{"id":112105,"date":"2020-04-20T00:22:21","date_gmt":"2020-04-19T21:22:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=112105"},"modified":"2020-04-20T00:22:21","modified_gmt":"2020-04-19T21:22:21","slug":"siemens-gamesa-nin-ispanya-daki-turbin-uretimi-yeniden-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/siemens-gamesa-nin-ispanya-daki-turbin-uretimi-yeniden-basladi\/","title":{"rendered":"(Turkish) &#8217;Siemens Gamesa&#8217;n\u0131n \u0130spanya\u2019daki T\u00fcrbin \u00dcretimi Yeniden Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/112105\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Siemens Gamesa taraf\u0131ndan \u0130spanya&#8217;da koronovir\u00fcs salg\u0131n\u0131ndan dolay\u0131 2 hafta ara <img loading=\"lazy\" class=\"alignright wp-image-112107\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/siemens-gamesa-nin-ispanya-daki-turbin-uretimi-yeniden-basladi.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/siemens-gamesa-nin-ispanya-daki-turbin-uretimi-yeniden-basladi.jpg 940w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/siemens-gamesa-nin-ispanya-daki-turbin-uretimi-yeniden-basladi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/siemens-gamesa-nin-ispanya-daki-turbin-uretimi-yeniden-basladi-768x511.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/siemens-gamesa-nin-ispanya-daki-turbin-uretimi-yeniden-basladi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/siemens-gamesa-nin-ispanya-daki-turbin-uretimi-yeniden-basladi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/siemens-gamesa-nin-ispanya-daki-turbin-uretimi-yeniden-basladi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>verilen r\u00fczgar t\u00fcrbini ekipmanlar\u0131 \u00fcretimi devam ediyor.<\/h1>\n<p>R\u00fczgar enerjisi alan\u0131nda\u00a0<strong>Alman-\u0130spanyol ortakl\u0131\u011f\u0131<\/strong> <em>Siemens Gamesa Renewable Energy (SGRE)<\/em>&#8216;nin \u0130spanya\u2019da yer alan \u00fcretim faaliyetleri tekrardan ba\u015flad\u0131. \u015eirket,<strong> koronavir\u00fcs salg\u0131n\u0131<\/strong> nedeniyle <strong>temel olmayan faaliyetlerini<\/strong> durdurarak\u00a0<strong>\u0130spanya<\/strong> \u00e7ap\u0131nda\u00a0<strong>2 haftad\u0131r<\/strong> \u00fcretim ger\u00e7ekle\u015ftirmiyordu.<\/p>\n<p>\u015eirketin\u00a0<strong>Lerma<\/strong> ve <strong>Burgos<\/strong>&#8216;daki <strong>di\u015fli kutular\u0131 \u00fcreten<\/strong> fabrikalar\u0131, <strong>San Fernando de Henares<\/strong>&#8216;de bir <strong>elektronik ekipman tesisi<\/strong>ni, <strong>Somozas<\/strong>&#8216;ta bir <strong>r\u00fczgar t\u00fcrbini kanad\u0131 fabrikas\u0131<\/strong> ve <strong>\u00c1greda<\/strong>&#8216;da bir <strong>motor g\u00f6vdesi fabrikas\u0131<\/strong>da yeniden \u00fcretimlerine ba\u015flad\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Siemens Gamesa taraf\u0131ndan \u0130spanya&#8217;da koronovir\u00fcs salg\u0131n\u0131ndan dolay\u0131 2 hafta ara verilen r\u00fczgar t\u00fcrbini ekipmanlar\u0131 \u00fcretimi devam ediyor. R\u00fczgar enerjisi alan\u0131nda\u00a0Alman-\u0130spanyol ortakl\u0131\u011f\u0131 Siemens [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":112107,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[70331,52259,4353,66104,70329,70330,70333,28635,35984,70332],"views":206,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/112105"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=112105"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/112105\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/112107"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=112105"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=112105"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=112105"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}