{"id":112631,"date":"2020-04-29T20:16:43","date_gmt":"2020-04-29T17:16:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=112631"},"modified":"2020-04-29T20:19:39","modified_gmt":"2020-04-29T17:19:39","slug":"enkanin-samawa-kombine-cevrim-santralinin-3-nolu-gtg-unitesi-ateslendi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enkanin-samawa-kombine-cevrim-santralinin-3-nolu-gtg-unitesi-ateslendi\/","title":{"rendered":"(Turkish) Enka&#8217;n\u0131n &#8216;Samawa Kombine \u00c7evrim Santrali&#8217;nin 3 Nolu GTG \u00dcnitesi Ate\u015flendi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/112631\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Enka taraf\u0131ndan 750 MW Samawa kombine \u00e7evrim elektrik santralinin 3 nolu GTG \u00fcnitesinin ilk ate\u015flemesi ba\u015far\u0131yla <strong><img loading=\"lazy\" class=\"alignright wp-image-112633\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/enka-nin-samawa-kombine-cevrim-santralinin-3-nolu-gtg-unitesi-ateslendi.jpg\" alt=\"\" width=\"320\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/enka-nin-samawa-kombine-cevrim-santralinin-3-nolu-gtg-unitesi-ateslendi.jpg 700w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/enka-nin-samawa-kombine-cevrim-santralinin-3-nolu-gtg-unitesi-ateslendi-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/enka-nin-samawa-kombine-cevrim-santralinin-3-nolu-gtg-unitesi-ateslendi-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/enka-nin-samawa-kombine-cevrim-santralinin-3-nolu-gtg-unitesi-ateslendi-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong>ger\u00e7ekle\u015fti.<\/h1>\n<p><strong>Enka<\/strong>&#8216;n\u0131n a\u00e7\u0131klamas\u0131na g\u00f6re, &#8220;Bu zor zamanlarda da \u00f6nceli\u011fimiz her zamanki gibi <strong>\u00e7al\u0131\u015fanlar\u0131m\u0131z\u0131n sa\u011fl\u0131\u011f\u0131 ve g\u00fcvenli\u011fi<\/strong>dir. Bununla beraber vir\u00fcs\u00fcn <strong>daha fazla yay\u0131l\u0131m\u0131na neden olmamak<\/strong> ad\u0131na, yapabilece\u011fimiz her\u00a0\u015feyi yap\u0131yoruz.<\/p>\n<p>Bu zor zamanlarda kar\u015f\u0131la\u015fmakta oldu\u011fumuz bir\u00e7ok zorlu\u011fa ra\u011fmen, <strong>ENKA<\/strong>\u2019n\u0131n, i\u015f orta\u011f\u0131 <strong>GE<\/strong> ile <strong>Irak<\/strong>\u2019ta bulunan, <strong>750 MW Samawa kombine \u00e7evrim elektrik santrali<\/strong> projesinde, kritik aktivitelerden birine ula\u015ft\u0131\u011f\u0131m\u0131z\u0131 bildirmekten mutluluk duyar\u0131z. 3 nolu <strong>GTG \u00fcnitesi<\/strong>nin ilk ate\u015flemesi, <strong>proje ekibi<\/strong> taraf\u0131ndan <strong>28 Nisan 2020<\/strong>&#8216;de ba\u015far\u0131yla tamamlanm\u0131\u015ft\u0131r.&#8221; ifadelerine yer verildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enka taraf\u0131ndan 750 MW Samawa kombine \u00e7evrim elektrik santralinin 3 nolu GTG \u00fcnitesinin ilk ate\u015flemesi ba\u015far\u0131yla ger\u00e7ekle\u015fti. Enka&#8216;n\u0131n a\u00e7\u0131klamas\u0131na g\u00f6re, &#8220;Bu zor [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":112633,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53],"tags":[70827,70830,54036,52259,1165,2422,70829,945,70831,70828],"views":192,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/112631"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=112631"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/112631\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/112633"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=112631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=112631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=112631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}