{"id":112109,"date":"2020-04-20T00:33:14","date_gmt":"2020-04-19T21:33:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=112109"},"modified":"2020-04-20T00:34:46","modified_gmt":"2020-04-19T21:34:46","slug":"aski-20-mw-gucunde-esik-hes-kurarak-isletecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aski-20-mw-gucunde-esik-hes-kurarak-isletecek\/","title":{"rendered":"(Turkish) ASK\u0130 20 MW G\u00fcc\u00fcnde &#8216;E\u015fik HES&#8217; Kurarak \u0130\u015fletecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/112109\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong><img loading=\"lazy\" class=\"alignright wp-image-112111\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/aski-20-mw-gucunde-esik-hes-kurarak-isletecek.jpg\" alt=\"\" width=\"320\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/aski-20-mw-gucunde-esik-hes-kurarak-isletecek.jpg 700w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/aski-20-mw-gucunde-esik-hes-kurarak-isletecek-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/aski-20-mw-gucunde-esik-hes-kurarak-isletecek-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/aski-20-mw-gucunde-esik-hes-kurarak-isletecek-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ASK\u0130 taraf\u0131ndan Ankara\u2019n\u0131n \u00c7aml\u0131dere il\u00e7esinde E\u015fik Deresi&#8217;nde 20 MW kapasiteye sahip E\u015fik Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali (HES) kurularak i\u015fletilecek.<\/strong><\/h1>\n<p><strong>Ankara B\u00fcy\u00fck\u015fehir Belediyesi Su ve Kanalizasyon \u0130daresi Genel Ba\u015fkanl\u0131\u011f\u0131<\/strong> taraf\u0131ndan <strong>E\u015fik Reg\u00fclat\u00f6r\u00fc ve HES<\/strong> (20,94 MWm\/20,25 MWe)<strong> Projesi<\/strong>\u2019nin hayata ge\u00e7irilmesi planlan\u0131rken tahmini\u00a0<strong>128 milyon lira<\/strong> yat\u0131r\u0131m bedeline sahip bu projenin\u00a0y\u0131lda <strong>41,06 GWh<\/strong> elektrik enerjisi \u00fcretece\u011fi \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>HES&#8217;de \u00fcretilen elektrik <strong>154 kV\u2019<\/strong>luk <strong>44 km uzunlu\u011funda<\/strong>ki <strong>enerji nakil hatt\u0131<\/strong> ile <strong>Gerkonsan TM<\/strong>\u2019ye aktar\u0131m\u0131 yap\u0131lacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ASK\u0130 taraf\u0131ndan Ankara\u2019n\u0131n \u00c7aml\u0131dere il\u00e7esinde E\u015fik Deresi&#8217;nde 20 MW kapasiteye sahip E\u015fik Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali (HES) kurularak i\u015fletilecek. Ankara B\u00fcy\u00fck\u015fehir Belediyesi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":112111,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[70334,53114,5070,21426,52259,70336,70335,34926,26043,26044,54979],"views":205,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/112109"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=112109"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/112109\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/112111"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=112109"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=112109"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=112109"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}