{"id":110454,"date":"2020-03-19T13:28:27","date_gmt":"2020-03-19T10:28:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=110454"},"modified":"2020-03-19T13:28:27","modified_gmt":"2020-03-19T10:28:27","slug":"turkiyenin-ilk-entegre-gunes-paneli-fabrikasi-15-haziranda-uretime-geciyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyenin-ilk-entegre-gunes-paneli-fabrikasi-15-haziranda-uretime-geciyor\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin \u0130lk Entegre G\u00fcne\u015f Paneli Fabrikas\u0131 15 Haziran\u2019da \u00dcretime Ge\u00e7iyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/110454\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Kalyon G\u00fcne\u015f Teknolojileri \u00dcretim A.\u015e. Genel M\u00fcd\u00fcr\u00fc Ahmet Ta\u015fk\u0131n taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada, T\u00fcrkiye\u2019nin en b\u00fcy\u00fck g\u00fcne\u015f enerjisi santrali projesi olan Konya Karap\u0131nar G\u00fcne\u015f Enerjisi Santrali\u2019nin panellerini \u00fcretmek \u00fczere Ankara\u2019da \u00fcretim fabrikas\u0131 kurduklar\u0131n\u0131 ifade etti.<\/strong><\/h1>\n<p>Fabrikan\u0131n <strong>sadece g\u00fcne\u015f paneli \u00fcretimi<\/strong> <em>ger\u00e7ekle\u015ftirmeyece\u011fine <\/em>vurgu yapan Ta\u015fk\u0131n, <span style=\"text-decoration: underline;\">a\u00e7\u0131klamas\u0131nda:<\/span><\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-110456\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/turkiye-nin-ilk-entegre-gunes-paneli-fabrikasi-15-haziranda-uretime-geciyor.jpg\" alt=\"\" width=\"320\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/turkiye-nin-ilk-entegre-gunes-paneli-fabrikasi-15-haziranda-uretime-geciyor.jpg 534w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/turkiye-nin-ilk-entegre-gunes-paneli-fabrikasi-15-haziranda-uretime-geciyor-300x180.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/turkiye-nin-ilk-entegre-gunes-paneli-fabrikasi-15-haziranda-uretime-geciyor-500x300.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/turkiye-nin-ilk-entegre-gunes-paneli-fabrikasi-15-haziranda-uretime-geciyor-80x48.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>\u201cFabrikam\u0131z, <strong>ingot, wafer, mod\u00fcl ve h\u00fccre \u00fcretimi<\/strong>ni de kapsayacak \u015fekilde <strong>4 birimden<\/strong> olu\u015fan bir kompleks olacak. Fabrikan\u0131n yap\u0131m\u0131 s\u00fcr\u00fcyor. <strong>15 Haziran<\/strong>&#8216;dan itibaren t\u00fcm birimler faaliyete ge\u00e7ecektir. Makinelerin bir k\u0131sm\u0131 geldi ve di\u011fer <strong>k\u0131sm\u0131 yolda<\/strong>, bir k\u0131sm\u0131n\u0131n da <strong>imalat\u0131<\/strong> tamamlan\u0131yor. <strong>15 Haziran\u2019a<\/strong> kadar <strong>t\u00fcm kurulum i\u015flemleri<\/strong> tamamlan\u0131p ilk \u00fcretim yap\u0131lacak. <strong>\u0130lk 3 y\u0131l i\u00e7inde<\/strong>\u00a0\u00fcretimi yap\u0131lacak t\u00fcm <strong>g\u00fcne\u015f panelleri<\/strong> kendimiz i\u00e7in kullanaca\u011f\u0131z. Fabrikam\u0131z\u0131 d\u00fcnyadaki <strong>en \u00fcst teknolojiye uygun<\/strong> olarak hayata ge\u00e7iriyoruz.&#8221; dedi.<\/p>\n<h2><strong>T\u00fcrkiye \u0130lk Entegre Tesisine Kavu\u015fuyor<\/strong><\/h2>\n<p><strong>Ankara Ba\u015fkent Organize Sanayi B\u00f6lgesi<\/strong>\u2019nde in\u015faat\u0131 tamamlanan<strong> 80 bin metrekare<\/strong> kapal\u0131 alana ve <strong>400 milyon dolar yat\u0131r\u0131m<\/strong> de\u011ferine sahip fabrikada, <strong>1300 ki\u015fiyi istihdam<\/strong> edecek.<\/p>\n<p><strong>Silikon i\u015fleme teknolojisi<\/strong>ni T\u00fcrkiye\u2019ye kazand\u0131racak fabrika, faaliyete ge\u00e7ti\u011finde \u201c<strong>ingot, wafer, h\u00fccre ve mod\u00fcl<\/strong>\u201d imalat\u0131n\u0131 <strong>tek \u00e7at\u0131 alt\u0131nda<\/strong> ger\u00e7ekle\u015ftiren <strong>T\u00fcrkiye\u2019nin ilk entegre tesisi<\/strong> olarak faaliyetine ba\u015flayacak.<\/p>\n<p>Y\u0131lda<strong> 500 mw&#8217;l\u0131k<\/strong> \u00fcretim kapasitesine sahip olacak <strong>bu fabrikan\u0131n<\/strong> ilk \u00fcretimleri, <strong>G\u00fcne\u015f YEKA 1 projesi<\/strong> kapsam\u0131nda kurulacak toplam <strong>1000 megavat<\/strong> kurulu g\u00fcce sahip <strong>Konya Karap\u0131nar G\u00fcne\u015f Enerjisi Santrali\u2019nde<\/strong> kullan\u0131lacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Kalyon G\u00fcne\u015f Teknolojileri \u00dcretim A.\u015e. Genel M\u00fcd\u00fcr\u00fc Ahmet Ta\u015fk\u0131n taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada, T\u00fcrkiye\u2019nin en b\u00fcy\u00fck g\u00fcne\u015f enerjisi santrali projesi olan Konya Karap\u0131nar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":110456,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[62914,2674,59580,52259,7440,45942,53157,8255,68904,68908,68903,49307,68906,68900,68910,68901,68905,68909,68902,57125,54979,49308,68907],"views":474,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110454"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=110454"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110454\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/110456"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=110454"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=110454"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=110454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}