{"id":108407,"date":"2020-02-13T17:45:45","date_gmt":"2020-02-13T14:45:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=108407"},"modified":"2020-02-13T17:45:45","modified_gmt":"2020-02-13T14:45:45","slug":"2020-yilinda-kamu-1186-milyar-liralik-enerji-yatirimi-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2020-yilinda-kamu-1186-milyar-liralik-enerji-yatirimi-yapacak\/","title":{"rendered":"(Turkish) 2020 Y\u0131l\u0131nda Kamu 11,86 Milyar Lira&#8217;l\u0131k Enerji Yat\u0131r\u0131m\u0131 Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/108407\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>2020 Yat\u0131r\u0131m Program\u0131n\u0131n Kabul\u00fc ve Uygulanmas\u0131na Dair Karar, 2114 say\u0131l\u0131 Cumhurba\u015fkanl\u0131\u011f\u0131 Karar\u0131 ile y\u00fcr\u00fcrl\u00fc\u011fe girdi. Bu \u00e7er\u00e7evede\u00a0<strong>2020&#8217;de<\/strong> enerji sekt\u00f6r\u00fcne ili\u015fkin <strong>118 projede<\/strong>, kamu yat\u0131r\u0131m\u0131 harcamalar\u0131 <strong>11.864.480.000 TL<\/strong> olurken 2020 y\u0131l\u0131nda madencilik sekt\u00f6r\u00fcne ili\u015fkin <strong>45 projedeki<\/strong> kamu yat\u0131r\u0131m harcamalar\u0131 ise <strong>3.535.921.000 TL<\/strong>&#8216;yi bulacak.<\/h1>\n<h2><strong>Yat\u0131r\u0131m Tutar\u0131n\u0131n Kurulu\u015flara G\u00f6re Da\u011f\u0131l\u0131m\u0131<\/strong><\/h2>\n<p>2020\u2019de enerji sekt\u00f6r\u00fcnde ger\u00e7ekle\u015ftirilecek olan toplam 11.864.480.000 TL\u2019lik kamu yat\u0131r\u0131m\u0131n\u0131n kurulu\u015flara g\u00f6re da\u011f\u0131l\u0131m\u0131 ise; proje say\u0131s\u0131 ve y\u0131ll\u0131k yat\u0131r\u0131m tutar\u0131 olarak a\u015fa\u011f\u0131daki gibi olacak.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-108409\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/2020-yilinda-kamu-1186-milyar-liralik-enerji-yatirimi-yapacak.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/2020-yilinda-kamu-1186-milyar-liralik-enerji-yatirimi-yapacak.jpg 750w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/2020-yilinda-kamu-1186-milyar-liralik-enerji-yatirimi-yapacak-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/2020-yilinda-kamu-1186-milyar-liralik-enerji-yatirimi-yapacak-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/2020-yilinda-kamu-1186-milyar-liralik-enerji-yatirimi-yapacak-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Ankara Do\u011fal Elektrik \u00dcretim ve Ticaret A\u015e (AD\u00dcA\u015e):<\/strong> 1 proje; 54.000 TL<br \/>\n<strong>Boru Hatlar\u0131yla Petrol Ta\u015f\u0131ma A\u015e (BOTA\u015e):<\/strong> 15 proje; 5.000.000.000 TL<br \/>\n<strong>\u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131:<\/strong> 2 proje; 683.000 TL<br \/>\n<strong>Devlet Su \u0130\u015fleri (DS\u0130):<\/strong> 11 proje; 1.222.100.000 TL<br \/>\n<strong>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131:<\/strong> 10 proje; 45.684.000 TL<br \/>\n<strong>Elektrik \u00fcretim A\u015e (E\u00dcA\u015e):<\/strong> 16 proje; 1.001.271.000 TL<br \/>\n<strong>G\u00fcneydo\u011fu Anadolu Projesi B\u00f6lge Kalk\u0131nma \u0130daresi:<\/strong> 1 proje; 1.367.000 TL<br \/>\n<strong>Konya Ovas\u0131 Projesi B\u00f6lge Kalk\u0131nma \u0130daresi:<\/strong> 1 proje; 1.764.000 TL<br \/>\n<strong>Karayollar\u0131 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc:<\/strong> 3 proje; 53.305.000 TL<br \/>\n<strong>T\u00fcrkiye Atom Enerjisi Kurumu (TAEK):<\/strong> 4 proje; 38.252.000 TL<br \/>\n<strong>T\u00fcrkiye Elektrik Da\u011f\u0131t\u0131m A\u015e (TEDA\u015e):<\/strong> 7 proje; 500.000.000 TL<br \/>\n<strong>T\u00fcrkiye Elektrik \u0130letim A\u015e (TE\u0130A\u015e):<\/strong> 42 proje; 4.000.000.000 TL<\/p>\n<p>Madencilik sekt\u00f6r\u00fcnde 2020&#8217;de yap\u0131lacak kamu yat\u0131r\u0131mlar\u0131 tutar\u0131\u00a0<strong>3.535.921.000 TL<\/strong> olurken bu tutar\u0131n kurulu\u015flara g\u00f6re da\u011f\u0131l\u0131m\u0131 da <strong>proje say\u0131s\u0131<\/strong> ve <strong>y\u0131ll\u0131k yat\u0131r\u0131m tutar\u0131<\/strong> olarak, <span style=\"text-decoration: underline;\">\u015f\u00f6yle olacak;<\/span><\/p>\n<p><strong>Eti Maden \u0130\u015fletmeleri:<\/strong> 10 proje; 250.000.000 TL<br \/>\n<strong>Elektrik \u00dcretim A\u015e (E\u00dcA\u015e):<\/strong> 8 proje; 190.000.000 TL<br \/>\n<strong>Maden ve Petrol \u0130\u015fleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc:<\/strong> 1 proje; 11.835.000 TL<br \/>\n<strong>Maden Tetkik ve Arama Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc:<\/strong> 6 proje; 315.494.000 TL<br \/>\n<strong>T\u00fcrkiye Ta\u015fk\u00f6m\u00fcr\u00fc Kurumu:<\/strong> 6 proje; 143.840.000 TL<br \/>\n<strong>T\u00fcrkiye K\u00f6m\u00fcr \u0130\u015fletmeleri:<\/strong> 5 proje; 90.000.000 TL<br \/>\n<strong>T\u00fcrkiye Petrolleri AO:<\/strong> 9 proje; 2.534.752.000 TL<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2020 Yat\u0131r\u0131m Program\u0131n\u0131n Kabul\u00fc ve Uygulanmas\u0131na Dair Karar, 2114 say\u0131l\u0131 Cumhurba\u015fkanl\u0131\u011f\u0131 Karar\u0131 ile y\u00fcr\u00fcrl\u00fc\u011fe girdi. Bu \u00e7er\u00e7evede\u00a02020&#8217;de enerji sekt\u00f6r\u00fcne ili\u015fkin 118 projede, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":108409,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[66982,66981,61204,53114,5070,52259,46180,18969,66980,53315],"views":246,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/108407"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=108407"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/108407\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/108409"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=108407"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=108407"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=108407"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}