{"id":113405,"date":"2020-05-11T18:21:12","date_gmt":"2020-05-11T15:21:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=113405"},"modified":"2020-05-11T18:30:28","modified_gmt":"2020-05-11T15:30:28","slug":"ilisu-baraji-ve-hesi-enerji-uretiminde-test-surecine-gecti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ilisu-baraji-ve-hesi-enerji-uretiminde-test-surecine-gecti\/","title":{"rendered":"(Turkish) Il\u0131su Baraj\u0131 ve HES&#8217;i Enerji \u00dcretiminde Test S\u00fcrecine Ge\u00e7ti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/113405\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>G\u00fcneydo\u011fu Anadolu Projesi (GAP) projesi kapsam\u0131nda in\u015fa edilen Il\u0131su Baraj\u0131 ve Hidroelektrik Santrali (HES) enerji \u00fcretiminde test s\u00fcrecine ge\u00e7ti.<\/h1>\n<h1><strong><img loading=\"lazy\" class=\"alignright wp-image-113407\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ilisu-baraji-ve-hesi-enerji-uretiminde-test-surecine-gecti.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ilisu-baraji-ve-hesi-enerji-uretiminde-test-surecine-gecti.jpg 778w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ilisu-baraji-ve-hesi-enerji-uretiminde-test-surecine-gecti-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ilisu-baraji-ve-hesi-enerji-uretiminde-test-surecine-gecti-768x431.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ilisu-baraji-ve-hesi-enerji-uretiminde-test-surecine-gecti-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/ilisu-baraji-ve-hesi-enerji-uretiminde-test-surecine-gecti-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h1>\n<p><strong>Il\u0131su Baraj\u0131<\/strong> ve <strong>HES \u0130n\u015faat\u0131<\/strong>nda <strong>4.5 MW g\u00fcc\u00fc<\/strong>ndeki <strong>yard\u0131mc\u0131 \u00fcnite<\/strong> ana \u015febeke ile <strong>senkronize hale<\/strong> getirilirken ilk <strong>enerji \u00fcretimi<\/strong> ise ba\u015flad\u0131. <strong>Il\u0131su Baraj\u0131 ve HES<\/strong> in\u015faat\u0131n\u0131n <strong>i\u00e7 ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131layacak<\/strong> olan yard\u0131mc\u0131 \u00fcnitede <strong>28 g\u00fcnl\u00fck<\/strong> tam kapasite <strong>\u00e7al\u0131\u015fma test s\u00fcreci<\/strong>ne\u00a0<strong>7 May\u0131s 2020<\/strong> tarihi itibari ile ba\u015fland\u0131.<\/p>\n<p><strong>Toplam depolama hacmi<\/strong>nin <strong>10,625 milyar metrek\u00fcp <\/strong>oldu\u011fu\u00a0Il\u0131su baraj\u0131nda Baraj g\u00f6l\u00fc <strong>119,5 m<\/strong> y\u00fcksekli\u011fe ve <strong>9 milyar m3<\/strong>\u00a0hacme ula\u015ft\u0131. \u00a0Her biri <strong>200 MW<\/strong> kurulu g\u00fcc\u00fcndeki <strong>6 adet t\u00fcrbinin<\/strong> \u0131slak testleri s\u00fcrerken\u00a0<strong>May\u0131s ay\u0131<\/strong> i\u00e7erisinde en az <strong>1 t\u00fcrbini \u00fcretime<\/strong> ba\u015flayacak. \u00dclkemizin en \u00f6nemli<strong> enerji projelerinden biri<\/strong> olan <strong>Il\u0131su Baraj\u0131 ve HES Projesi<\/strong>, <b>yenilenebilir ve temiz enerjinin g\u00fcc\u00fcyle<\/b>\u00a0\u00fclke ekonomisine y\u0131lda <strong>2,5 milyar TL<\/strong> katk\u0131 sa\u011flayacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00fcneydo\u011fu Anadolu Projesi (GAP) projesi kapsam\u0131nda in\u015fa edilen Il\u0131su Baraj\u0131 ve Hidroelektrik Santrali (HES) enerji \u00fcretiminde test s\u00fcrecine ge\u00e7ti. Il\u0131su Baraj\u0131 ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":113407,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[52259,53376,71749,26043,28058,68968,26044,37783,71750,4278,54979],"views":181,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113405"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=113405"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113405\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/113407"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=113405"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=113405"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=113405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}