{"id":110794,"date":"2020-03-26T15:46:03","date_gmt":"2020-03-26T12:46:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=110794"},"modified":"2020-03-26T15:48:10","modified_gmt":"2020-03-26T12:48:10","slug":"kozloduy-un-ngs-5-ve-6inci-unitelerine-notron-akisi-izleme-ihalesi-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kozloduy-un-ngs-5-ve-6inci-unitelerine-notron-akisi-izleme-ihalesi-yapildi\/","title":{"rendered":"(Turkish) Kozloduy&#8217;un NGS 5 ve 6&#8217;\u0131nc\u0131 \u00dcnitelerine N\u00f6tron Ak\u0131\u015f\u0131 \u0130zleme \u0130halesi Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/110794\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Rusya Devlet Atom Enerjisi Kurumu Rosatom\u2019un elektrik enerjisi b\u00f6l\u00fcm\u00fc Rusatom Hizmet A.\u015e ile Kozloduy NGS (Bulgaristan), tesisin 5 ve 6\u2019\u0131nc\u0131 \u00fcniteleri i\u00e7in n\u00f6tron ak\u0131 izleme ekipman\u0131 modernizasyonuna ili\u015fkin bir s\u00f6zle\u015fme imzalad\u0131. Bu s\u00f6zle\u015fme, Eyl\u00fcl 2019&#8217;da a\u00e7\u0131klanan kamu ihalesinin sonu\u00e7lar\u0131na g\u00f6re ger\u00e7ekle\u015fti.<\/h1>\n<p>N\u00f6tron ak\u0131s\u0131 izleme ekipman\u0131, <strong>NGS g\u00fcvenli\u011fi<\/strong>nin sa\u011flanmas\u0131nda \u00f6nemli bir rol oynuyor ve <strong>VVER reakt\u00f6r kontrol<\/strong> ve <strong>koruma sistemleri<\/strong>nde kullan\u0131l\u0131yor.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-110797\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/kozloduy-un-ngs-5-ve-6inci-unitelerine-notron-akisi-izleme-ihalesi-yapildi.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/kozloduy-un-ngs-5-ve-6inci-unitelerine-notron-akisi-izleme-ihalesi-yapildi.jpg 729w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/kozloduy-un-ngs-5-ve-6inci-unitelerine-notron-akisi-izleme-ihalesi-yapildi-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/kozloduy-un-ngs-5-ve-6inci-unitelerine-notron-akisi-izleme-ihalesi-yapildi-500x335.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/kozloduy-un-ngs-5-ve-6inci-unitelerine-notron-akisi-izleme-ihalesi-yapildi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/kozloduy-un-ngs-5-ve-6inci-unitelerine-notron-akisi-izleme-ihalesi-yapildi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>N\u00f6tron ak\u0131 izleme ekipman\u0131 modernizasyonu<\/strong>, y\u00fcksek \u00f6ncelikli bir g\u00f6rev olarak tan\u0131mlan\u0131yor. Gerekli teknik belgelerin onaylanmas\u0131nda <strong>OKB GIDROPRESS A\u015e.<\/strong> (Kozloduy NGS reakt\u00f6rlerinin ba\u015f tasar\u0131mc\u0131s\u0131) ve <strong>Kurchatov Enstit\u00fcs\u00fc Ulusal Ara\u015ft\u0131rma Merkezi<\/strong> (tesisin n\u00fckleer ara\u015ft\u0131rma dan\u0131\u015fman\u0131) yer al\u0131yor. Benzer projelerde deneyim ve referanslara sahip olan <strong>SNIIP Systematom A\u015e<\/strong>, ekipman\u0131n <strong>ana bile\u015fenlerinin tedarik\u00e7isi<\/strong> olarak g\u00f6rev al\u0131yor.<\/p>\n<p>Bulgaristan&#8217;daki <strong>Kozloduy NGS<\/strong> i\u00e7in <strong>Rusatom Servisi<\/strong> proje portf\u00f6y\u00fc,<strong> 5-6 numaral\u0131<\/strong> g\u00fc\u00e7 \u00fcnitesinin \u00f6mr\u00fcn\u00fcn uzat\u0131lmas\u0131 i\u00e7in tamamlanm\u0131\u015f bir fizibilite \u00e7al\u0131\u015fmas\u0131 ve <strong>% 104<\/strong>&#8216;e kadar y\u00fckseltilmi\u015f bir kapasiteye ula\u015f\u0131lmas\u0131n\u0131 sa\u011flayan <strong>turbo jenerat\u00f6rlerin modernizasyonu<\/strong> da dahil olmak \u00fczere bir dizi \u00f6nemli g\u00f6revi i\u00e7eriyor.<\/p>\n<p>Rusatom Hizmet A\u015e, Rosatom Devlet \u015eirketi&#8217;nin <strong>&#8220;Elektrik Enerjisi&#8221; b\u00f6l\u00fcm\u00fc<\/strong>n\u00fcn bir \u00fcyesi. \u015eirket, <strong>VVER tipi reakt\u00f6rleri<\/strong> i\u015fleten <strong>yabanc\u0131 n\u00fckleer enerji santralleri<\/strong>nin <strong>bak\u0131m ve onar\u0131m\u0131<\/strong> i\u00e7in gerekli t\u00fcm hizmet ve malzemelerin tedarikini sa\u011fl\u0131yor. \u015eirket, Rusya d\u0131\u015f\u0131ndaki mevcut <strong>NGS VVER g\u00fc\u00e7 \u00fcniteleri<\/strong> ile hemen hemen her \u00fclkede piyasas\u0131nda yer al\u0131yor.<\/p>\n<p><strong>Rusatom Hizmet A\u015e<\/strong>,<em> \u00c7in, Bulgaristan ve Ermenistan<\/em> pazarlar\u0131nda lider konumda ve kullan\u0131m \u00f6mr\u00fcn\u00fc uzatma, planl\u0131 \u00f6nleyici bak\u0131m uygulanmas\u0131 ve <strong>VVER n\u00fckleer santralleri<\/strong>ndeki ekipmanlar\u0131n iyile\u015ftirilmesi i\u00e7in genel y\u00fcklenici olarak g\u00f6rev yap\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet Atom Enerjisi Kurumu Rosatom\u2019un elektrik enerjisi b\u00f6l\u00fcm\u00fc Rusatom Hizmet A.\u015e ile Kozloduy NGS (Bulgaristan), tesisin 5 ve 6\u2019\u0131nc\u0131 \u00fcniteleri i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":110797,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[53114,5070,52259,69282,62414,69276,69277,69283,53348,69278,2587,69285,69275,69281,42759,69280,69284,69279],"views":90,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110794"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=110794"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110794\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/110797"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=110794"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=110794"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=110794"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}