{"id":113622,"date":"2020-05-14T20:11:32","date_gmt":"2020-05-14T17:11:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=113622"},"modified":"2020-05-14T20:14:17","modified_gmt":"2020-05-14T17:14:17","slug":"orkoy-projesinde-afyonkarahisar-gunes-enerjisi-pilot-projesi-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/orkoy-projesinde-afyonkarahisar-gunes-enerjisi-pilot-projesi-tamamlandi\/","title":{"rendered":"(Turkish) ORK\u00d6Y Projesi&#8217;nde Afyonkarahisar G\u00fcne\u015f Enerjisi Projesi Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/113622\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>ORK\u00d6Y Projesi kapsam\u0131nda Afyonkarahisar\u2019\u0131n \u015euhut il\u00e7esine ba\u011fl\u0131 Kulak K\u00f6y\u00fc\u2019nde hayata ge\u00e7irilen 100 kW\u2019l\u0131k g\u00fcne\u015f enerjisi pilot projesi tamamland\u0131.<\/strong><\/h1>\n<p><strong>Birle\u015fmi\u015f Milletler Kalk\u0131nma Program\u0131<\/strong> <strong>UNDP<\/strong>\u2019nin y\u00fcr\u00fctt\u00fc\u011f\u00fc ve\u00a0<strong>Uluslararas\u0131 G\u00fcne\u015f Enerjisi Toplulu\u011fu T\u00fcrkiye B\u00f6l\u00fcm\u00fc G\u00dcNDER<\/strong>\u2019in proje orta\u011f\u0131 oldu\u011fu \u201c<strong>Orman K\u00f6ylerinde G\u00fcne\u015f Enerjisinden Elektrik \u00dcretimi \u0130\u00e7in S\u00fcrd\u00fcr\u00fclebilir Enerji Finans Mekanizmas\u0131 Projesi<\/strong>\u201d kapsam\u0131nda <strong>4 pilot tesis<\/strong> kuruldu.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignleft wp-image-113624\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/orkoy-projesinde-afyonkarahisar-gunes-enerjisi-pilot-projesi-tamamlandi.jpg\" alt=\"\" width=\"320\" height=\"173\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/orkoy-projesinde-afyonkarahisar-gunes-enerjisi-pilot-projesi-tamamlandi.jpg 901w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/orkoy-projesinde-afyonkarahisar-gunes-enerjisi-pilot-projesi-tamamlandi-300x162.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/orkoy-projesinde-afyonkarahisar-gunes-enerjisi-pilot-projesi-tamamlandi-768x416.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/orkoy-projesinde-afyonkarahisar-gunes-enerjisi-pilot-projesi-tamamlandi-500x271.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/orkoy-projesinde-afyonkarahisar-gunes-enerjisi-pilot-projesi-tamamlandi-80x43.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Orman Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc<\/strong>&#8216;n\u00fcn resmi sosyal medya hesab\u0131 \u00fczerinden yap\u0131lan a\u00e7\u0131klamada,<strong> Orman K\u00f6ylerinde G\u00fcne\u015f Enerjisinden Elektrik \u00dcretim Projesi<\/strong>\u2019nde pilot uygulamalardan biri olan <strong>Afyonkarahisar<\/strong>\u2019\u0131n <strong>\u015euhut il\u00e7esi<\/strong>ne ba\u011fl\u0131 <strong>Kulak K\u00f6y\u00fc<\/strong>\u2019nde hayata ge\u00e7irilen<strong> g\u00fcne\u015f enerjisi pilot projesi<\/strong>nin ba\u015far\u0131yla hayata ge\u00e7ti\u011fini belirtti.\u201cOrman k\u00f6ylerimiz enerjisini g\u00fcne\u015ften, g\u00fcc\u00fcn\u00fc ormandan al\u0131yor\u201d ba\u015fl\u0131kl\u0131 payla\u015f\u0131mda <strong>Kulak K\u00f6y\u00fc<\/strong>\u2019nde hayata ge\u00e7irilen <strong>g\u00fcne\u015f enerjisi pilot projesi<\/strong>ne ili\u015fkin tan\u0131t\u0131m videosu payla\u015f\u0131ld\u0131.<\/p>\n<p>Proje ile k\u00f6ylerin kalk\u0131n\u0131rken <strong>\u00fclke ekonomisine de destek<\/strong> olundu\u011fu belirtildi. <strong>100 kW \u00fcretim<\/strong> kapasiteli <strong>1500 m2 alana<\/strong> kurulu Santral k\u00f6yl\u00fclerin <strong>elektrik ihtiyac\u0131n\u0131n tamam\u0131n\u0131<\/strong> kar\u015f\u0131layacak, fazla \u00fcretilen enerji ise sisteme sat\u0131larak k\u00f6y i\u00e7in gelir getirecek. Her biri <strong>100 kWp kapasiteli<\/strong> pilot tesisler<strong> Afyon, Konya, \u00c7orum <\/strong>ve<strong> Elaz\u0131\u011f<\/strong>\u2019da kuruldu.<\/p>\n<p><strong>Tan\u0131t\u0131m <a href=\"https:\/\/www.linkedin.com\/posts\/g%C3%BCnder_enerji-medya-ekonomi-activity-6666611496648372225-9dSu\" target=\"_blank\" rel=\"nofollow noopener\">Videosu \u0130\u00e7in TIKLAYIN &gt;&gt;&gt;<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ORK\u00d6Y Projesi kapsam\u0131nda Afyonkarahisar\u2019\u0131n \u015euhut il\u00e7esine ba\u011fl\u0131 Kulak K\u00f6y\u00fc\u2019nde hayata ge\u00e7irilen 100 kW\u2019l\u0131k g\u00fcne\u015f enerjisi pilot projesi tamamland\u0131. Birle\u015fmi\u015f Milletler Kalk\u0131nma Program\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":113624,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[1110,2219,53114,52259,71993,71994,71996,71992,71995,54979,2218],"views":246,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113622"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=113622"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113622\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/113624"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=113622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=113622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=113622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}