{"id":108210,"date":"2020-02-11T11:59:17","date_gmt":"2020-02-11T08:59:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=108210"},"modified":"2020-02-11T12:07:26","modified_gmt":"2020-02-11T09:07:26","slug":"turk-firmalari-nukleer-santraller-fuarinda-bulusacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak\/","title":{"rendered":"(Turkish) T\u00fcrk Firmalar\u0131 N\u00fckleer Santraller Fuar\u0131\u2019nda Bulu\u015facak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/108210\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>T\u00fcrk firmalar\u0131n\u0131 Akkuyu N\u00fc<\/strong><strong>kleer G<\/strong><strong>\u00fc\u00e7 <\/strong><strong>Santrali<\/strong><strong>\u2019<\/strong><strong>nin in\u015f<\/strong><strong>aat<\/strong><strong>\u0131nda bir\u00e7ok i\u015f f\u0131rsat\u0131 bekliyor. N\u00fc<\/strong><strong>kleer M<\/strong><strong>\u00fchendisler Derne\u011fi<\/strong><strong>\u2019<\/strong><strong>ne g<\/strong><strong>\u00f6<\/strong><strong>re; Akkuyu<\/strong><strong>\u2019<\/strong><strong>nun in\u015f<\/strong><strong>aat<\/strong><strong>\u0131nda kullan\u0131lmas\u0131 \u00f6ng<\/strong><strong>\u00f6<\/strong><strong>r\u00fclen 2,3 milyon metrek\u00fcp beton, 12 bin 300 vana ve 21 bin kilometre kablo i\u00e7in ihaleler a\u00e7\u0131lacak. T\u00fcrk firmalar\u0131 i\u00e7<\/strong><strong>in do<\/strong><strong>\u011facak bu i\u015f birli\u011fi f\u0131rsatlar\u0131, n\u00fckleer enerji sekt<\/strong><strong>\u00f6<\/strong><strong>r\u00fcn\u00fcn devlerini bu y\u0131l 7&#8217;inci defa \u0130stanbul<\/strong>\u2019<strong>da bulu\u015fturmaya haz\u0131rlanan N\u00fckleer Santraller Fuar\u0131 ve Zirvesi<\/strong>\u2019<strong>nde tart\u0131\u015f\u0131lacak.<\/strong><\/h1>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-108213\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-1.jpg\" alt=\"\" width=\"320\" height=\"427\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-1.jpg 366w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-1-225x300.jpg 225w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-1-300x400.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-1-38x50.jpg 38w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131<\/strong> ve <strong>T\u00fcrkiye Atom Enerjisi Kurumu<\/strong>\u2019nun destekleriyle <strong>N\u00fckleer M\u00fchendisler Derne\u011fi (NMD)<\/strong> taraf\u0131ndan <strong>Ankara Sanayi Odas\u0131 (ASO)<\/strong> ile birlikte d\u00fczenlenen <strong>3&#8217;\u00fcnc\u00fc N\u00fckleer Santraller Fuar\u0131<\/strong> ve <strong>7&#8217;inci N\u00fckleer Santraller Zirvesi (NPPES)<\/strong>, <strong>4-5 Mart 2020\u2019de<\/strong> T\u00fcrk firmalar\u0131n\u0131 <strong>n\u00fckleer enerji sekt\u00f6r\u00fcnde<\/strong> bekleyen <strong>i\u015f imkanlar\u0131yla<\/strong> bulu\u015fturacak.<\/p>\n<h2><strong>Akkuyu<\/strong>\u2019<strong>nun<\/strong><strong> in\u015f<\/strong><strong>aat i<\/strong><strong>\u015flerinin yakla\u015f\u0131k % 40\u2019\u0131n\u0131 T\u00fcrk firmalar\u0131 yapabilir<\/strong><\/h2>\n<p>Yap\u0131m maliyetinin <strong>20 milyar dolar olmas\u0131<\/strong> beklenen <strong>Akkuyu NGS\u2019nin<\/strong> yakla\u015f\u0131k <strong>% 40\u2019\u0131n\u0131n<\/strong> T\u00fcrk \u00fcretici ve tedarik\u00e7ilerden kar\u015f\u0131lanmas\u0131n\u0131n hedeflendi\u011fini a\u00e7\u0131klayan <strong>N\u00fc<\/strong><strong>kleer M<\/strong><strong>\u00fchendisler Derne\u011fi Y<\/strong><strong>\u00f6<\/strong><strong>netim Kurulu <\/strong><strong>\u00dc<\/strong><strong>yesi N\u00fckleer Enerji Y\u00fcksek M\u00fchendisi Korcan Kayr\u0131n<\/strong>, T\u00fcrk firmalar\u0131n\u0131n n\u00fckleer sanayiye girmesinin \u00f6n\u00fcndeki tek engelin, bu <strong>y\u00fcksek katma de\u011ferli sekt\u00f6r hakk\u0131ndaki<\/strong> bilgi eksikli\u011fi oldu\u011funu belirtti. Kayr\u0131n, sanayicilerin <strong>global n\u00fckleer pazar\u0131n\u0131n<\/strong> bir oyuncusu olabilmelerini te\u015fvik etmek amac\u0131ya yedi y\u0131ld\u0131r d\u00fczenledikleri <strong>NPPES<\/strong>\u2019te bu y\u0131l da <strong>Akkuyu NGS<\/strong>\u2019deki i\u015f f\u0131rsatlar\u0131yla ilgili <strong>\u00f6zel oturumlar<\/strong> yap\u0131laca\u011f\u0131n\u0131 s\u00f6yledi. Kayr\u0131n, <strong>2 y\u0131ld\u0131r<\/strong> organizasyonu birlikte ger\u00e7ekle\u015ftirdikleri <strong>Ankara Sanayi Odas\u0131<\/strong>\u2019n\u0131n da 2015 <strong>y\u0131l\u0131ndan bu yana<\/strong> \u00f6nce <strong>N\u00fckleer Urge<\/strong>, ard\u0131ndan <strong>N\u00fckleer Sanayi K\u00fcmelenmesi N\u00dcKSAK<\/strong>\u2019la yerli \u00fcreticilerin <strong>n\u00fckleer kabiliyetlerini geli\u015ftirme<\/strong> \u00e7abalar\u0131yla s\u00fcrece \u00e7ok \u00f6nemli katk\u0131lar sa\u011flad\u0131\u011f\u0131n\u0131 vurgulad\u0131. Kayr\u0131n, <strong>NPPES\u2019i<\/strong> tedarik\u00e7ilerle al\u0131c\u0131lar\u0131n bulu\u015faca\u011f\u0131 \u00f6nemli bir <strong>ticari platforma d\u00f6n\u00fc\u015ft\u00fcrmeyi<\/strong> hedeflediklerini de s\u00f6zlerine ekledi.<\/p>\n<h2><strong>Akkuyu<\/strong>\u2019<strong>da 21 bin kilometre kablo kullan\u0131lacak<\/strong><\/h2>\n<p>Kayr\u0131n, <strong>NMD<\/strong> olarak <strong>Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali<\/strong>\u2019nin in\u015faat\u0131nda yakla\u015f\u0131k; <strong>2,3 milyon metrek\u00fcp<\/strong> <img loading=\"lazy\" class=\"alignleft wp-image-108214\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-2-1024x682.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-2-1024x682.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-2-768x512.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-2-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-2-450x300.jpg 450w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/turk-firmalari-nukleer-santraller-fuarinda-bulusacak-2.jpg 1417w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>beton, 407 bin ton in\u015faat demiri, 12 bin 300 vana, <strong>580 bin<\/strong> metrekare havaland\u0131rma paneli ve <strong>21 bin kilometre<\/strong> kablo kullan\u0131lmas\u0131n\u0131 \u00f6ng\u00f6rd\u00fcklerini a\u00e7\u0131klad\u0131. T\u00fcrk firmalar\u0131n\u0131n bu malzemeleri sa\u011flayabilecek nitelikte oldu\u011funun alt\u0131n\u0131 \u00e7izen <strong>Kayr\u0131n, Akkuyu NGS\u2019de<\/strong>; <em>kablo, bas\u0131n\u00e7l\u0131 kaplar, \u00e7elik yap\u0131lar, havaland\u0131rma ekipmanlar\u0131, borular, istifleme ve kald\u0131rma ekipmanlar\u0131, pompalar, elektrik panolar\u0131, trafolar, yang\u0131n s\u00f6nd\u00fcrme ekipmanlar\u0131, ayd\u0131nlatma ekipmanlar\u0131<\/em> gibi bir\u00e7ok alanda 2020 y\u0131l\u0131 boyunca bir\u00e7ok ihalenin yap\u0131lmas\u0131n\u0131n <strong>beklendi\u011fini ve ihaleler ile ilgili en g\u00fcncel<\/strong> bilgilerin <strong>NPPES\u2019te<\/strong> tart\u0131\u015f\u0131laca\u011f\u0131n\u0131 vurgulad\u0131.<\/p>\n<h2><strong>Akkuyu T\u00fcrk firmalar\u0131na 12 \u00fclkede i\u015f yapma giri\u015f bileti sa\u011flayabilir<\/strong><\/h2>\n<p><strong>Akkuyu NGS\u2019yi<\/strong> in\u015fa eden <strong>Rosatom\u2019un Finlandiya\u2019dan \u00c7in\u2019e<\/strong> kadar d\u00fcnyan\u0131n <strong>12<\/strong> \u00fclkesinde <strong>36 reakt\u00f6r\u00fcn yap\u0131m s\u00fcre\u00e7lerini<\/strong> y\u00f6netti\u011fini a\u00e7\u0131klayan Kayr\u0131n, T\u00fcrkiye\u2019deki projede Rosatom\u2019un tedarik zincirine girmenin farkl\u0131 \u00fclkelerdeki <strong>milyarlarca dolarl\u0131k projelere giri\u015f bileti sa\u011flayaca\u011f\u0131n\u0131<\/strong> bildirdi. Kayr\u0131n, Akkuyu NGS\u2019nin <strong>sadece elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layacak<\/strong> bir santral olarak de\u011fil, <strong>T\u00fcrk sanayisinin teknolojik seviyesini<\/strong> uluslararas\u0131 arenada <strong>yeni bir \u00e7\u0131taya koymay\u0131 sa\u011flayacak<\/strong> bir ara\u00e7 olarak da de\u011ferlendirilmesi gerekti\u011fini ifade etti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrk firmalar\u0131n\u0131 Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin in\u015faat\u0131nda bir\u00e7ok i\u015f f\u0131rsat\u0131 bekliyor. N\u00fckleer M\u00fchendisler Derne\u011fi\u2019ne g\u00f6re; Akkuyu\u2019nun in\u015faat\u0131nda kullan\u0131lmas\u0131 \u00f6ng\u00f6r\u00fclen 2,3 milyon metrek\u00fcp [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":108216,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[66811,3019,42302,1303,886,53114,52259,1972,12654,45772,66810,53348,18831,66809,66808,2587,4948],"views":151,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/108210"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=108210"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/108210\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/108216"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=108210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=108210"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=108210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}