{"id":110655,"date":"2020-03-23T18:08:54","date_gmt":"2020-03-23T15:08:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=110655"},"modified":"2020-03-23T18:08:54","modified_gmt":"2020-03-23T15:08:54","slug":"enerjisa-tarafindan-planli-kesintiler-ertelendi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerjisa-tarafindan-planli-kesintiler-ertelendi\/","title":{"rendered":"(Turkish) &#8217;Enerjisa&#8217; Taraf\u0131ndan Planl\u0131 Kesintiler Ertelendi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/110655\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Enerjisa elektrik da\u011f\u0131t\u0131m \u015firketleri AYEDA\u015e, Ba\u015fkent EDA\u015e ve Toroslar EDA\u015e faaliyet alanlar\u0131ndaki 14 ilde planl\u0131 kesintilerini erteledi.<\/strong><\/h1>\n<h1><strong><img loading=\"lazy\" class=\"alignright wp-image-110657\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/enerjisa-tarafindan-planli-kesintiler-ertelendi.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/enerjisa-tarafindan-planli-kesintiler-ertelendi.jpg 750w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/enerjisa-tarafindan-planli-kesintiler-ertelendi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/enerjisa-tarafindan-planli-kesintiler-ertelendi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/enerjisa-tarafindan-planli-kesintiler-ertelendi-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h1>\n<p>T\u00fcrkiye\u2019de <strong>3 da\u011f\u0131t\u0131m b\u00f6lgesi<\/strong>ndeki <strong>21 milyonu a\u015fk\u0131n<\/strong> kullan\u0131c\u0131ya elektrik da\u011f\u0131t\u0131m\u0131ndan sorumlu Enerjisa, yeni tip <strong>koronavir\u00fcsle (Covid-19) m\u00fccadele<\/strong>de sorumluluk alarak evlerinde kalan m\u00fc\u015fterilerinin <strong>planl\u0131 elektrik kesintisi ya\u015famamas\u0131<\/strong> amac\u0131yla baz\u0131 \u00e7al\u0131\u015fmalar\u0131na ara verdi.<\/p>\n<p>B\u00f6ylece, <strong>AYEDA\u015e b\u00f6lgesi<\/strong>ndeki <strong>\u0130stanbul Anadolu Yakas\u0131, Ba\u015fkent EDA\u015e b\u00f6lgesi<\/strong>ndeki <strong>Ankara, Zonguldak, Kastamonu, Bart\u0131n, Karab\u00fck, \u00c7ank\u0131r\u0131 ve K\u0131r\u0131kkale<\/strong> ile <strong>Toroslar EDA\u015e<\/strong> b\u00f6lgesindeki <strong>Adana, Mersin, Gaziantep, Hatay, Osmaniye ve Kilis<\/strong>\u2019te ger\u00e7ekle\u015ftirilmesi <strong>planlanan elektrik kesintileri<\/strong> ertelendi.<\/p>\n<p>Sorumluluk bilinciyle evlerinde kalan vatanda\u015flar\u0131n, <strong>elektrik ve elektri\u011fe ba\u011fl\u0131 hizmetleri<\/strong>nin m\u00fcmk\u00fcn oldu\u011funca aksamamas\u0131n\u0131n ama\u00e7land\u0131\u011f\u0131 ve <strong>acil durumlar<\/strong> ile <strong>yeni abone ba\u011flant\u0131lar\u0131<\/strong>na y\u00f6nelik kesintiler d\u0131\u015f\u0131ndaki <strong>planl\u0131 kesintileri<\/strong>n duraklat\u0131laca\u011f\u0131 bu d\u00f6nemde ekiplerimiz, <strong>t\u00fcm \u00f6nleyici tedbirleri alarak<\/strong> olas\u0131 ar\u0131zalar\u0131 <strong>engellemek<\/strong> veya <strong>en k\u0131sa s\u00fcrede gidermek<\/strong> amac\u0131yla <strong>7\/24 sahada<\/strong> olacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerjisa elektrik da\u011f\u0131t\u0131m \u015firketleri AYEDA\u015e, Ba\u015fkent EDA\u015e ve Toroslar EDA\u015e faaliyet alanlar\u0131ndaki 14 ilde planl\u0131 kesintilerini erteledi. T\u00fcrkiye\u2019de 3 da\u011f\u0131t\u0131m b\u00f6lgesindeki 21 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":110657,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[2320,19261,1079,69138,52674,52259,422,69139,3558],"views":134,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110655"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=110655"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110655\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/110657"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=110655"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=110655"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=110655"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}