{"id":110342,"date":"2020-03-17T14:25:46","date_gmt":"2020-03-17T11:25:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=110342"},"modified":"2020-03-17T14:25:46","modified_gmt":"2020-03-17T11:25:46","slug":"turebten-mucbir-sebep-cagrisi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turebten-mucbir-sebep-cagrisi\/","title":{"rendered":"(Turkish) T\u00dcREB\u2019ten &#8216;M\u00fccbir Sebep&#8217; \u00c7a\u011fr\u0131s\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/110342\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>T\u00fcrkiye R\u00fczgar Enerjisi Birli\u011fi (T\u00dcREB), \u00f6nce \u00c7in, ard\u0131ndan da Avrupa\u2019y\u0131 yo\u011fun bir bi\u00e7imde etkileyen koronavir\u00fcs salg\u0131n\u0131 dolay\u0131s\u0131yla t\u00fcrbin tedarik\u00e7ilerinin imalat taraf\u0131nda ciddi gecikmeler ya\u015famakta olduklar\u0131n\u0131, bunlar\u0131n da t\u00fcrbin teslim s\u00fcrelerini olumsuz etkileyece\u011fini belirtti. T\u00fcrkiye\u2019de bir\u00e7ok r\u00fczgar enerjisi santralinin bu y\u0131l tamamlanmas\u0131n\u0131n riske girece\u011fini belirterek bu durumun \u2018m\u00fccbir sebep\u2019 olarak de\u011ferlendirilmesi ve mevcut YEKDEM mekanizmas\u0131na g\u00f6re en son Aral\u0131k 2020\u2019de devreye girmesi gereken santraller i\u00e7in m\u00fccbir sebep kaynakl\u0131 mevcut gecikmeler g\u00f6z \u00f6n\u00fcnde bulundurularak bu tarihin \u00f6telenmesi y\u00f6n\u00fcnde \u00e7a\u011fr\u0131 yapt\u0131.<\/h1>\n<p>T\u00dcREB Ba\u015fkan\u0131 <strong>Hakan Y\u0131ld\u0131r\u0131m<\/strong>, \u201cT\u00fcm d\u00fcnyay\u0131 etkisine alan koronavir\u00fcs salg\u0131n\u0131n\u0131n \u00fclke ekonomilerini ve dolay\u0131s\u0131 ile pek \u00e7ok sekt\u00f6r\u00fc olumsuz etkiledi\u011fi ortadad\u0131r. \u00d6zellikle r\u00fczgar sekt\u00f6r\u00fcnde k\u00fcresel tedarik zincirinin pek \u00e7ok \u00fclkeye yay\u0131lm\u0131\u015f olmas\u0131 nedeniyle bu zincirin halkalar\u0131ndan birinde <img loading=\"lazy\" class=\"alignright wp-image-110344\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/tureb-ten-mucbir-sebep-cagrisi.jpg\" alt=\"\" width=\"320\" height=\"302\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/tureb-ten-mucbir-sebep-cagrisi.jpg 517w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/tureb-ten-mucbir-sebep-cagrisi-300x283.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/tureb-ten-mucbir-sebep-cagrisi-424x400.jpg 424w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/tureb-ten-mucbir-sebep-cagrisi-53x50.jpg 53w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>veya birka\u00e7\u0131nda meydana gelecek bir t\u0131kanma t\u00fcm sekt\u00f6rdeki tedarik ak\u0131\u015f\u0131n\u0131 etkilemektedir. Avrupal\u0131 t\u00fcrbin sa\u011flay\u0131c\u0131lar \u00e7o\u011funlu\u011fu <strong>Avrupa<\/strong> ve<strong> \u00c7in\u2019de<\/strong> yer alan imalat\u00e7\u0131lara aksam imal ettirmekteler. Bu iki b\u00f6lgede de salg\u0131n sebebi ile ciddi gecikmeler ya\u015fanmakta. Bu da devam eden projelerin yava\u015flamas\u0131na ve hatta durmas\u0131na yol a\u00e7\u0131yor. \u00d6zellikle <strong>YEKDEM s\u00fcresi<\/strong>nin bu y\u0131l sonu itibariyle sona eriyor olmas\u0131 nedeniyle bir\u00e7ok santralin y\u0131l sonundan \u00f6nce devreye girmesini beklerken, ya\u015fanan duraklaman\u0131n projelerin bitimini sekteye u\u011fratma ihtimalini g\u00f6r\u00fcyoruz. Finansman\u0131 YEKDEM\u2019e girecek \u015fekilde tamamlanm\u0131\u015f ve buna g\u00f6re proje \u00e7al\u0131\u015fmalar\u0131na ba\u015flanm\u0131\u015f santrallerin Koronovir\u00fcs\u2019ten kaynaklanan gecikmelerden dolay\u0131 <strong>YEKDEM mekanizmas\u0131<\/strong>na girememe durumunda projelerin finansal yap\u0131lar\u0131 alt\u00fcst olacakt\u0131r. \u00dclkemiz <strong>yenilenebilir enerji ve r\u00fczgar yat\u0131r\u0131mlar\u0131<\/strong>n\u0131n bundan etkilenmemesi ad\u0131na ya\u015fanan bu olay\u0131n \u2018<strong>Lisans Y\u00f6netmeli\u011fi<\/strong>\u2019nde yer alan \u201cm\u00fccbir sebep\u201d olarak kabul edilmesinin hem sekt\u00f6r\u00fcm\u00fcz hem de \u00fclke ekonomisi a\u00e7\u0131s\u0131ndan olumlu bir ad\u0131m olaca\u011f\u0131na inan\u0131yoruz.\u201d<\/p>\n<p>T\u00dcREB Ba\u015fkan\u0131 Y\u0131ld\u0131r\u0131m, halen devam eden <strong>YEKDEM mekanizmas\u0131<\/strong>n\u0131n bitiminden \u00f6nce bu y\u0131l sonunda yakla\u015f\u0131k <strong>1,5 GW<\/strong>\u2019l\u0131k r\u00fczgar enerjisi santralinin devreye girece\u011finin \u00f6ng\u00f6r\u00fcld\u00fc\u011f\u00fcn\u00fc, ancak \u00f6zellikle <strong>\u00c7in ve Avrupa \u00fclkeleri<\/strong>ni beklenmedik derecede olumsuz etkileyen <strong>koronavir\u00fcs salg\u0131n\u0131<\/strong>n\u0131n bu \u00f6ng\u00f6r\u00fcleri zora soktu\u011funu belirtti. Y\u0131ld\u0131r\u0131m, \u201cNormal \u015fartlarda <strong>2016\u2019da<\/strong> oldu\u011fu gibi <strong>1.500 MW<\/strong>\u2019a yak\u0131n bir kurulumun tamamlanmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyordu, ancak salg\u0131n t\u00fcm \u00f6ng\u00f6r\u00fcleri de\u011fi\u015ftirdi. Ekonomiler bundan \u00e7ok a\u011f\u0131r etkilenmekte, elbette <strong>tedarik zinciri<\/strong>nde de ciddi sorunlar ortaya \u00e7\u0131k\u0131yor. <strong>Pandemi (d\u00fcnya \u00e7ap\u0131nda salg\u0131n)<\/strong> olarak ilan edilen bir durum m\u00fccbir sebeptir.<\/p>\n<p>H\u00fck\u00fcmetimizin, ekonomimizin g\u00fcvende olmas\u0131 a\u00e7\u0131s\u0131ndan \u00f6nemli kararlar i\u00e7eren bir <strong>yol haritas\u0131<\/strong> haz\u0131rlad\u0131\u011f\u0131n\u0131 izlemekteyiz. <strong>R\u00fczgar sekt\u00f6r\u00fc<\/strong>nde de al\u0131nacak <strong>\u2018m\u00fccbir sebep\u2019<\/strong> karar\u0131n\u0131n yat\u0131r\u0131mc\u0131lar\u0131n, finans sa\u011flay\u0131c\u0131lar\u0131n ve imalat\u00e7\u0131lar\u0131n ciddi boyutta artan \u2018<strong>YEKDEM<\/strong>\u2019e girememe\u2019 risklerini azaltaca\u011f\u0131na ve dolay\u0131s\u0131 ile \u00fclkemizin <strong>yenilenebilir enerji hedefleri<\/strong>nin tutturulmas\u0131na gereken olumlu etkiyi yapaca\u011f\u0131na inan\u0131yorum\u201d \u015feklinde konu\u015ftu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye R\u00fczgar Enerjisi Birli\u011fi (T\u00dcREB), \u00f6nce \u00c7in, ard\u0131ndan da Avrupa\u2019y\u0131 yo\u011fun bir bi\u00e7imde etkileyen koronavir\u00fcs salg\u0131n\u0131 dolay\u0131s\u0131yla t\u00fcrbin tedarik\u00e7ilerinin imalat taraf\u0131nda ciddi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":110344,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[1964,886,52259,66104,2080,35002,35004,53282,68815,68813,57618,3390,29410,68814],"views":114,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110342"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=110342"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110342\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/110344"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=110342"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=110342"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=110342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}