{"id":114322,"date":"2020-05-27T11:43:27","date_gmt":"2020-05-27T08:43:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=114322"},"modified":"2020-05-27T11:48:05","modified_gmt":"2020-05-27T08:48:05","slug":"ufuk-senturk-aydinlilari-jeotermal-kaynaklarimiz-ile-isitmaya-haziriz","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ufuk-senturk-aydinlilari-jeotermal-kaynaklarimiz-ile-isitmaya-haziriz\/","title":{"rendered":"(Turkish) Ufuk \u015eent\u00fcrk: &#8220;Ayd\u0131nl\u0131lar\u0131 Jeotermal Kaynaklar\u0131m\u0131z ile Is\u0131tmaya Haz\u0131r\u0131z!&#8221;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/114322\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Jeotermal Elektrik Santral Yat\u0131r\u0131mc\u0131lar\u0131 Derne\u011fi (JESDER), Ayd\u0131n&#8217;daki yat\u0131r\u0131mlar\u0131n\u0131 ve desteklerini aral\u0131ks\u0131z devam ettiriyor. Ayd\u0131n&#8217;da toplam 29 santral ve 790 Mw kurulu g\u00fc\u00e7 ile b\u00f6lgenin elektrik enerji ihtiyac\u0131n\u0131n 2,5 kat\u0131 oran\u0131nda enerji arz\u0131 sa\u011flayan JESDER \u00fcyesi \u015firketler, \u0131s\u0131tma ve s\u0131cak su alan\u0131nda da hizmete haz\u0131r olduklar\u0131n\u0131 duyurdu. JESDER Ba\u015fkan\u0131 Ufuk \u015eent\u00fcrk; &#8220;JESDER olarak bug\u00fcne kadar Manisa\u2019da 10 bin, Afyon\u2019da da 25 bin konutun ve binlerce d\u00f6n\u00fcm seran\u0131n \u0131s\u0131 ihtiyac\u0131n\u0131 jeotermal kaynaklardan kar\u015f\u0131lad\u0131k. Tar\u0131m ve Orman Bakanl\u0131\u011f\u0131&#8217;m\u0131z ile Manisa, Denizli ve Ayd\u0131n\u2019da devam eden yakla\u015f\u0131k 3000 d\u00f6n\u00fcme yak\u0131n seran\u0131n \u0131s\u0131t\u0131lmas\u0131 ile ilgili \u00e7al\u0131\u015fmalar\u0131m\u0131z t\u00fcm halk\u0131m\u0131z taraf\u0131ndan bilinmektedir. Bu \u00e7al\u0131\u015fmalar sonland\u0131\u011f\u0131nda 5 bin vatanda\u015f\u0131m\u0131z i\u015f ve ekmek sahibi olacakt\u0131r. Ayd\u0131nl\u0131 hem\u015ferilerimizin de \u0131s\u0131tma giderlerini unutmas\u0131n\u0131 istiyoruz. Yerel y\u00f6netimlerimizden talep almak \u00fczere teknik haz\u0131rl\u0131klar\u0131m\u0131z\u0131 tamamlad\u0131k.&#8221; dedi.<\/strong><\/h1>\n<p><strong>Yenilenebilir enerji konusunda<\/strong> hayata ge\u00e7irdikleri <strong>yat\u0131r\u0131mlar, projeler ve y\u00fcr\u00fct\u00fclen \u00e7al\u0131\u015fmalarla<\/strong> T\u00fcrkiye&#8217;yi jeotermalde <strong>ABD, Endonezya, Filipinler<\/strong>&#8216;in ard\u0131ndan <strong>4&#8217;\u00fcnc\u00fc s\u0131raya<\/strong> ta\u015f\u0131yan jeotermal enerji sekt\u00f6r\u00fc, farkl\u0131 alanlarda <strong>desteklerini hayata ge\u00e7irmeye<\/strong> devam ediyor. <img loading=\"lazy\" class=\"alignright wp-image-114324\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ufuk-senturk-aydinlilari-jeotermal-kaynaklarimiz-ile-isitmaya-haziriz-1.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ufuk-senturk-aydinlilari-jeotermal-kaynaklarimiz-ile-isitmaya-haziriz-1.jpg 732w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ufuk-senturk-aydinlilari-jeotermal-kaynaklarimiz-ile-isitmaya-haziriz-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ufuk-senturk-aydinlilari-jeotermal-kaynaklarimiz-ile-isitmaya-haziriz-1-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ufuk-senturk-aydinlilari-jeotermal-kaynaklarimiz-ile-isitmaya-haziriz-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ufuk-senturk-aydinlilari-jeotermal-kaynaklarimiz-ile-isitmaya-haziriz-1-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>Ayd\u0131n\u2019da<\/strong> uzun y\u0131llard\u0131r devam ettirilen yat\u0131r\u0131mlarla, Ayd\u0131n\u2019\u0131n <strong>T\u00fcrkiye&#8217;nin yenilenebilir enerji \u00fcsleri<\/strong>nden biri olmas\u0131 i\u00e7in \u00e7al\u0131\u015fmaya devam eden <strong>JESDER \u00fcyeleri<\/strong>, \u015fimdi de<strong> sosyal sorumluluk \u00e7al\u0131\u015fmalar\u0131<\/strong> kapsam\u0131nda <strong>hanelerin ve seralar\u0131n \u0131s\u0131nma ve s\u0131cak su ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131lama<\/strong>ya haz\u0131r.<\/p>\n<p><strong>JESDER Ba\u015fkan\u0131 Ufuk \u015eent\u00fcrk<\/strong>; &#8220;Hanelerin y\u0131l i\u00e7erisindeki gider kalemlerinin ba\u015f\u0131nda<strong> \u0131s\u0131tma bedeli<\/strong> yer al\u0131yor. JESDER olarak <strong>Ayd\u0131n<\/strong>&#8216;da <strong>29 santral<\/strong> ile hizmet veriyoruz. Uzun y\u0131llard\u0131r Ayd\u0131n&#8217;da hem\u015firelerimiz ile bir\u00e7ok ba\u015far\u0131 elde ettik. Kazanc\u0131m\u0131z\u0131 yine burada yat\u0131r\u0131ma d\u00f6n\u00fc\u015ft\u00fcrd\u00fck. \u0130stihdam\u0131m\u0131z\u0131 art\u0131rd\u0131k. \u00c7e\u015fitli <strong>sosyal sorumluluk projeleri<\/strong> hayata ge\u00e7irdik. Ayd\u0131n\u2019\u0131n \u0131s\u0131nmas\u0131nda yeni bir d\u00f6nem ba\u015flatmak niyetindeyiz. Bug\u00fcne kadar <strong>35 bin konutu<\/strong>n ve <strong>y\u00fczlerce d\u00f6n\u00fcm sera<\/strong>n\u0131n \u0131s\u0131 ihtiyac\u0131n\u0131 jeotermal kaynaklardan kar\u015f\u0131layan JESDER \u00fcyeleri, Ayd\u0131n\u2019\u0131n tamam\u0131nda <strong>Yerel Y\u00f6netimler<\/strong>imiz ile birlikte bunu sa\u011flamaya haz\u0131r.\u201d dedi.<\/p>\n<h2><strong>\u201c6 M\u0130LYON KONUT VE SERAYI ISITILAB\u0130L\u0130R\u0130Z\u201d<\/strong><\/h2>\n<p>Ayd\u0131n\u2019\u0131n <strong>JESDER \u00fcyeleri<\/strong>nin yat\u0131r\u0131m\u0131 i\u00e7in \u00f6nemli bir yerde oldu\u011funu hat\u0131rlatan <strong>\u015eent\u00fcrk<\/strong>, \u201cAyd\u0131n\u2019da toplam <strong>29 santral<\/strong> ve <strong>790 Mw<\/strong> kurulu g\u00fc\u00e7 ile hizmet veriyor, b\u00f6lgenin elektrik enerji ihtiyac\u0131na hat\u0131r\u0131 say\u0131l\u0131r miktarda enerji arz\u0131 sa\u011fl\u0131yoruz. Kurulu g\u00fc\u00e7 kapasitemiz <strong>70 MWe<\/strong> olan <strong>Salihli<\/strong>\u2019de y\u0131ll\u0131k <strong>560 GWh elektrik \u00fcretimi<\/strong>yle ve il\u00e7emizin konut \u0131s\u0131tma sisteminin ihtiyac\u0131 olan jeotermal \u0131s\u0131tma projemizle <strong>evlere, i\u015f yerlerine<\/strong> ula\u015f\u0131yor. <strong>JESDER<\/strong> olarak bug\u00fcne kadar <strong>Manisa<\/strong>\u2019da <strong>10 bin<\/strong>, <strong>Afyon<\/strong>\u2019da da <strong>25 bin<\/strong> konutun ve binlerce d\u00f6n\u00fcm seran\u0131n \u0131s\u0131 ihtiyac\u0131n\u0131 jeotermal kaynaklardan kar\u015f\u0131lad\u0131k. Tar\u0131m ve Orman Bakanl\u0131\u011f\u0131m\u0131z ile <strong>Manisa, Denizli ve Ayd\u0131n\u2019da<\/strong> devam eden yakla\u015f\u0131k <strong>3 bin d\u00f6n\u00fcme<\/strong> yak\u0131n <strong>seran\u0131n \u0131s\u0131t\u0131lmas\u0131<\/strong> ile ilgili \u00e7al\u0131\u015fmalar\u0131m\u0131z t\u00fcm halk\u0131m\u0131z taraf\u0131ndan bilinmektedir. Bu \u00e7al\u0131\u015fmalar sonland\u0131\u011f\u0131nda <strong>5 bin vatanda\u015f\u0131m\u0131z<\/strong> i\u015f ve ekmek sahibi olacakt\u0131r. Ayd\u0131nl\u0131 hem\u015ferilerimizin de <strong>\u0131s\u0131tma giderleri<\/strong>ni unutmas\u0131n\u0131 istiyoruz. Yerel y\u00f6netimlerimizden<strong> talep almak \u00fczere<\/strong> teknik haz\u0131rl\u0131klar\u0131m\u0131z\u0131 tamamlad\u0131k.&#8221; dedi.<\/p>\n<p><strong>Jeotermal enerjinin potansiyeli<\/strong>ne de de\u011finen \u015eent\u00fcrk \u015funlar\u0131 ekledi: \u201cSadece <strong>Bat\u0131 Anadolu<\/strong>\u2019daki kaynaklar\u0131m\u0131zdan <strong>30 bin MW<\/strong>\u2019l\u0131k termal potansiyel ile <strong>6 milyon e\u015f de\u011fer konutun<\/strong> veya <strong>seran\u0131n \u0131s\u0131tmas\u0131n\u0131<\/strong> sa\u011flayabiliriz. T\u00fcrkiye bug\u00fcn <em>konut \u0131s\u0131tmada<\/em> <strong>jeotermal kaynaklar\u0131n\u0131 kullanarak<\/strong>, konut \u0131s\u0131tmada <strong>% 80<\/strong> mertebelerine ula\u015fabilecek potansiyele sahiptir.\u201d<\/p>\n<h2><strong>\u201cTEK Y\u00dcREK HAREKET ETMEK \u0130ST\u0130YORUZ\u201d<\/strong><\/h2>\n<p><strong>Ayd\u0131nl\u0131 yerel y\u00f6netimlere<\/strong> \u00e7a\u011fr\u0131da bulunan <strong>Ufuk \u015eent\u00fcrk<\/strong> \u015f\u00f6yle konu\u015ftu; \u201cBu projenin hayata ge\u00e7irilmesi kapsam\u0131nda yerel y\u00f6netimler en \u00f6nemli payda\u015f\u0131m\u0131z. <strong>JESDER \u00fcyeleri<\/strong> olarak <strong>yerel y\u00f6netim<\/strong>lerle <strong>tek y\u00fcrek halinde<\/strong> hareket ederek, halk\u0131m\u0131za bu fayday\u0131 sunmak istiyoruz. En k\u0131sa s\u00fcrede<strong> hem\u015ferilerimizin \u0131s\u0131tma giderlerini unutmas\u0131n\u0131<\/strong> istiyoruz. Is\u0131tma giderlerini <strong>g\u0131daya, \u00e7ocuklar\u0131n\u0131n e\u011fitimine, farkl\u0131 alanlara ay\u0131rmas\u0131n\u0131<\/strong> istiyoruz. Ayd\u0131ndaki <strong>t\u00fcm yerel y\u00f6netimleri<\/strong>mizi<strong> bu \u00f6nemli proje i\u00e7in i\u015f birli\u011fine<\/strong> davet ediyoruz.&#8221;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Jeotermal Elektrik Santral Yat\u0131r\u0131mc\u0131lar\u0131 Derne\u011fi (JESDER), Ayd\u0131n&#8217;daki yat\u0131r\u0131mlar\u0131n\u0131 ve desteklerini aral\u0131ks\u0131z devam ettiriyor. Ayd\u0131n&#8217;da toplam 29 santral ve 790 Mw kurulu g\u00fc\u00e7 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":114325,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,48],"tags":[1198,6028,7179,72708,5070,16200,52259,24394,72702,72706,72705,56997,72709,53925,11878,72701,36184,30234,72704,72700,2191,72707,3114,72703,15411,45699,54979,22050],"views":109,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/114322"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=114322"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/114322\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/114325"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=114322"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=114322"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=114322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}