{"id":111578,"date":"2020-04-10T14:37:48","date_gmt":"2020-04-10T11:37:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=111578"},"modified":"2020-04-10T14:38:19","modified_gmt":"2020-04-10T11:38:19","slug":"yozgat-belediyesi-3-mwlik-gunes-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yozgat-belediyesi-3-mwlik-gunes-santrali-kuracak\/","title":{"rendered":"(Turkish) Yozgat Belediyesi 3 MW\u2019l\u0131k G\u00fcne\u015f Santrali Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/111578\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Yozgat Belediyesi taraf\u0131ndan elektrik ihtiyac\u0131n\u0131n kar\u015f\u0131lanabilmesine y\u00f6nelik Merkez il\u00e7eye ba\u011fl\u0131 Evci K\u00f6y\u00fc s\u0131n\u0131rlar\u0131 i\u00e7inde <img loading=\"lazy\" class=\"alignright wp-image-111580\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/yozgat-belediyesi-3-mwlik-gunes-santrali-kuracak.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/yozgat-belediyesi-3-mwlik-gunes-santrali-kuracak.jpg 533w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/yozgat-belediyesi-3-mwlik-gunes-santrali-kuracak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/yozgat-belediyesi-3-mwlik-gunes-santrali-kuracak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/yozgat-belediyesi-3-mwlik-gunes-santrali-kuracak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/yozgat-belediyesi-3-mwlik-gunes-santrali-kuracak-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>3 MW kapasiteye sahip g\u00fcne\u015f enerjisi santrali kurulacak.<\/h1>\n<p><strong>Yozgat \u0130li, Merkez \u0130l\u00e7esi, Evci K\u00f6y\u00fc\u2019nde<\/strong> toplamda <strong>42.7 bin metrekare<\/strong> alanda <strong>Yozgat Belediye Ba\u015fkanl\u0131\u011f\u0131<\/strong> taraf\u0131ndan <strong>G\u00fcne\u015f Enerji Santrali (3 MWe)<\/strong> yap\u0131lmas\u0131 planlan\u0131yor. <strong>9 milyon lira<\/strong> bedelli <strong>projenin \u00f6mr\u00fc<\/strong> yap\u0131lan <strong>makine ekipman revizyonlar\u0131<\/strong> ve <strong>bir tak\u0131m tamir bak\u0131m i\u015flemleri<\/strong>nin s\u00fcreklili\u011fi ile <strong>50 y\u0131l<\/strong> olarak planlan\u0131yor.<\/p>\n<p>Santralde <strong>\u00fcretilen elektrik<\/strong> enerjisi <strong>Yozgat Belediyesi<\/strong>\u2019nin <strong>ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131layabilmek<\/strong> amac\u0131yla kullan\u0131lacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Yozgat Belediyesi taraf\u0131ndan elektrik ihtiyac\u0131n\u0131n kar\u015f\u0131lanabilmesine y\u00f6nelik Merkez il\u00e7eye ba\u011fl\u0131 Evci K\u00f6y\u00fc s\u0131n\u0131rlar\u0131 i\u00e7inde 3 MW kapasiteye sahip g\u00fcne\u015f enerjisi santrali kurulacak. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":111580,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[69922,5070,52259,69921,69923,53157,32235],"views":128,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111578"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=111578"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111578\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/111580"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=111578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=111578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=111578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}