{"id":110090,"date":"2020-03-13T01:53:02","date_gmt":"2020-03-12T22:53:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=110090"},"modified":"2020-03-13T01:53:54","modified_gmt":"2020-03-12T22:53:54","slug":"orkoy-pv-ihalesine-son-basvuru-tarihi-17-mart-2020ye-uzatildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/orkoy-pv-ihalesine-son-basvuru-tarihi-17-mart-2020ye-uzatildi\/","title":{"rendered":"(Turkish) ORK\u00d6Y PV \u0130halesine Son Ba\u015fvuru Tarihi 17 Mart 2020\u2019ye Uzat\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/110090\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>ORK\u00d6Y PV Projesinin 2&#8217;inci \u00c7at\u0131 Tipi PV ihalesinde teklif verme s\u00fcresi 17 Mart 2020 saat 23:59\u2019a (New York saati) uzat\u0131ld\u0131.<\/strong><\/h1>\n<p>&nbsp;<\/p>\n<h1><strong>Birle\u015fmi\u015f Milletler Kalk\u0131nma Program\u0131 (UNDP) T\u00fcrkiye \u00dclke Ofisi, Orman K\u00f6ylerinde G\u00fcne\u015f Enerjisinden Elektrik \u00dcretimi \u0130\u00e7in S\u00fcrd\u00fcr\u00fclebilir Enerji Finans Mekanizmas\u0131 (ORK\u00d6Y PV) Projesi kapsam\u0131nda 18 ilde kurulacak olan 225 pilot tesisin 2&#8217;inci \u00c7at\u0131 Tipi PV Sistemi ihale dok\u00fcmanlar\u0131n\u0131 yay\u0131nlad\u0131.<\/strong><\/h1>\n<p style=\"text-align: right;\">*\u0130hale duyurusunun yap\u0131ld\u0131\u011f\u0131 ilk tarih: <strong>14 \u015eubat 2020<\/strong><\/p>\n<p><strong>Birle\u015fmi\u015f Milletler Kalk\u0131nma Program\u0131 (UNDP)<\/strong> <strong>T\u00fcrkiye \u00dclke Ofisi<\/strong>, <em>Orman K\u00f6ylerinde G\u00fcne\u015f Enerjisinden Elektrik \u00dcretimi \u0130\u00e7in S\u00fcrd\u00fcr\u00fclebilir Enerji Finans Mekanizmas\u0131 (ORK\u00d6Y PV) Projesi<\/em> <img loading=\"lazy\" class=\"alignright wp-image-110093\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/orkoy-pv-ihalesine-son-basvuru-tarihi-17-mart-2020ye-uzatildi.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/orkoy-pv-ihalesine-son-basvuru-tarihi-17-mart-2020ye-uzatildi.jpg 800w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/orkoy-pv-ihalesine-son-basvuru-tarihi-17-mart-2020ye-uzatildi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/orkoy-pv-ihalesine-son-basvuru-tarihi-17-mart-2020ye-uzatildi-768x576.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/orkoy-pv-ihalesine-son-basvuru-tarihi-17-mart-2020ye-uzatildi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/orkoy-pv-ihalesine-son-basvuru-tarihi-17-mart-2020ye-uzatildi-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>kapsam\u0131nda T\u00fcrkiye\u2019nin her b\u00f6lgesinde<strong> g\u00fcne\u015fsiz \u00e7at\u0131 kalmamas\u0131 hedefiyle<\/strong> ihaleye \u00e7\u0131k\u0131ld\u0131.<\/p>\n<p>T\u00fcrkiye\u2019de <strong>mevzuat y\u00f6n\u00fcyle \u00e7at\u0131 pazar\u0131n\u0131n<\/strong> a\u00e7\u0131lmas\u0131yla birlikte geli\u015fmeye ba\u015flayan <strong>\u00e7at\u0131 pazar\u0131 ORK\u00d6Y PV projesi<\/strong> ile daha da tan\u0131nacak. 18 ilde toplam <strong>225 \u00e7at\u0131ya<\/strong> kurulacak olan \u00e7at\u0131 GES\u2019lerin T\u00fcrkiye\u2019de <strong>\u00c7at\u0131 PV sekt\u00f6r\u00fcn\u00fcn de<\/strong> \u00f6n\u00fcn\u00fc a\u00e7aca\u011f\u0131 d\u00fc\u015f\u00fcn\u00fclmektedir. Siz de\u011ferli sekt\u00f6r payda\u015flar\u0131m\u0131z\u0131n bu ihaleye kat\u0131l\u0131mlar\u0131 <strong>sekt\u00f6r\u00fcn geli\u015fmesi i\u00e7in<\/strong> de\u011ferli olaca\u011f\u0131n\u0131 d\u00fc\u015f\u00fcnmekteyiz.<\/p>\n<p><strong>Orman Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc (OGM)<\/strong> taraf\u0131ndan, <strong>K\u00fcresel \u00c7evre Fonu (GEF)<\/strong> finansal deste\u011fiyle, <strong>Birle\u015fmi\u015f Milletler Kalk\u0131nma Program\u0131 (UNDP)<\/strong> i\u015fbirli\u011finde ve <strong>G\u00dcNDER proje ortakl\u0131\u011f\u0131<\/strong>nda y\u00fcr\u00fct\u00fclmekte olan, <strong>ORK\u00d6Y PV Projesi<\/strong> kapsam\u0131ndaki 18 il ve detaylar\u0131na\u00a0<a href=\"https:\/\/procurement-notices.undp.org\/view_notice.cfm?notice_id=63372\" target=\"_blank\" rel=\"noopener\"><strong>buradan\u00a0<\/strong><\/a>ula\u015fabilirsiniz.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-110091\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/UNDP-\u00c7at\u0131-GES-tablo.jpg\" alt=\"\" width=\"662\" height=\"519\" \/><\/p>\n<p><strong>T\u00fcrkiye\u2019deki Orman K\u00f6ylerinde G\u00fcne\u015f Enerjisinden Elektrik \u00dcretimi \u0130\u00e7in S\u00fcrd\u00fcr\u00fclebilir Enerji Finans Mekanizmas\u0131 (ORK\u00d6Y PV) kapsam\u0131ndaki ihaleye ili\u015fkin ayr\u0131nt\u0131l\u0131 bilgiye\u00a0<a href=\"https:\/\/procurement-notices.undp.org\/view_notice.cfm?notice_id=63372\" target=\"_blank\" rel=\"noopener\">buradan\u00a0<\/a>ula\u015fabilirsiniz.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ORK\u00d6Y PV Projesinin 2&#8217;inci \u00c7at\u0131 Tipi PV ihalesinde teklif verme s\u00fcresi 17 Mart 2020 saat 23:59\u2019a (New York saati) uzat\u0131ld\u0131. &nbsp; Birle\u015fmi\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":110093,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[68583,68582,67754,55424,68581,52259,53157,38941,50910,56656,54979],"views":137,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110090"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=110090"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/110090\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/110093"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=110090"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=110090"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=110090"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}