{"id":111969,"date":"2020-04-17T01:14:06","date_gmt":"2020-04-16T22:14:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=111969"},"modified":"2020-04-17T01:14:06","modified_gmt":"2020-04-16T22:14:06","slug":"durma-enerji-dogalpark-sitesinde-66-kwplik-ges-projesini-hayata-gecirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/durma-enerji-dogalpark-sitesinde-66-kwplik-ges-projesini-hayata-gecirdi\/","title":{"rendered":"(Turkish) &#8217;Durma Enerji&#8217; Do\u011falpark Sitesinde 6,6 kWp&#8217;lik GES Projesini Hayata Ge\u00e7irdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/111969\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Durma Enerji\u2019nin proje ve uygulamas\u0131n\u0131 yapt\u0131\u011f\u0131 Do\u011falpark Sitesi ortak alan enerji <img loading=\"lazy\" class=\"alignright wp-image-111971\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/durma-enerji-dogalpark-sitesinde-66-kwplik-ges-projesini-hayata-gecirdi.jpg\" alt=\"\" width=\"320\" height=\"170\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/durma-enerji-dogalpark-sitesinde-66-kwplik-ges-projesini-hayata-gecirdi.jpg 921w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/durma-enerji-dogalpark-sitesinde-66-kwplik-ges-projesini-hayata-gecirdi-300x159.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/durma-enerji-dogalpark-sitesinde-66-kwplik-ges-projesini-hayata-gecirdi-768x407.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/durma-enerji-dogalpark-sitesinde-66-kwplik-ges-projesini-hayata-gecirdi-500x265.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/durma-enerji-dogalpark-sitesinde-66-kwplik-ges-projesini-hayata-gecirdi-80x42.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ihtiyac\u0131n\u0131 \u00e7at\u0131ya kurdu\u011fu GES ile kar\u015f\u0131layacak.<\/strong><\/h1>\n<p>T\u00fcrkiye\u2019de ilk kez <strong>Nil\u00fcfer Belediyesi<\/strong>\u2019nin ald\u0131\u011f\u0131 karar \u00e7er\u00e7evesinde, <strong>YG G\u00f6kta\u015f Ltd.\u015eti.<\/strong>\u2019ne ait <strong>Do\u011falpark Sitesi<\/strong> ortak alan enerji ihtiyac\u0131n\u0131 \u00e7at\u0131ya kurdu\u011fu <strong>GES<\/strong> ile kar\u015f\u0131layarak ve <strong>gri su geri kazan\u0131m<\/strong> yaparak <strong>10% kat irtifak\u0131<\/strong> hakk\u0131 kazand\u0131.<\/p>\n<p><strong>Durma Enerji<\/strong>\u2019nin proje ve uygulamas\u0131n\u0131 yapt\u0131\u011f\u0131 <strong>6,6 kWp kapasite<\/strong>lik kurulumu ile <strong>GES<\/strong>\u2019in <strong>8.700 kWh\/y\u0131l<\/strong> <em>enerji \u00fcretmesi<\/em> bekleniyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Durma Enerji\u2019nin proje ve uygulamas\u0131n\u0131 yapt\u0131\u011f\u0131 Do\u011falpark Sitesi ortak alan enerji ihtiyac\u0131n\u0131 \u00e7at\u0131ya kurdu\u011fu GES ile kar\u015f\u0131layacak. T\u00fcrkiye\u2019de ilk kez Nil\u00fcfer Belediyesi\u2019nin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":111971,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[66548,54838,70233,56726,52674,52259,35038,70231,53157,53757,70232,70230],"views":162,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111969"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=111969"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111969\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/111971"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=111969"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=111969"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=111969"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}