{"id":109783,"date":"2020-03-07T19:51:43","date_gmt":"2020-03-07T16:51:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=109783"},"modified":"2020-03-07T19:55:37","modified_gmt":"2020-03-07T16:55:37","slug":"naturel-enerji-ges-lerin-yapimi-icin-balsuyu-sirketler-grubu-ile-anlasti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/naturel-enerji-ges-lerin-yapimi-icin-balsuyu-sirketler-grubu-ile-anlasti\/","title":{"rendered":"(Turkish) &#8217;Naturel Enerji&#8217; GES\u2019lerin Yap\u0131m\u0131 \u0130\u00e7in Balsuyu \u015eirketler Grubu ile Anla\u015ft\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/109783\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Naturel Yenilenebilir Enerji taraf\u0131ndan G\u00fcne\u015f Enerji Santralleri m\u00fcteahhitlik faaliyetleri \u00e7er\u00e7evesinde Balsuyu \u015eirketler <img loading=\"lazy\" class=\"alignright wp-image-109785\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/naturel-enerji-ges-lerin-yapimi-icin-balsuyu-sirketler-grubu-ile-anlasti.jpg\" alt=\"\" width=\"320\" height=\"170\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/naturel-enerji-ges-lerin-yapimi-icin-balsuyu-sirketler-grubu-ile-anlasti.jpg 919w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/naturel-enerji-ges-lerin-yapimi-icin-balsuyu-sirketler-grubu-ile-anlasti-300x159.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/naturel-enerji-ges-lerin-yapimi-icin-balsuyu-sirketler-grubu-ile-anlasti-768x408.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/naturel-enerji-ges-lerin-yapimi-icin-balsuyu-sirketler-grubu-ile-anlasti-500x266.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/03\/naturel-enerji-ges-lerin-yapimi-icin-balsuyu-sirketler-grubu-ile-anlasti-80x42.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Grubu ile s\u00f6zle\u015fme imzaland\u0131.<\/h1>\n<p><strong>Naturel Yenilenebilir Enerji<\/strong>\u2019den konuya y\u00f6nelik <strong>Kamuyu Ayd\u0131nlatma Platformu\u2019na (KAP)<\/strong> yap\u0131lan a\u00e7\u0131klamada &#8220;\u015eirketimiz, <strong>G\u00fcne\u015f Enerji Santralleri<\/strong> m\u00fcteahhitlik\u00a0faaliyetleri kapsam\u0131nda, <strong>Balsuyu \u015eirketler Grubu<\/strong> ile T\u00fcrkiye&#8217;nin en b\u00fcy\u00fck <strong>\u00c7at\u0131 G\u00fcne\u015f Santralinin<\/strong> <em>anahtar teslim yap\u0131m\u0131na<\/em> y\u00f6nelik s\u00f6zle\u015fme imzalam\u0131\u015ft\u0131r.<\/p>\n<p><strong>Kahramanmara\u015f&#8217;ta<\/strong> hayata ge\u00e7irilecek d\u00fcnyan\u0131n en b\u00fcy\u00fck <strong>\u00c7at\u0131 \u00dcst\u00fc G\u00fcne\u015f Enerjisi Kurulumlar\u0131<\/strong>\u00a0aras\u0131nda yer alacak bu <strong>ges projesi<\/strong> toplam da <strong>11.4 MW<\/strong> g\u00fcce sahip olacakt\u0131r. S\u00f6zle\u015fme deki yat\u0131r\u0131m bedelinin <em>KDV dahil<\/em> <strong>35.945.663,60<\/strong> T\u00fcrk Liras\u0131d\u0131r. (<strong>5.902.020,16<\/strong> Amerikan Dolar\u0131).&#8221; ifadeleri kullan\u0131ld\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Naturel Yenilenebilir Enerji taraf\u0131ndan G\u00fcne\u015f Enerji Santralleri m\u00fcteahhitlik faaliyetleri \u00e7er\u00e7evesinde Balsuyu \u015eirketler Grubu ile s\u00f6zle\u015fme imzaland\u0131. Naturel Yenilenebilir Enerji\u2019den konuya y\u00f6nelik Kamuyu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":109785,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[68283,37412,52674,52259,7440,53901,944,21768,53157,60520,54434],"views":238,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/109783"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=109783"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/109783\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/109785"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=109783"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=109783"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=109783"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}