{"id":111676,"date":"2020-04-12T19:24:05","date_gmt":"2020-04-12T16:24:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=111676"},"modified":"2020-04-12T19:30:12","modified_gmt":"2020-04-12T16:30:12","slug":"cetin-baraji-ve-hidroelektrik-santrali-enerji-uretimine-gecti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cetin-baraji-ve-hidroelektrik-santrali-enerji-uretimine-gecti\/","title":{"rendered":"&#8217;\u00c7etin Dam and Hydroelectric Power Plant&#8217; Started Energy Production"},"content":{"rendered":"<p><\/p>\n<h1>The Construction of \u00c7etin Dam and Hydroelectric Power Plant, which is located on the Botan Stream within the boundaries <img loading=\"lazy\" class=\"alignright wp-image-111678\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cetin-baraji-ve-hidroelektrik-santrali-enerji-uretimine-gecti.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cetin-baraji-ve-hidroelektrik-santrali-enerji-uretimine-gecti.jpg 1536w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cetin-baraji-ve-hidroelektrik-santrali-enerji-uretimine-gecti-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cetin-baraji-ve-hidroelektrik-santrali-enerji-uretimine-gecti-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cetin-baraji-ve-hidroelektrik-santrali-enerji-uretimine-gecti-1024x576.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cetin-baraji-ve-hidroelektrik-santrali-enerji-uretimine-gecti-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cetin-baraji-ve-hidroelektrik-santrali-enerji-uretimine-gecti-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>of \u015eirvan and Pervari district of Siirt, began in July 2017 by Limak \u0130n\u015faat.<\/h1>\n<p>\u00c7etin Dam and Hydroelectric Power Plant started energy production with 2 units accepted by the Ministry. The planned total installed capacity of 420 MW \u00c7etin Dam and Hydroelectric Power Plant will generate 1 billion 174 million kwh energy annually.<\/p>\n<p>The largest RCC body type dam of Turkey and Europe with 165 meters height and 4.726.527 m3 dam body volume, \u00c7etin Dam and Hydroelectric Power Plant\u2019s remaining 2 units will start energy production in May.<\/p>","protected":false},"excerpt":{"rendered":"<p>The Construction of \u00c7etin Dam and Hydroelectric Power Plant, which is located on the Botan Stream within the boundaries of \u015eirvan and Pervari district of Siirt, began in July 2017 by Limak \u0130n\u015faat. \u00c7etin Dam and Hydroelectric Power Plant started energy production with 2 units accepted by the Ministry. The planned total installed capacity of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":111678,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[17617,70001,17165,70002,43643,67582,5070,42993,52379,52259,18,26043,43807,26044,43728,70003,2953,70004,70000,70005,5196,69999],"views":509,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111676"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=111676"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111676\/revisions"}],"predecessor-version":[{"id":111680,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111676\/revisions\/111680"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/111678"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=111676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=111676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=111676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}