{"id":113162,"date":"2020-05-07T16:29:22","date_gmt":"2020-05-07T13:29:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=113162"},"modified":"2020-05-07T16:29:22","modified_gmt":"2020-05-07T13:29:22","slug":"belarus-ngsye-ilk-yukleme-icin-nukleer-yakit-teslimati-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/belarus-ngsye-ilk-yukleme-icin-nukleer-yakit-teslimati-yapildi\/","title":{"rendered":"(Turkish) &#8217;Belarus NGS&#8217;ye \u0130lk Y\u00fckleme \u0130\u00e7in N\u00fckleer Yak\u0131t Teslimat\u0131 Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/113162\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>D\u00fc\u015f\u00fck zenginle\u015ftirilmi\u015f uranyum n\u00fckleer yak\u0131t\u0131n\u0131n ilk partisi Belarus NGS&#8217;nin (N\u00fckleer G\u00fc\u00e7 Santrali) in\u015faat sahas\u0131na teslim edildi. Rus yap\u0131m\u0131 yak\u0131t montajlar\u0131 halihaz\u0131rda bo\u015faltma ve inceleme i\u00e7in haz\u0131rlan\u0131yor.<\/h1>\n<p><strong>Yeni n\u00fckleer yak\u0131t\u0131n<\/strong> ilk tesliminin, bir <strong>n\u00fckleer santralin in\u015fas\u0131<\/strong>nda \u00f6nemli bir yeri oldu\u011funu belirten Rosatom\u2019un M\u00fchendislik B\u00f6l\u00fcm\u00fc <strong>ASE EC A.\u015e<\/strong> Ba\u015fkan Yard\u0131mc\u0131s\u0131 ve <strong>Belarus NGS \u0130n\u015faat <img loading=\"lazy\" class=\"alignright wp-image-113164\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/belarus-ngsye-ilk-yukleme-icin-nukleer-yakit-teslimati-yapildi.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/belarus-ngsye-ilk-yukleme-icin-nukleer-yakit-teslimati-yapildi.jpg 799w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/belarus-ngsye-ilk-yukleme-icin-nukleer-yakit-teslimati-yapildi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/belarus-ngsye-ilk-yukleme-icin-nukleer-yakit-teslimati-yapildi-768x512.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/belarus-ngsye-ilk-yukleme-icin-nukleer-yakit-teslimati-yapildi-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/belarus-ngsye-ilk-yukleme-icin-nukleer-yakit-teslimati-yapildi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/05\/belarus-ngsye-ilk-yukleme-icin-nukleer-yakit-teslimati-yapildi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Proje<\/strong> Direkt\u00f6r\u00fc <strong>Vitaliy Polyanin<\/strong> \u015funlar\u0131 s\u00f6yledi: &#8220;Bu olay <strong>Belarus Cumhuriyet<\/strong> tarihinde t\u00fcr\u00fcn\u00fcn ilk \u00f6rne\u011fi oldu\u011fu i\u00e7in ayr\u0131ca \u00f6nemli. Belaruslu meslekta\u015flar\u0131m\u0131z\u0131 bu ortak ba\u015far\u0131 i\u00e7in i\u00e7tenlikle tebrik ediyorum. Asl\u0131nda, fiziksel olarak faaliyete ge\u00e7mek i\u00e7in geri say\u0131m\u0131n ba\u015flad\u0131\u011f\u0131 an bu and\u0131r.\u201d<\/p>\n<p>Polyanin; &#8220;M\u00fc\u015fteri olan <strong>Belarus NGS<\/strong> operat\u00f6r\u00fc, <strong>Belarus Acil Durumlar Bakanl\u0131\u011f\u0131 ve Gosatomnadzor<\/strong>&#8216;un (Belarus N\u00fckleer G\u00f6zlemci Kurumu) yan\u0131 s\u0131ra yak\u0131t da\u011f\u0131t\u0131m\u0131nda gerekli ko\u015fullar\u0131 sa\u011flamak i\u00e7in \u00e7ok b\u00fcy\u00fck bir i\u015f yapt\u0131k, y<strong>eni n\u00fckleer yak\u0131t\u0131n teslimat\u0131<\/strong>n\u0131 ve g\u00fcvenli bir \u015fekilde depolanmas\u0131n\u0131 garanti alt\u0131na almak i\u00e7in <strong>\u00fcnitenin acil durum<\/strong> ve fiziksel koruma tesisleri de dahil olmak \u00fczere <strong>ilgili tesisleri, sistemleri ve ekipmanlar\u0131<\/strong> i\u015fletmeye ald\u0131k\u201d dedi.<\/p>\n<p>Toplam <strong>2 bin 400 MW<\/strong> g\u00fc\u00e7 kapasitesine sahip 2 \u00fcniteli <strong>Belarus NGS<\/strong>, son teknoloji \u00fcr\u00fcn\u00fc <strong>Rus tasar\u0131m\u0131<\/strong> olan <strong>VVER-1200 reakt\u00f6rlerle<\/strong> donat\u0131ld\u0131. Belarus&#8217;un ilk NGS&#8217;si olma \u00f6zelli\u011fi ta\u015f\u0131yan santral <strong>Ostrovets<\/strong> kasabas\u0131nda in\u015fa ediliyor ve uluslararas\u0131 standartlara, <strong>UAEA<\/strong>&#8216;n\u0131n (Uluslararas\u0131 Atom Enerji Ajans\u0131 ) g\u00fcvenlik tavsiyelerine tam olarak uyumlu olan <strong>Rus 3+<\/strong> nesil tasar\u0131m\u0131ndan olu\u015fuyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. D\u00fc\u015f\u00fck zenginle\u015ftirilmi\u015f uranyum n\u00fckleer yak\u0131t\u0131n\u0131n ilk partisi Belarus NGS&#8217;nin (N\u00fckleer G\u00fc\u00e7 Santrali) in\u015faat sahas\u0131na teslim edildi. Rus yap\u0131m\u0131 yak\u0131t montajlar\u0131 halihaz\u0131rda bo\u015faltma [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":113164,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[71485,71482,71483,71484,71480,71478,5070,52259,71481,35430,42363,28187,71486,5837,1342,71477,71479],"views":171,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113162"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=113162"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/113162\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/113164"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=113162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=113162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=113162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}