{"id":108993,"date":"2020-02-23T16:12:23","date_gmt":"2020-02-23T13:12:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=108993"},"modified":"2020-02-23T16:14:13","modified_gmt":"2020-02-23T13:14:13","slug":"eyoder-in-proje-degerlendirme-ve-kapanis-calistayi-24-subat-ankara-da","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eyoder-in-proje-degerlendirme-ve-kapanis-calistayi-24-subat-ankara-da\/","title":{"rendered":"(Turkish) EYODER&#8217;in Proje Kapan\u0131\u015f \u00c7al\u0131\u015ftay\u0131 24 \u015eubat Ankara&#8217;da Yap\u0131lacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/108993\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Avrupa Birli\u011fi ve T\u00fcrkiye Cumhuriyeti taraf\u0131ndan Kat\u0131l\u0131m \u00d6ncesi Yard\u0131m Arac\u0131 (IPA-II) 2014 program\u0131 \u00e7er\u00e7evesinde y\u00fcr\u00fct\u00fclen YEREL STK\u2019LAR H\u0130BE PROGRAMI kapsam\u0131nda Enerji Verimlili\u011fi ve Y\u00f6netimi Derne\u011fi (EYODER) taraf\u0131ndan y\u00fcr\u00fct\u00fclmekte olan \u201cEnerji Verimlili\u011fi Payda\u015flar\u0131 Aras\u0131nda \u0130leti\u015fim ve Veri Payla\u015f\u0131m A\u011f\u0131n\u0131n Geli\u015ftirilmesi\u201d projesinin kapan\u0131\u015f \u00e7al\u0131\u015ftay\u0131 Ankara&#8217;da d\u00fczenlenecektir.<img loading=\"lazy\" class=\"alignright wp-image-108995\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/eyoder-in-proje-degerlendirme-ve-kapanis-calistayi-24-subat-ankara-da.jpg\" alt=\"\" width=\"320\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/eyoder-in-proje-degerlendirme-ve-kapanis-calistayi-24-subat-ankara-da.jpg 488w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/eyoder-in-proje-degerlendirme-ve-kapanis-calistayi-24-subat-ankara-da-300x185.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/eyoder-in-proje-degerlendirme-ve-kapanis-calistayi-24-subat-ankara-da-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/h1>\n<p>Proje kapsam\u0131nda <strong>\u0130T\u00dc-NOVA<\/strong> i\u015f birli\u011fi ile haz\u0131rlanm\u0131\u015f olan\u00a0<strong>\u201cEnerji T\u00fcketim G\u00f6stergeleri ve Verimlilik Potansiyeli Analiz Raporu\u201d<\/strong>\u00a0ile\u00a0<strong>\u201cEnerji Verimlili\u011fi \u00d6neri Raporu\u201dnun<\/strong>\u00a0kamuyla payla\u015f\u0131m\u0131ndan \u00f6nce tart\u0131\u015f\u0131lmas\u0131, yine proje kapsam\u0131nda haz\u0131rlanm\u0131\u015f olan\u00a0<strong>\u201cEnerji Verimlili\u011fi Payda\u015f Platformu ve Veri Taban\u0131n\u0131n\u201d<\/strong>\u00a0de\u011ferlendirilmesi ve proje \u00e7\u0131kt\u0131lar\u0131n\u0131n payla\u015f\u0131lmas\u0131 planlanmaktad\u0131r.<\/p>\n<p><strong>24 \u015eubat 2020 tarihinde Ankara\u2019da<\/strong>\u00a0d\u00fczenlenecektir.\u00a0<strong>\u201cProje De\u011ferlendirme ve Kapan\u0131\u015f \u00c7al\u0131\u015ftay\u0131na\u201d<\/strong>\u00a0<em>EYODER ailesi<\/em> siz de\u011ferli sekt\u00f6r payda\u015flar\u0131n\u0131n te\u015friflerini bekler&#8230;<\/p>\n<table width=\"635\">\n<tbody>\n<tr>\n<td><strong>Tarih:\u00a024 \u015eubat 2020, Pazartesi<\/strong><\/p>\n<p><strong>Saat:\u00a009:30-17:00<\/strong><\/p>\n<p><strong>Yer:\u00a0Midi Hotel &#8211; \u00c7ankaya, ANKARA<\/strong><\/p>\n<p><strong>LCV: <\/strong>L\u00fctfen kat\u0131l\u0131m durumunuzu <strong>22 \u015eubat 2020<\/strong> tarihine kadar<strong><a href=\"mailto:eyoder.etkinlik@gmail.com\">eyoder.etkinlik@gmail.com<\/a><\/strong>\u2019a veya <strong>0532 396 33 70<\/strong>\u2019e bildiriniz.<\/p>\n<p><strong>\u00a0<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/eyoder-in-proje-degerlendirme-ve-kapanis-calistayi-24-subat-ankara-da.pdf\" target=\"_blank\" rel=\"noopener\">\u00c7al\u0131\u015ftay Program\u0131 Detay\u0131 \u0130\u00e7in TIKLAYIN &gt;&gt;&gt;<\/a><\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Avrupa Birli\u011fi ve T\u00fcrkiye Cumhuriyeti taraf\u0131ndan Kat\u0131l\u0131m \u00d6ncesi Yard\u0131m Arac\u0131 (IPA-II) 2014 program\u0131 \u00e7er\u00e7evesinde y\u00fcr\u00fct\u00fclen YEREL STK\u2019LAR H\u0130BE PROGRAMI kapsam\u0131nda Enerji Verimlili\u011fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":108995,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,52],"tags":[2674,67473,52259,67476,67474,58103,55433,67475,46878],"views":261,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/108993"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=108993"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/108993\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/108995"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=108993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=108993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=108993"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}