{"id":111566,"date":"2020-04-10T11:15:48","date_gmt":"2020-04-10T08:15:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=111566"},"modified":"2020-04-10T11:18:38","modified_gmt":"2020-04-10T08:18:38","slug":"ittifak-holding-akbank-kredisini-yapilandirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ittifak-holding-akbank-kredisini-yapilandirdi\/","title":{"rendered":"(Turkish) &#8217;\u0130ttifak Holding&#8217; Akbank Kredisini Yap\u0131land\u0131rd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/111566\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u0130ttifak Holding taraf\u0131ndan Akbank kredisinin vadesiyle faiz oran\u0131n\u0131n g\u00fcncellenmesine y\u00f6nelik yeni bir s\u00f6zle\u015fme <img loading=\"lazy\" class=\"alignright wp-image-111568\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/ittifak-holdingten-akbank-kredisine-yapilandirma.jpg\" alt=\"\" width=\"320\" height=\"164\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/ittifak-holdingten-akbank-kredisine-yapilandirma.jpg 1080w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/ittifak-holdingten-akbank-kredisine-yapilandirma-300x154.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/ittifak-holdingten-akbank-kredisine-yapilandirma-768x394.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/ittifak-holdingten-akbank-kredisine-yapilandirma-1024x525.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/ittifak-holdingten-akbank-kredisine-yapilandirma-500x256.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/04\/ittifak-holdingten-akbank-kredisine-yapilandirma-80x41.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>imzaland\u0131.<\/h1>\n<p><strong>\u0130ttifak Holding A\u015e<\/strong>, <strong>Akbank TA\u015e<\/strong> ile yapt\u0131\u011f\u0131 <strong>12.957.953,73 TL<\/strong> tutar\u0131ndaki <strong>kredi s\u00f6zle\u015fmesi<\/strong>ni yap\u0131land\u0131rd\u0131.<\/p>\n<p><strong>Yap\u0131land\u0131rma s\u00f6zle\u015fmesi kapsam\u0131<\/strong>nda, kredinin y\u0131ll\u0131k <strong>%30,90<\/strong> olan faiz oran\u0131, <strong>%11,5<\/strong> olarak g\u00fcncellenirken\u00a0<strong>kredi \u00f6demeleri<\/strong>, <strong>30 Temmuz 2020<\/strong> tarihine kadar <strong>\u00f6demesiz<\/strong> olmak \u00fczere, <strong>50 ay vadeli<\/strong> <span style=\"text-decoration: underline;\">ayl\u0131k e\u015fit taksitler<\/span> halinde olurken \u015firket, <strong>kredi borcu oldu\u011fu<\/strong> bankalar ile bir s\u00fcredir <strong>yap\u0131land\u0131rma g\u00f6r\u00fc\u015fmelerini<\/strong> s\u00fcrd\u00fcr\u00fcyordu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130ttifak Holding taraf\u0131ndan Akbank kredisinin vadesiyle faiz oran\u0131n\u0131n g\u00fcncellenmesine y\u00f6nelik yeni bir s\u00f6zle\u015fme imzaland\u0131. \u0130ttifak Holding A\u015e, Akbank TA\u015e ile yapt\u0131\u011f\u0131 12.957.953,73 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":111568,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[69915,5070,52259,69918,53157,69914,69917,26618,48662,69916],"views":149,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111566"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=111566"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/111566\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/111568"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=111566"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=111566"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=111566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}