{"id":111582,"date":"2020-04-10T15:25:10","date_gmt":"2020-04-10T12:25:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=111582"},"modified":"2020-04-10T15:25:10","modified_gmt":"2020-04-10T12:25:10","slug":"cinli-sirket-ispartada-1000-mw-gucunde-hes-hayata-gecirecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cinli-sirket-ispartada-1000-mw-gucunde-hes-hayata-gecirecek\/","title":{"rendered":"(Turkish) \u00c7inli \u015eirket Isparta\u2019da 1000 MW G\u00fcc\u00fcnde HES Hayata Ge\u00e7irecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/111582\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u00c7inli Gezhouba Group taraf\u0131ndan Isparta\u2019da yap\u0131lacak HES projesi i\u00e7in 1,5 milyar dolar de\u011ferinde m\u00fchendislik, tedarik ve in\u015faat <img loading=\"lazy\" class=\"alignright wp-image-111586\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cinli-sirket-ispartada-1000-mw-gucunde-hes-hayata-gecirecek.jpg\" alt=\"\" width=\"320\" height=\"226\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cinli-sirket-ispartada-1000-mw-gucunde-hes-hayata-gecirecek.jpg 750w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cinli-sirket-ispartada-1000-mw-gucunde-hes-hayata-gecirecek-300x212.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cinli-sirket-ispartada-1000-mw-gucunde-hes-hayata-gecirecek-500x353.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/cinli-sirket-ispartada-1000-mw-gucunde-hes-hayata-gecirecek-71x50.jpg 71w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>s\u00f6zle\u015fmesi (EPC) anla\u015fmas\u0131 imzaland\u0131.<\/h1>\n<p><strong>\u00c7in<\/strong> Wuhan merkezli <strong>in\u015faat ve m\u00fchendislik<\/strong> \u015firketi <strong>Gezhouba Group<\/strong>, Isparta\u2019da kurulacak <strong>1000 MW<\/strong> kapasiteli <strong>hidroelektrik santrali projesi<\/strong> i\u00e7in <strong>KAF Teknik Yap\u0131<\/strong> ile <strong>1,5 milyar dolar<\/strong> de\u011ferinde <strong>m\u00fchendislik, tedarik<\/strong> ve <strong>in\u015faat s\u00f6zle\u015fmesi (EPC)<\/strong> imzalad\u0131\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.<\/p>\n<p>A\u00e7\u0131klamaya g\u00f6re <strong>Gezhouba Group<\/strong>, tek <strong>EPC y\u00fcklenicisi<\/strong> olarak \u015firket olarak <strong>projenin finansman\u0131<\/strong>na yard\u0131mc\u0131 olacak. Santral <strong>4<\/strong> adet <strong>250mW<\/strong>&#8216;l\u0131k <strong>\u00fcretim \u00fcnitesi<\/strong>nden olu\u015facak. <strong>Santralin in\u015fa \u00e7al\u0131\u015fmalar\u0131<\/strong>n\u0131n ba\u015flamas\u0131ndan itibaren <strong>75 ay i\u00e7inde<\/strong> tamamlanmas\u0131 ve faaliyete ge\u00e7ece\u011fi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7inli Gezhouba Group taraf\u0131ndan Isparta\u2019da yap\u0131lacak HES projesi i\u00e7in 1,5 milyar dolar de\u011ferinde m\u00fchendislik, tedarik ve in\u015faat s\u00f6zle\u015fmesi (EPC) anla\u015fmas\u0131 imzaland\u0131. \u00c7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":111586,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[69926,69924,52259,69930,69929,26043,6979,26044,2579,69925,69928,14167,69927,26556,8265],"views":524,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111582"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=111582"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111582\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/111586"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=111582"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=111582"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=111582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}