{"id":113820,"date":"2020-05-18T23:14:51","date_gmt":"2020-05-18T20:14:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=113820"},"modified":"2020-05-18T23:16:02","modified_gmt":"2020-05-18T20:16:02","slug":"ge-yenilenebilir-enerji-ve-fina-enerji-turkiyede-193-mwlik-res-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ge-yenilenebilir-enerji-ve-fina-enerji-turkiyede-193-mwlik-res-kuracak\/","title":{"rendered":"(Turkish) GE Yenilenebilir Enerji ve Fina Enerji T\u00fcrkiye\u2019de 193 MW&#8217;l\u0131k RES Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/113820\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>GE Yenilenebilir Enerji, Fina Enerji\u2019nin T\u00fcrkiye\u2019de bulunan 4 r\u00fczgar santrali i\u00e7in (Ba\u011flama, Tayakad\u0131n, Yalova ve Pazark\u00f6y) 52 adet 3 MW platformu karasal r\u00fczgar t\u00fcrbininin tedarik\u00e7isi oldu\u011funu duyurdu. Toplam 193 MW kapasiteye sahip r\u00fczg\u00e2r santralleri, 195.000 evin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamaya ve yakla\u015f\u0131k 650.000 ton CO2 tasarrufu yapmaya yetecek kadar temiz enerji sa\u011flayacak. T\u00fcrkiye\u2019nin yenilenebilir enerji hedefine ula\u015fmas\u0131na da katk\u0131 sunacak proje kapsam\u0131nda, 10 y\u0131ll\u0131k servis anla\u015fmas\u0131 da yer al\u0131yor.<\/h1>\n<p><strong>GE<\/strong>\u2019nin <strong>T\u00fcrkiye<\/strong>\u2019de bulunan <strong>kurulu r\u00fczgar enerjisi<\/strong> g\u00fcc\u00fc <strong>1.2 GW<\/strong>\u2019a ve <strong>T\u00fcrkiye\u2019de \u00fcretti\u011fi r\u00fczgar t\u00fcrbini<\/strong> say\u0131s\u0131 <strong>500<\/strong>\u2019e ula\u015ft\u0131. Bu rakam, <strong>GE Yenilenebilir Enerji<\/strong> ve <strong>Fina Enerji<\/strong>\u2019nin bug\u00fcne kadar birlikte ger\u00e7ekle\u015ftirdi\u011fi <strong>350 MW r\u00fczgar santrali<\/strong>ni de i\u00e7eriyor. Buna ilave gelecek olan <strong>4 yeni proje<\/strong> <img loading=\"lazy\" class=\"alignright wp-image-113822\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ge-yenilenebilir-enerji-ve-fina-enerji-turkiyede-193-mwlik-res-kuracak.jpg\" alt=\"\" width=\"320\" height=\"188\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ge-yenilenebilir-enerji-ve-fina-enerji-turkiyede-193-mwlik-res-kuracak.jpg 743w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ge-yenilenebilir-enerji-ve-fina-enerji-turkiyede-193-mwlik-res-kuracak-300x176.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ge-yenilenebilir-enerji-ve-fina-enerji-turkiyede-193-mwlik-res-kuracak-500x294.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ge-yenilenebilir-enerji-ve-fina-enerji-turkiyede-193-mwlik-res-kuracak-80x47.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>GE<\/strong>\u2019nin T\u00fcrkiye\u2019deki mevcudiyetini daha da sa\u011flam hale getirecek.<\/p>\n<p><strong>Fina Enerji<\/strong>\u2019nin b\u00fcnyesinde yer ald\u0131\u011f\u0131 <strong>Fiba Grubu<\/strong>\u2019nun Y\u00f6netim Kurulu Ba\u015fkan\u0131 <strong>Murat \u00d6zye\u011fin<\/strong>, \u015funlar\u0131 s\u00f6yledi: \u201cKurulu kapasitemizi <strong>350 MW<\/strong>\u2019dan <strong>543 MW<\/strong>\u2019a y\u00fckseltecek olan yeni<strong> r\u00fczg\u00e2r santrali projeleri<\/strong>mizi ger\u00e7ekle\u015ftirece\u011fimiz i\u00e7in heyecanl\u0131y\u0131z. <strong>Ba\u011flama Projesi<\/strong>, bug\u00fcne kadar yap\u0131lan <strong>r\u00fczg\u00e2r santrali yat\u0131r\u0131mlar\u0131<\/strong> aras\u0131nda T\u00fcrkiye\u2019nin en do\u011fusunda yer alan proje olma \u00f6zelli\u011fine sahip olacak. Bu b\u00f6lgedeki ekonomik kalk\u0131nmaya katk\u0131 sunmaktan ayr\u0131ca gururluyuz. GE ile olan ortakl\u0131\u011f\u0131m\u0131z\u0131 devam ettirmenin ve \u00fclkemizin <strong>yenilenebilir enerji hedefleri<\/strong>ne ula\u015fmas\u0131na katk\u0131 sunman\u0131n mutlulu\u011funu ya\u015f\u0131yoruz.\u201d<\/p>\n<p><strong>GE Yenilenebilir Enerji<\/strong>,<strong> r\u00fczg\u00e2r t\u00fcrbin kanatlar\u0131<\/strong>n\u0131n \u00fcretimini, ba\u011fl\u0131 kurulu\u015fu <strong>LM Wind Power<\/strong>\u2019\u0131n <strong>\u0130zmir, Bergama\u2019daki tesisleri<\/strong>nde, yerli olarak ger\u00e7ekle\u015ftirecek. GE, bu tesislerde 550\u2019nin \u00fczerinde personel istihdam ediyor. <strong>R\u00fczg\u00e2r t\u00fcrbinleri<\/strong>nin kuleleri de yine T\u00fcrkiye\u2019de \u00fcretilecek.<\/p>\n<p><strong>GE Yenilenebilir Enerji Karasal R\u00fczg\u00e2r T\u00fcrbini Grubu<\/strong> <em>Orta Do\u011fu, Kuzey Afrika ve T\u00fcrkiye Ba\u015fkan\u0131 ve CEO<\/em>\u2019su <strong>Manar Al-Moneef<\/strong>, \u015funlar\u0131 belirtti: \u201cT\u00fcrkiye\u2019ye yat\u0131r\u0131m yapan ilk uluslararas\u0131 \u015firketlerden biri olarak GE, \u00fclkede <strong>istihdam yaratmaya<\/strong> ve enerji sekt\u00f6r\u00fcnde y\u00fcksek teknolojinin geli\u015ftirilmesine katk\u0131da bulunmaya kararl\u0131l\u0131kla devam ediyor. <strong>Fina Enerji<\/strong> ile yeniden i\u015f ortakl\u0131\u011f\u0131 yapmaktan ve GE\u2019nin T\u00fcrkiye\u2019nin <strong>r\u00fczg\u00e2r h\u0131z\u0131na<\/strong> ve co\u011frafyas\u0131na uygun \u00f6zelliklere sahip y\u00fcksek teknolojili <strong>3MW<\/strong> r\u00fczgar t\u00fcrbini platformlar\u0131n\u0131n kullan\u0131laca\u011f\u0131 bu <strong>heyecan verici projelerde<\/strong> birlikte \u00e7al\u0131\u015facak olmaktan dolay\u0131 memnuniyet duyuyoruz.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. GE Yenilenebilir Enerji, Fina Enerji\u2019nin T\u00fcrkiye\u2019de bulunan 4 r\u00fczgar santrali i\u00e7in (Ba\u011flama, Tayakad\u0131n, Yalova ve Pazark\u00f6y) 52 adet 3 MW platformu karasal [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":113822,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[72212,72216,68388,5070,52259,12054,19897,72218,31843,68392,22961,72214,35002,53282,35035,72217,72215,68389,72213,54979,27654],"views":101,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113820"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=113820"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113820\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/113822"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=113820"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=113820"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=113820"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}