{"id":108650,"date":"2020-02-18T01:16:56","date_gmt":"2020-02-17T22:16:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=108650"},"modified":"2020-02-18T01:16:56","modified_gmt":"2020-02-17T22:16:56","slug":"total-ve-powertis-ispanyada-950-mw-guce-sahip-ges-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/total-ve-powertis-ispanyada-950-mw-guce-sahip-ges-kuracak\/","title":{"rendered":"(Turkish) &#8217;Total ve Powertis&#8217; \u0130spanya\u2019da 950 MW G\u00fcce Sahip GES Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/108650\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Frans\u0131z enerji \u015firketi Total ve \u0130spanyol Powertis taraf\u0131ndan \u0130spanya&#8217;da toplamda 950 MW kapasiteli g\u00fcne\u015f projesi hayata <img loading=\"lazy\" class=\"alignright wp-image-108652\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/total-ve-powertis-ispanyada-950-mw-guce-sahip-ges-kuracak.jpg\" alt=\"\" width=\"320\" height=\"218\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/total-ve-powertis-ispanyada-950-mw-guce-sahip-ges-kuracak.jpg 715w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/total-ve-powertis-ispanyada-950-mw-guce-sahip-ges-kuracak-300x205.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/total-ve-powertis-ispanyada-950-mw-guce-sahip-ges-kuracak-500x341.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/total-ve-powertis-ispanyada-950-mw-guce-sahip-ges-kuracak-73x50.jpg 73w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ge\u00e7irilecek.<\/strong><\/h1>\n<p>Madrid merkezli g\u00fcne\u015f enerjisi geli\u015ftiricisi <strong>Powertis SA<\/strong>, Frans\u0131z enerji grubu <strong>Total<\/strong> ile <strong>\u0130spanya<\/strong>&#8216;da yakla\u015f\u0131k <strong>1 GW<\/strong> de\u011ferinde <strong>g\u00fcne\u015f enerjisi projesini<\/strong> kapsayan bir <strong>ortak geli\u015ftirme anla\u015fmas\u0131<\/strong> ve <strong>elektrik sat\u0131n al\u0131m anla\u015fmas\u0131 (PPA)<\/strong> imzalad\u0131.<\/p>\n<p><strong>Total&#8217;in<\/strong> \u015eubat <strong>2021&#8217;e kadar geli\u015ftirdi\u011fi<\/strong> g\u00fcne\u015f enerjisi projelerinden <strong>sat\u0131n alma hakk\u0131n\u0131 elde etti\u011fi<\/strong> bir <strong>ortak giri\u015fim (JV)<\/strong> kurduklar\u0131 a\u00e7\u0131klan\u0131rken <strong>Powertis<\/strong>\u2019in <strong>\u0130spanya\u2019n\u0131n<\/strong> \u00e7e\u015fitli b\u00f6lgelerde ve a\u015famalarda toplamda\u00a0<strong>950 MW kapasitede<\/strong> <em>g\u00fcne\u015f projeleri<\/em> bulunuyor. Bu projelerin geli\u015ftirilmesine y\u00f6nelik ise <strong>767,5 milyon dolar yat\u0131r\u0131ma<\/strong> ihtiya\u00e7 duyuluyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Frans\u0131z enerji \u015firketi Total ve \u0130spanyol Powertis taraf\u0131ndan \u0130spanya&#8217;da toplamda 950 MW kapasiteli g\u00fcne\u015f projesi hayata ge\u00e7irilecek. Madrid merkezli g\u00fcne\u015f enerjisi geli\u015ftiricisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":108652,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5070,67198,10438,7781,4353,67201,67200,67199,1847,56304],"views":190,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/108650"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=108650"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/108650\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/108652"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=108650"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=108650"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=108650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}