{"id":111910,"date":"2020-04-16T17:01:30","date_gmt":"2020-04-16T14:01:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=111910"},"modified":"2020-04-16T17:07:01","modified_gmt":"2020-04-16T14:07:01","slug":"osblerde-cati-ve-cephe-ges-uygulamalarina-yonelik-degisiklik","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/osblerde-cati-ve-cephe-ges-uygulamalarina-yonelik-degisiklik\/","title":{"rendered":"(Turkish) OSB&#8217;lerde \u00c7at\u0131 ve Cephe GES Uygulamalar\u0131na Y\u00f6nelik De\u011fi\u015fiklik"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/111910\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>OSB\u2019lerdeki g\u00fcne\u015f enerjisine dayal\u0131 elektrik enerjisi \u00fcretim tesislerinin \u00e7at\u0131 ve cephe uygulama alanlar\u0131 uygun olmamas\u0131 veya yetersiz olmas\u0131 durumunda yerde kurulacak tesisin, parsel alan\u0131n\u0131n % 25\u2019ini ge\u00e7meyecek.<\/h1>\n<p><strong>Sanayi ve Teknoloji Bakanl\u0131\u011f\u0131<\/strong> taraf\u0131ndan haz\u0131rlanan <strong>\u201cOrganize Sanayi B\u00f6lgeleri Uygulama <img loading=\"lazy\" class=\"alignright wp-image-111912\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/osblerde-cati-ve-cephe-ges-uygulamalarina-yonelik-degisiklik.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/osblerde-cati-ve-cephe-ges-uygulamalarina-yonelik-degisiklik.jpg 732w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/osblerde-cati-ve-cephe-ges-uygulamalarina-yonelik-degisiklik-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/osblerde-cati-ve-cephe-ges-uygulamalarina-yonelik-degisiklik-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/osblerde-cati-ve-cephe-ges-uygulamalarina-yonelik-degisiklik-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/osblerde-cati-ve-cephe-ges-uygulamalarina-yonelik-degisiklik-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Y\u00f6netmeli\u011finde De\u011fi\u015fiklik Yap\u0131lmas\u0131na Dair Y\u00f6netmelik\u201d<\/strong> Resmi Gazete\u2019nin <strong>16 Nisan 2020<\/strong> Tarih ve 31101 say\u0131l\u0131 n\u00fcshas\u0131nda yay\u0131mlanarak y\u00fcr\u00fcrl\u00fc\u011fe girdi. G\u00fcne\u015f enerjisine dayal\u0131 elektrik enerjisi \u00fcretim tesisleri, statik ve mimari a\u00e7\u0131dan <strong>\u00e7at\u0131 ve cephe uygulamas\u0131n\u0131n yap\u0131lamamas\u0131<\/strong> ya da ilave kapasiteye ihtiya\u00e7 olmas\u0131 halinde yerde kurulacak tesisin taban alan\u0131, parsel alan\u0131n\u0131n<strong> % 25\u2019ini ge\u00e7emeyece\u011fi<\/strong> h\u00fckm\u00fc yer ald\u0131.<\/p>\n<h2>S\u00f6z konusu y\u00f6netmeli\u011fin 43 \u00fcnc\u00fc maddesinin birinci f\u0131kras\u0131n\u0131n (g) bendinin (1) numaral\u0131 alt bendi <span style=\"text-decoration: underline;\">a\u015fa\u011f\u0131daki \u015fekilde de\u011fi\u015ftirildi;<\/span><\/h2>\n<p><em>\u201c1) Tesisin \u00e7al\u0131\u015fmas\u0131 ve i\u015fletilmesi i\u00e7in gerekli olan, LPG tank\u0131, yang\u0131n suyu deposu, ar\u0131tma tesisi, g\u00fcne\u015f ve r\u00fczg\u00e2r enerjisine dayal\u0131 elektrik enerjisi \u00fcretim tesisleri ve benzeri destek \u00fcniteleri parsel i\u00e7i ring yolu veya \u00e7evre ye\u015fili \u00fczerinde yer alamaz. G\u00fcne\u015f enerjisine dayal\u0131 elektrik enerjisi \u00fcretim tesisleri, \u00f6ncelikle \u00e7at\u0131 ve cephede kurulur. Statik ve mimari a\u00e7\u0131dan \u00e7at\u0131 ve cephe uygulamas\u0131n\u0131n yap\u0131lamamas\u0131 ya da ilave kapasiteye ihtiya\u00e7 olmas\u0131 halinde yerde kurulacak tesisin taban alan\u0131, parsel alan\u0131n\u0131n %25\u2019ini ge\u00e7emez. Bunun d\u0131\u015f\u0131nda parsel i\u00e7indeki konumunun uygunlu\u011funa, ilgili mevzuata g\u00f6re OSB karar verir.\u201d<\/em><\/p>\n<p>Ayn\u0131 y\u00f6netmeli\u011fin 54 \u00fcnc\u00fc maddesinin birinci f\u0131kras\u0131n\u0131n (b) bendinin (9) numaral\u0131 alt bendi ve ikinci f\u0131kras\u0131n\u0131n (c) bendi ile \u00fc\u00e7\u00fcnc\u00fc f\u0131kras\u0131 a\u015fa\u011f\u0131daki <span style=\"text-decoration: underline;\">\u015fekilde de\u011fi\u015ftirildi;<\/span><\/p>\n<p><em>\u201c9) Sanayi parselleri ile hizmet destek alanlar\u0131nda kat\u0131l\u0131mc\u0131n\u0131n kendi ihtiyac\u0131 i\u00e7in kurulanlar hari\u00e7 olmak \u00fczere, g\u00fcne\u015f ve r\u00fczgar enerjisine dayal\u0131 elektrik enerjisi \u00fcreten tesisler\u201d<\/em><\/p>\n<p><em>\u201cc) OSB\u2019ye ait teknik altyap\u0131 alan\u0131nda olmas\u0131 ve m\u00fcte\u015febbis heyet\/genel kurul karar\u0131 al\u0131nmas\u0131 \u015fart\u0131 ile geri d\u00f6n\u00fc\u015f\u00fcm ve bertaraf tesisleri\u201d<\/em><\/p>\n<p><em>\u201c(3) Birinci ve ikinci f\u0131kra haricinde, OSB\u2019de kurulmas\u0131nda sak\u0131nca g\u00f6r\u00fclen tesisler hakk\u0131nda OSB\u2019nin kurulu\u015f protokol\u00fc \u00e7er\u00e7evesinde kurulmas\u0131 planlanan sekt\u00f6rler, mevcut sekt\u00f6r yap\u0131s\u0131, kurulacak tesisin altyap\u0131 ve at\u0131k su ar\u0131tma tesislerine etkisi, herhangi bir olumsuzluk an\u0131nda tetikleyici etkisi, insanlar\u0131n \u00e7al\u0131\u015fma ve ya\u015fam ko\u015fullar\u0131na etkisi gibi hususlar dikkate al\u0131narak konu ile ilgili kurumlardan al\u0131nacak raporlar \u00e7er\u00e7evesinde karar verilir. \u0130lgilinin Bakanl\u0131\u011fa ba\u015fvurmas\u0131 \u00fczerine, OSB taraf\u0131ndan OSB\u2019de kurulamayaca\u011f\u0131na karar verilen tesise ili\u015fkin nihai karar, Bakanl\u0131k Makam\u0131ndan al\u0131nacak onay ile verilir.\u201d\u00a0<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. OSB\u2019lerdeki g\u00fcne\u015f enerjisine dayal\u0131 elektrik enerjisi \u00fcretim tesislerinin \u00e7at\u0131 ve cephe uygulama alanlar\u0131 uygun olmamas\u0131 veya yetersiz olmas\u0131 durumunda yerde kurulacak tesisin, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":111912,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[70178,54347,70177,53114,52259,70179,53157,70176,9071,1545,1388,15785],"views":348,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111910"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=111910"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111910\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/111912"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=111910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=111910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=111910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}