"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=114386"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=114386"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}