{"id":110748,"date":"2020-03-25T12:35:50","date_gmt":"2020-03-25T09:35:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=110748"},"modified":"2020-03-25T12:36:18","modified_gmt":"2020-03-25T09:36:18","slug":"ayen-enerji-caypinar-res-elektrik-uretim-lisansini-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ayen-enerji-caypinar-res-elektrik-uretim-lisansini-aldi\/","title":{"rendered":"(Turkish) &#8217;Ayen Enerji&#8217; \u00c7ayp\u0131nar RES Elektrik \u00dcretim Lisans\u0131n\u0131 Ald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/110748\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div id=\"iceriks\">\n<h1><strong>Ayen Enerji, \u00c7ayp\u0131nar R\u00fczg\u00e2r Enerjisi Elektrik \u00dcretim Tesisi projesine y\u00f6nelik \u00dcretim Lisans\u0131 ald\u0131.<\/strong><\/h1>\n<p>\u015eirket&#8217;ten konuya y\u00f6nelik\u00a0<strong>Kamu Ayd\u0131nlatma Platformu\u2019na (KAP)<\/strong> yap\u0131lan a\u00e7\u0131klamada \u015fu bilgilere yer verildi: &#8220;<strong>Ayen Enerji A.\u015e.<\/strong> taraf\u0131ndan, <strong>Bal\u0131kesir ili, Kepsut \u0130l\u00e7esi<\/strong> s\u0131n\u0131rlar\u0131 i\u00e7erisinde tesis edilmekte olan <strong>25,2 MWm\/24 MWe<\/strong> kurulu g\u00fcc\u00fcnde, y\u0131ll\u0131k <strong>84.000.000 kWh<\/strong> elektrik enerjisi <img loading=\"lazy\" class=\"alignright wp-image-110750\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/ayen-enerji-caypinar-res-elektrik-uretim-lisansini-aldi-1.jpg\" alt=\"\" width=\"320\" height=\"181\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/ayen-enerji-caypinar-res-elektrik-uretim-lisansini-aldi-1.jpg 1200w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/ayen-enerji-caypinar-res-elektrik-uretim-lisansini-aldi-1-300x170.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/ayen-enerji-caypinar-res-elektrik-uretim-lisansini-aldi-1-768x435.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/ayen-enerji-caypinar-res-elektrik-uretim-lisansini-aldi-1-1024x579.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/ayen-enerji-caypinar-res-elektrik-uretim-lisansini-aldi-1-500x283.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/ayen-enerji-caypinar-res-elektrik-uretim-lisansini-aldi-1-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>\u00fcretim kapasiteli <strong>\u00c7ayp\u0131nar R\u00fczg\u00e2r Enerjisi Elektrik \u00dcretim Tesisi projesi<\/strong> i\u00e7in<strong> 6446 say\u0131l\u0131 Elektrik Piyasas\u0131 Kanunu<\/strong> ve ilgili mevzuat uyar\u0131nca <strong>Enerji Piyasas\u0131 D\u00fczenleme Kurumu<\/strong>&#8216;ndan <strong>E\u00dc\/9146-3\/04419 say\u0131l\u0131<\/strong> \u00dcretim Lisans\u0131 al\u0131nm\u0131\u015ft\u0131r.<\/p>\n<p>\u015eirketimizin stratejik hedefleri ve b\u00fcy\u00fcme politikalar\u0131 \u00e7er\u00e7evesinde, \u00c7ayp\u0131nar R\u00fczg\u00e2r Enerjisi \u00dcretim Tesisi&#8217;nin yap\u0131m\u0131n\u0131n ve i\u015fletmesinin, <strong>%100 oran\u0131nda<\/strong> hissedar\u0131 oldu\u011fumuz <strong>Ayen Ostim Enerji \u00dcretim A.\u015e.<\/strong> uhdesinde yap\u0131labilmesi i\u00e7in <strong>Enerji Piyasas\u0131 D\u00fczenleme Kurumu<\/strong>na yapt\u0131\u011f\u0131m\u0131z ba\u015fvuru, Kurul&#8217;un <strong>19.03.2020 ve 9249-14 say\u0131l\u0131<\/strong> Karar&#8217;\u0131 ile onaylanm\u0131\u015ft\u0131r.<\/p>\n<p>Bu karar \u00e7er\u00e7evesinde\u00a0<strong>\u00c7ayp\u0131nar R\u00fczg\u00e2r Enerjsi \u00dcretim Tesisi i\u00e7in Ayen Enerji A.\u015e.<\/strong>&#8216;ne verilmi\u015f olan \u00dcretim Lisans\u0131n\u0131n <strong>iptal edilmesine<\/strong> ve onun yerine ge\u00e7mek \u00fczere <strong>Ayen Enerji A.\u015e.<\/strong>&#8216;nin <strong>% 100 oran\u0131nda<\/strong> Ba\u011fl\u0131 Ortakl\u0131\u011f\u0131 olan <strong>Ayen Ostim Enerji \u00dcretim A.\u015e.<\/strong>&#8216;nin <strong>\u00c7ayp\u0131nar R\u00fczg\u00e2r Enerjisi \u00dcretim Tesisi<\/strong> i\u00e7in <strong>48 (k\u0131rksekiz) y\u0131l, 10 (on) ay, 4 (d\u00f6rt)\u00a0<\/strong>g\u00fcn s\u00fcreli eskisinin devam\u0131 mahiyetinde \u00dcretim Lisans\u0131 Verilmesine Karar verilmi\u015ftir.<\/p>\n<p>Lisans\u0131n al\u0131nmas\u0131 ile birlikte, <strong>\u00c7ayp\u0131nar R\u00fczg\u00e2r Enerjisi \u00dcretim Tesisi<\/strong>&#8216;nin yap\u0131m\u0131 ve \u00dcretim Lisans\u0131 s\u00fcresince i\u015fletilmesi , <strong>%100 oran\u0131nda<\/strong> sahip oldu\u011fumuz Ba\u011fl\u0131 Ortakl\u0131\u011f\u0131m\u0131z<strong> Ayen Ostim Enerji \u00dcretim A.\u015e.<\/strong> taraf\u0131ndan y\u00fcr\u00fct\u00fclecektir.&#8221;<\/p>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ayen Enerji, \u00c7ayp\u0131nar R\u00fczg\u00e2r Enerjisi Elektrik \u00dcretim Tesisi projesine y\u00f6nelik \u00dcretim Lisans\u0131 ald\u0131. \u015eirket&#8217;ten konuya y\u00f6nelik\u00a0Kamu Ayd\u0131nlatma Platformu\u2019na (KAP) yap\u0131lan a\u00e7\u0131klamada \u015fu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":110750,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[69241,69243,69245,69242,69244,53114,52259,69240,35002,53282],"views":301,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110748"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=110748"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110748\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/110750"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=110748"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=110748"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=110748"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}