{"id":113631,"date":"2020-05-14T21:05:05","date_gmt":"2020-05-14T18:05:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=113631"},"modified":"2020-05-14T21:05:05","modified_gmt":"2020-05-14T18:05:05","slug":"tkdkdan-ipard-ii-programi-kapsaminda-gunes-yatirimlarina-hibe-destegi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tkdkdan-ipard-ii-programi-kapsaminda-gunes-yatirimlarina-hibe-destegi\/","title":{"rendered":"(Turkish) TKDK\u2019dan IPARD II Program\u0131 Kapsam\u0131nda G\u00fcne\u015f Yat\u0131r\u0131mlar\u0131na Hibe Deste\u011fi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/113631\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Tar\u0131m ve K\u0131rsal Kalk\u0131nmay\u0131 Destekleme Kurumu (TKDK), IPARD II Program\u0131 9&#8217;uncu Ba\u015fvuru \u00c7a\u011fr\u0131 \u0130lan\u0131na \u00e7\u0131kt\u0131. Bu \u00e7a\u011fr\u0131 ilan\u0131 kapsam\u0131nda \u201cTar\u0131msal \u0130\u015fletmelerin Fiziki Varl\u0131klar\u0131na Y\u00f6nelik Yat\u0131r\u0131mlar\u201d ve \u201c\u00c7iftlik Faaliyetlerinin \u00c7e\u015fitlendirilmesi ve \u0130\u015f Geli\u015ftirme\u201d sekt\u00f6rlerinde yap\u0131lacak ba\u015fvurular kabul edilecek. 42 ilde faaliyet g\u00f6steren TKDK, bu d\u00f6nemde yap\u0131lacak yat\u0131r\u0131mlara 1.2 Milyar TL hibe deste\u011fi verecek.<\/strong><\/h1>\n<p><strong>Tar\u0131m ve K\u0131rsal Kalk\u0131nmay\u0131 Destekleme Kurumu (TKDK)<\/strong>, IPARD II Program\u0131 <strong>9&#8217;uncu Ba\u015fvuru \u00c7a\u011fr\u0131 \u0130lan\u0131<\/strong>na \u00e7\u0131kt\u0131. Ba\u015fta <strong>\u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f enerjisi santrali kurulumu<\/strong> dahil olmak \u00fczere yenilenebilir enerji yat\u0131r\u0131mlar\u0131na ger\u00e7ek ve t\u00fczel ki\u015fi ba\u015fvurular\u0131nda <strong>% 55<\/strong> hibe deste\u011fi verilecek. \u00dcretici \u00f6rg\u00fctlerine <img loading=\"lazy\" class=\"alignright wp-image-113633\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/tkdkdan-ipard-ii-programi-kapsaminda-gunes-yatirimlarina-hibe-destegi.jpg\" alt=\"\" width=\"320\" height=\"215\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/tkdkdan-ipard-ii-programi-kapsaminda-gunes-yatirimlarina-hibe-destegi.jpg 728w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/tkdkdan-ipard-ii-programi-kapsaminda-gunes-yatirimlarina-hibe-destegi-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/tkdkdan-ipard-ii-programi-kapsaminda-gunes-yatirimlarina-hibe-destegi-500x335.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/tkdkdan-ipard-ii-programi-kapsaminda-gunes-yatirimlarina-hibe-destegi-75x50.jpg 75w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ya da \u00fcretici \u00f6rg\u00fctlerinin hakim ortak oldu\u011fu t\u00fczel ki\u015fi <strong>GES ba\u015fvurular\u0131<\/strong>nda ise <strong>% 65<\/strong> hibe deste\u011fi verilecek.<\/p>\n<p>\u00c7iftlik faaliyetlerinin \u00e7e\u015fitlendirilmesi ve i\u015f geli\u015ftirme faaliyetleri ile ilgili enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamak i\u00e7in <strong>biyo-k\u00fctle, r\u00fczgar, g\u00fcne\u015f ve jeotermal<\/strong> kullanarak enerji \u00fcretmek amac\u0131 ile <strong>makine\/ekipman al\u0131m\u0131<\/strong> ve in\u015faat i\u015flerinin ger\u00e7ekle\u015ftirilmesi, t\u00fcm sekt\u00f6rler i\u00e7in ortak olan uygun harcamalar aras\u0131nda yer al\u0131yor.<\/p>\n<p><strong>Yenilenebilir Enerji Tesisleri i\u00e7in uygun <span style=\"text-decoration: underline;\">ko\u015fullar \u015fu \u015fekildedir:<\/span><\/strong><\/p>\n<p>&#8211; Bu faaliyet kapsam\u0131ndaki yat\u0131r\u0131mlar\u0131n ba\u015fvuru sahibinin stat\u00fcs\u00fcne bak\u0131lmaks\u0131z\u0131n k\u0131rsal alanda olmas\u0131 gerekmektedir.<br \/>\n&#8211; Elektrik ve \u0131s\u0131 \u00fcretimi amac\u0131 ile her t\u00fcrl\u00fc yenilenebilir enerji faaliyetleri (hidroelektrik hari\u00e7), a\u015fa\u011f\u0131da belirtilenler dahil olmak \u00fczere uygundur;<br \/>\n\u2013- Fotovoltaik g\u00fcne\u015f enerjisi sistemleri,<br \/>\n\u2013- Konsantre g\u00fcne\u015f enerjisi sistemleri,<br \/>\n\u2013-R\u00fczgar enerji sistemleri,<br \/>\n\u2013- Jeotermal, biyok\u00fctle, mikrokojenerasyon (elektrik ve\/veya \u0131s\u0131 \u00fcretimi i\u00e7in)<\/p>\n<p>&#8211; 5 MW kapasiteye kadar olan yenilenebilir enerji yat\u0131r\u0131mlar\u0131 (mikro-kojenerasyon yat\u0131r\u0131mlar\u0131 i\u00e7in 100 kWe\u2019ye kadar) desteklenecektir.<br \/>\n&#8211; E\u011fer yat\u0131r\u0131m yenilenebilir enerji kaynaklar\u0131ndan elektrik \u00fcretilmesini hedefliyor ise, ulusal \u015febekeye ba\u011flan\u0131lmas\u0131 zorunludur ve a\u015fa\u011f\u0131da belirtilen ko\u015fullar kar\u015f\u0131lanmal\u0131d\u0131r:<\/p>\n<p>\u2013- Ba\u015fvuru sahibi, ba\u015fvuru paketi ile birlikte, \u015febekeye ba\u011flant\u0131n\u0131n mevcut oldu\u011funu tasdik eden ve yetkili kurum taraf\u0131ndan verilen (elektrik da\u011f\u0131t\u0131m \u015firketleri, organize sanayi b\u00f6lgeleri, T\u00fcrkiye Elektrik Da\u011f\u0131t\u0131m \u015eirketi vb.) bir dok\u00fcman\/sertifika sunacakt\u0131r.<br \/>\n\u2013- Ba\u015fvuru sahibi nihai \u00f6deme talebi paketi ile birlikte ilgili makamlar taraf\u0131ndan verilen ge\u00e7ici kabul tutana\u011f\u0131n\u0131 sunacakt\u0131r.<\/p>\n<p><strong>IPARD II Program\u0131 9&#8217;uncu\u00a0<a href=\"http:\/\/tkdk.gov.tr\/Content\/File\/BasvuruFiles\/BasvuruPaketiHazirlamaDokumanlari\/BasvuruCagriRehberi\/IPARDII\/9.0\/302.pdf\" target=\"_blank\" rel=\"nofollow noopener\">Ba\u015fvuru \u0130lan\u0131 \u0130\u00e7in TIKLAYIN&gt;&gt;&gt;<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Tar\u0131m ve K\u0131rsal Kalk\u0131nmay\u0131 Destekleme Kurumu (TKDK), IPARD II Program\u0131 9&#8217;uncu Ba\u015fvuru \u00c7a\u011fr\u0131 \u0130lan\u0131na \u00e7\u0131kt\u0131. Bu \u00e7a\u011fr\u0131 ilan\u0131 kapsam\u0131nda \u201cTar\u0131msal \u0130\u015fletmelerin Fiziki [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":113633,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53,49,48],"tags":[71997,45409,52259,53157,71998,10215,21542,56847,21543,71999,12770],"views":109,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113631"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=113631"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113631\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/113633"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=113631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=113631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=113631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}