{"id":110932,"date":"2020-03-29T17:49:27","date_gmt":"2020-03-29T14:49:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=110932"},"modified":"2020-03-29T17:50:07","modified_gmt":"2020-03-29T14:50:07","slug":"2019-yilinda-kuresel-komur-santrallerinin-kapasitesi-yuzde-16-oraninda-azaldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2019-yilinda-kuresel-komur-santrallerinin-kapasitesi-yuzde-16-oraninda-azaldi\/","title":{"rendered":"(Turkish) 2019 Y\u0131l\u0131nda K\u00fcresel K\u00f6m\u00fcr Santrallerinin Kapasitesi % 16 Oran\u0131nda Azald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/110932\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>K\u00fcresel Enerji \u0130zleme, Greenpeace, Sierra Club ve Enerji ve Temiz Hava Ara\u015ft\u0131rma Merkezi&#8217;nin y\u0131ll\u0131k ara\u015ft\u0131rma sonu\u00e7lar\u0131na g\u00f6re k\u00fcresel k\u00f6m\u00fcr santral boru hatt\u0131, in\u015faat ve geli\u015fme kapasitesi a\u00e7\u0131s\u0131ndan % 16 oran\u0131nda azald\u0131.<\/h1>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-110934\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/2019-yilinda-kuresel-komur-santrallerinin-kapasitesi-16-oraninda-azaldi.jpg\" alt=\"\" width=\"320\" height=\"195\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/2019-yilinda-kuresel-komur-santrallerinin-kapasitesi-16-oraninda-azaldi.jpg 411w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/2019-yilinda-kuresel-komur-santrallerinin-kapasitesi-16-oraninda-azaldi-300x182.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/2019-yilinda-kuresel-komur-santrallerinin-kapasitesi-16-oraninda-azaldi-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>\u00c7evre \u00f6rg\u00fctleri<\/strong>nin ara\u015ft\u0131rmas\u0131na g\u00f6re <strong>k\u00fcresel \u00e7apta k\u00f6m\u00fcrl\u00fc elektrik santralleri<\/strong>nde geli\u015fim <strong>2019 y\u0131l\u0131nda<\/strong> da d\u00fc\u015f\u00fc\u015f\u00fcn\u00fc s\u00fcrd\u00fcrerek <strong>4&#8217;\u00fcnc\u00fc<\/strong> y\u0131lda da geriledi. Ara\u015ft\u0131rmaya g\u00f6re bu y\u0131l <strong>koronavir\u00fcs<\/strong> nedeniyle \u015fimdiye kadar <strong>13 gigawattl\u0131k (GW)<\/strong> in\u015faat kapasitesi durduruldu.<\/p>\n<p><strong>K\u00fcresel Enerji \u0130zleme, Greenpeace, Sierra Club ve Enerji &amp; Temiz Hava Ara\u015ft\u0131rma Merkezi<\/strong>&#8216;nin y\u0131ll\u0131k ara\u015ft\u0131rmas\u0131na g\u00f6re <strong>k\u00fcresel k\u00f6m\u00fcr santral boru hatt\u0131, in\u015faat<\/strong> ve <strong>geli\u015fme kapasitesi<\/strong> a\u00e7\u0131s\u0131ndan <strong>% 16<\/strong> oran\u0131nda azald\u0131.<\/p>\n<p>Bu y\u0131l ise koronavir\u00fcs \u00f6nlemleri sonucu <strong>13 GW&#8217;lik<\/strong> toplam kapasiteli <strong>santral i\u015fg\u00fcc\u00fc<\/strong> veya<strong> tedarik zinciri sorunlar\u0131<\/strong> nedeniyle ertelendi\u011fi\u00a0 belirtilirken \u00c7in&#8217;in bu y\u0131l <strong>1-18 Mart 2020<\/strong> tarihleri aras\u0131nda onaylad\u0131\u011f\u0131 <strong>k\u00f6m\u00fcr santrali kapasitesi<\/strong>nin <strong>2019 y\u0131l\u0131 boyunca<\/strong> onaylad\u0131\u011f\u0131ndan daha fazla oldu\u011fu dile getirildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. K\u00fcresel Enerji \u0130zleme, Greenpeace, Sierra Club ve Enerji ve Temiz Hava Ara\u015ft\u0131rma Merkezi&#8217;nin y\u0131ll\u0131k ara\u015ft\u0131rma sonu\u00e7lar\u0131na g\u00f6re k\u00fcresel k\u00f6m\u00fcr santral boru hatt\u0131, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":110934,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,24649],"tags":[55568,69387,52259,69385,1401,69388,54362,65693,69383,69386,53315,69384],"views":105,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110932"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=110932"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110932\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/110934"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=110932"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=110932"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=110932"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}