{"id":113416,"date":"2020-05-11T20:21:43","date_gmt":"2020-05-11T17:21:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=113416"},"modified":"2020-05-11T20:21:43","modified_gmt":"2020-05-11T17:21:43","slug":"ahikoy-1-ve-ahikoy-2-hes-ihalelerine-yonelik-son-teklif-tarihinde-degisiklik","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ahikoy-1-ve-ahikoy-2-hes-ihalelerine-yonelik-son-teklif-tarihinde-degisiklik\/","title":{"rendered":"(Turkish) Ahik\u00f6y 1 Ve Ahik\u00f6y 2 HES \u0130haleleri&#8217;ne Y\u00f6nelik Son Teklif Tarihi De\u011fi\u015fti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/113416\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Hazine ve Maliye Bakanl\u0131\u011f\u0131 \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 (\u00d6\u0130B) taraf\u0131ndan Ahik\u00f6y I ve Ahik\u00f6y II Hidroelektrik Santrallerinde (HES) son teklif verme tarihi 20 Temmuz 2020&#8217;ye uzat\u0131ld\u0131.<\/h1>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-113420\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ahikoy-i-ve-ahikoy-ii-hes-ihalelerinde-son-teklif-verme-tarihi-uzatildi.jpg\" alt=\"\" width=\"320\" height=\"201\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ahikoy-i-ve-ahikoy-ii-hes-ihalelerinde-son-teklif-verme-tarihi-uzatildi.jpg 695w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ahikoy-i-ve-ahikoy-ii-hes-ihalelerinde-son-teklif-verme-tarihi-uzatildi-300x189.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ahikoy-i-ve-ahikoy-ii-hes-ihalelerinde-son-teklif-verme-tarihi-uzatildi-500x314.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ahikoy-i-ve-ahikoy-ii-hes-ihalelerinde-son-teklif-verme-tarihi-uzatildi-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Hazine ve Maliye Bakanl\u0131\u011f\u0131 \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 (\u00d6\u0130B)<\/strong>, <em>Ahik\u00f6y I ve Ahik\u00f6y II Hidroelektrik Santralleri<\/em> ile bu Santraller taraf\u0131ndan kullan\u0131lan <strong>ta\u015f\u0131nmazlar\u0131n \u00f6zelle\u015ftirilmesi<\/strong> amac\u0131yla a\u00e7\u0131lan <strong>ihaleyi<\/strong> erteledi.<\/p>\n<p><strong>Hazine ve Maliye Bakanl\u0131\u011f\u0131<\/strong> <strong>\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131&#8217;<\/strong>n\u0131n, <strong>ihale s\u00fcre uzat\u0131m<\/strong> ilan\u0131 <strong>Resmi Gazete&#8217;de<\/strong> yay\u0131mland\u0131. Buna g\u00f6re, Bakanl\u0131k taraf\u0131ndan <strong>Ahik\u00f6y-1 ve 2 HES&#8217;leri&#8217;<\/strong>nin <strong>i\u015fletme\u00a0 hakk\u0131n\u0131n verilmesi y\u00f6ntemiyle \u00f6zelle\u015ftirilmesi<\/strong> amac\u0131yla yap\u0131lacak ihalenin,<strong> son teklif verme<\/strong> s\u00fcresi <strong>20 Temmuz 2020<\/strong> saat <strong>17.00&#8242;<\/strong>ye kadar\u00a0 uzat\u0131ld\u0131. \u0130halede daha \u00f6nce son teklif verme tarihi <strong>1 Haziran 2020<\/strong> olarak a\u00e7\u0131klanm\u0131\u015ft\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Hazine ve Maliye Bakanl\u0131\u011f\u0131 \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 (\u00d6\u0130B) taraf\u0131ndan Ahik\u00f6y I ve Ahik\u00f6y II Hidroelektrik Santrallerinde (HES) son teklif verme tarihi 20 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":113420,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[71758,71759,71762,53114,52259,71757,26043,26044,71760,71761,11309,54979],"views":284,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113416"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=113416"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113416\/revisions"}],"predecessor-version":[{"id":113417,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113416\/revisions\/113417"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/113420"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=113416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=113416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=113416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}