{"id":107965,"date":"2020-02-06T19:25:03","date_gmt":"2020-02-06T16:25:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=107965"},"modified":"2020-02-06T19:25:38","modified_gmt":"2020-02-06T16:25:38","slug":"izmir-buyuksehir-belediyesi-biyokutle-tesisi-hayata-gecirecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/izmir-buyuksehir-belediyesi-biyokutle-tesisi-hayata-gecirecek\/","title":{"rendered":"(Turkish) \u0130zmir B\u00fcy\u00fck\u015fehir Belediyesi Biyok\u00fctle Tesisi Hayata Ge\u00e7irecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/107965\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u0130zmir B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan Menderes&#8217;te 5MWe g\u00fcce sahip biyok\u00fctle tesisini de i\u00e7ine alan bir <strong>entegre at\u0131k y\u00f6netimi tesisi<\/strong> hayata ge\u00e7irilecektir.<strong><img loading=\"lazy\" class=\"alignright wp-image-107971\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/izmir-buyuksehir-belediyesi-biyokutle-tesisi-hayata-gecirecek.jpg\" alt=\"\" width=\"320\" height=\"179\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/izmir-buyuksehir-belediyesi-biyokutle-tesisi-hayata-gecirecek.jpg 696w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/izmir-buyuksehir-belediyesi-biyokutle-tesisi-hayata-gecirecek-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/izmir-buyuksehir-belediyesi-biyokutle-tesisi-hayata-gecirecek-500x280.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/izmir-buyuksehir-belediyesi-biyokutle-tesisi-hayata-gecirecek-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h1>\n<p><strong>Biyok\u00fctleye dayal\u0131 bir elektrik \u00fcretim tesisini<\/strong> de i\u00e7ermekte olan <strong>entegre kat\u0131 at\u0131k y\u00f6netim tesisi<\/strong> kurularak <strong>15 y\u0131l s\u00fcre<\/strong> ile i\u015fletilmesi amac\u0131na y\u00f6nelik <strong>kapal\u0131 teklif usul\u00fcyle<\/strong> ihale ger\u00e7ekle\u015ftirilecektir.<\/p>\n<p><strong>\u0130halenin<\/strong> muhammen bedeli <strong>147.494.116,67 TL<\/strong> olup <strong>tesisin kira bedeliyle<\/strong> ilgili ihale ba\u015flang\u0131\u00e7 rakam\u0131 ise <strong>200.000 TL<\/strong> olarak belirlendi. <strong>Kira \u00f6demesi,<\/strong> enerji \u00fcretim tesisinin <strong>i\u015fletmeye al\u0131nd\u0131\u011f\u0131<\/strong> tarihten <strong>itibaren ba\u015flayacak olup<\/strong> ilgili ki\u015filerin <strong>4.424.823,50 TL<\/strong> ge\u00e7ici teminat yat\u0131rmas\u0131 gerekmektedir.<\/p>\n<p>\u0130hale,\u00a0<strong>13 \u015eubat 2020<\/strong> g\u00fcn\u00fc saat <strong>14.00\u2019te<\/strong>, <em>\u0130zmir B\u00fcy\u00fck\u015fehir Belediyesi Ba\u015fkanl\u0131\u011f\u0131<\/em>, <strong>Kat:3<\/strong>, <strong>No:309<\/strong>, <strong>Enc\u00fcmen Toplant\u0131 Odas\u0131<\/strong>, <strong>Cumhuriyet Bulvar\u0131<\/strong>, No:1, <strong>Konak<\/strong>, <strong>\u0130zmir<\/strong> adresinde ger\u00e7ekle\u015ftirilecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130zmir B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan Menderes&#8217;te 5MWe g\u00fcce sahip biyok\u00fctle tesisini de i\u00e7ine alan bir entegre at\u0131k y\u00f6netimi tesisi hayata ge\u00e7irilecektir. Biyok\u00fctleye dayal\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":107971,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[66573,58415,50226,36512,2765,66574,66575,2689,10632,66578,66576,4111,16437,66577],"views":297,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/107965"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=107965"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/107965\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/107971"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=107965"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=107965"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=107965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}