{"id":113253,"date":"2020-05-09T18:10:11","date_gmt":"2020-05-09T15:10:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=113253"},"modified":"2020-05-09T18:12:23","modified_gmt":"2020-05-09T15:12:23","slug":"daikin-fabrikasi-nin-enerjisinin-yuzde-60-ini-gunesten-karsilayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/daikin-fabrikasi-nin-enerjisinin-yuzde-60-ini-gunesten-karsilayacak\/","title":{"rendered":"(Turkish) &#8217;Daikin&#8217; Hendek Fabrikas\u0131n\u0131n Enerjisi&#8217;nin %60&#8217;\u0131n\u0131 G\u00fcne\u015ften Kar\u015f\u0131layacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/113253\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Daikin, kendi enerjisini g\u00fcne\u015f enerjisinden \u00fcretmeye haz\u0131rlan\u0131rken yat\u0131r\u0131m maliyeti 3 milyon dolar olan ges projesiyle 5.760 kWp enerji \u00fcretimi ger\u00e7ekle\u015ftirerek ihtiyac\u0131n\u0131n yakla\u015f\u0131k %60&#8217;\u0131n\u0131 kar\u015f\u0131layacak.<\/h1>\n<p><strong>GES projesi<\/strong> hakk\u0131nda g\u00f6r\u00fc\u015flerini dile getiren\u00a0<strong>Daikin T\u00fcrkiye<\/strong> CEO\u2019su <strong>Hasan \u00d6nder,<\/strong>\u00a0\u201c \u00dcretim faaliyetlerimiz i\u00e7in <strong>Hendek Fabrika<\/strong>m\u0131zda <img loading=\"lazy\" class=\"alignright wp-image-113256\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/daikin-fabrikasi-nin-enerjisinin-yuzde-60-ini-gunesten-karsilayacak.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/daikin-fabrikasi-nin-enerjisinin-yuzde-60-ini-gunesten-karsilayacak.jpg 778w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/daikin-fabrikasi-nin-enerjisinin-yuzde-60-ini-gunesten-karsilayacak-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/daikin-fabrikasi-nin-enerjisinin-yuzde-60-ini-gunesten-karsilayacak-768x431.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/daikin-fabrikasi-nin-enerjisinin-yuzde-60-ini-gunesten-karsilayacak-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/daikin-fabrikasi-nin-enerjisinin-yuzde-60-ini-gunesten-karsilayacak-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>y\u00fcksek miktarda enerjiye ihtiya\u00e7<\/strong> duyuyoruz. Bir <strong>GES projesi<\/strong> uygulayarak Daikin\u2019in \u00e7evre misyonunu hayata ge\u00e7irirken maliyetlerimizi de daha kontrol edilebilir hale getirmeyi ama\u00e7lad\u0131k. Sekt\u00f6r\u00fcn\u00fcn referans \u015firketi <strong>Kontek<\/strong> taraf\u0131ndan yap\u0131lan <strong>GES\u2019in yat\u0131r\u0131m maliyeti<\/strong> <em>3 milyon dolar<\/em> olarak belirlendi. <strong>Kontek firmas\u0131<\/strong> ile yola devam karar\u0131m\u0131z\u0131; kendi sekt\u00f6rlerinin en iyi firmalar\u0131ndan biri olarak gerekli <strong>teknik yetkinli\u011fe sahip olmalar\u0131<\/strong> ve i\u015flerine hakimiyetlerinin yan\u0131 s\u0131ra yapt\u0131\u011f\u0131m\u0131z proje ve firma ziyaretlerinde de kendilerini Daikin\u2019in <strong>\u00e7evre bilinci ve etik de\u011ferleri<\/strong>ne daha yak\u0131n buldu\u011fumuz i\u00e7in verdik. <strong>\u015eubat 2020<\/strong> tarihinde yap\u0131m\u0131 ba\u015flayan projemiz, <strong>Temmuz ay\u0131nda<\/strong> devreye al\u0131nd\u0131\u011f\u0131nda fabrikam\u0131z\u0131n ge\u00e7ti\u011fimiz y\u0131l kulland\u0131\u011f\u0131 enerjinin <strong>% 60<\/strong>\u2019\u0131n\u0131 \u00fcretebilecek. Projeyle <strong>karbondioksit sal\u0131m\u0131n\u0131<\/strong> y\u0131lda <strong>4 bin 186 ton<\/strong> azal\u0131rken <strong>349 bin a\u011fa\u00e7<\/strong> kurtulacak.\u201ddedi.<\/p>\n<p><strong>2019 y\u0131l\u0131nda<\/strong> EPDK taraf\u0131ndan yap\u0131lan<strong> mevzuat de\u011fi\u015fikli\u011fi<\/strong> kendi ihtiyac\u0131 i\u00e7in elektrik \u00fcretmek isteyen \u015firketlerin \u00f6n\u00fcn\u00fc a\u00e7arak bu alana yat\u0131r\u0131m yap\u0131lmas\u0131na olanak verirken Daikin, <strong>\u00c7at\u0131 GES projesi<\/strong> i\u00e7in bu s\u00fcreci ba\u015flatt\u0131. Mevzuata g\u00f6re<strong> 5.0 MW \u00fcst limiti<\/strong>ni kullanan Daikin, gerekli izinleri alarak kendi alan\u0131n\u0131n <strong>inovatif \u015firketi<\/strong> Kontek ile anla\u015fma imzalad\u0131. <strong>25 y\u0131la dayanan<\/strong> tecr\u00fcbesinin yan\u0131 s\u0131ra fabrikalarda uygulanan <strong>GES projeleri<\/strong> i\u00e7in \u00f6zel olarak geli\u015ftirdi\u011fi <strong>Power Plant Controller \u00e7\u00f6z\u00fcm\u00fc<\/strong> sunan Kontek, <strong>elektrik ve otomasyon uygulamalar\u0131<\/strong>yla da dikkat \u00e7ekiyor. <strong>GES projesi<\/strong>nde <strong>14 bin 400<\/strong> adet <strong>400 Wp<\/strong> PV Panel, 82.2 kW <strong>60 adet<\/strong> inverter, <strong>7 bin 200 optimizer<\/strong> kullan\u0131lacak. Toplam <strong>28 bin 900<\/strong> metrekarelik bir \u00e7at\u0131 alan\u0131n\u0131 kapsayan sistem, <strong>5.760 kWp<\/strong> kapasiteye sahip olacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Daikin, kendi enerjisini g\u00fcne\u015f enerjisinden \u00fcretmeye haz\u0131rlan\u0131rken yat\u0131r\u0131m maliyeti 3 milyon dolar olan ges projesiyle 5.760 kWp enerji \u00fcretimi ger\u00e7ekle\u015ftirerek ihtiyac\u0131n\u0131n yakla\u015f\u0131k [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":113256,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[71548,71541,3170,71543,53114,5070,71547,40807,52259,7440,71545,53157,36537,71550,71544,53407,13446,41805,51623,71551,71540,71546,71549,25775,71542,54979],"views":128,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113253"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=113253"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113253\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/113256"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=113253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=113253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=113253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}