{"id":107743,"date":"2020-02-03T20:38:37","date_gmt":"2020-02-03T17:38:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=107743"},"modified":"2020-02-03T20:38:37","modified_gmt":"2020-02-03T17:38:37","slug":"afyon-belediyeside-kendi-biyogaz-tesisini-kuruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/afyon-belediyeside-kendi-biyogaz-tesisini-kuruyor\/","title":{"rendered":"(Turkish) Afyon Belediyesi&#8217;de Kendi Biyogaz Tesisini Kuruyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/107743\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Afyonkarahisar \u0130li \u00c7evre Hizmetleri Birli\u011fi taraf\u0131ndan ihalesi ger\u00e7ekle\u015ftirilerek 17 Ocak 2019&#8217;da s\u00f6zle\u015fmesi imzalanm\u0131\u015f olunan Entegre Kat\u0131 At\u0131k Tesisine y\u00f6nelik t\u00fcm \u00e7al\u0131\u015fmalar kesintisiz t\u00fcm h\u0131z\u0131yla devam ediyor.<\/strong><\/h1>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-107745\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/afyon-belediyesi-biyogaz-tesisi-kuracak.jpg\" alt=\"\" width=\"320\" height=\"148\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/afyon-belediyesi-biyogaz-tesisi-kuracak.jpg 549w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/afyon-belediyesi-biyogaz-tesisi-kuracak-300x139.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/afyon-belediyesi-biyogaz-tesisi-kuracak-500x231.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/02\/afyon-belediyesi-biyogaz-tesisi-kuracak-80x37.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Proje ile Afyonkarahisar\u2019da<\/strong> yer alan <strong>k\u00f6y, kasaba, il\u00e7e belediyeler<\/strong> olmak \u00fczere t\u00fcm il genelinin <strong>kat\u0131 at\u0131klar\u0131n\u0131n bertaraf\u0131 ve geri kazan\u0131m\u0131<\/strong> sa\u011flanacak olunul\u00a0<strong>Biyometanizasyon Tesisi\u2019nin<\/strong>\u00a01 Ekim 2020 tarihinde, <strong>At\u0131ktan T\u00fcretilmi\u015f Yak\u0131t Tesisinin<\/strong> yap\u0131m\u0131 ise\u00a0<strong>1 Ocak \u00a02021<\/strong>&#8216;de tamamlanmas\u0131 planlanmaktad\u0131r.<\/p>\n<p><strong>Entegre Kat\u0131 At\u0131k Y\u00f6netimi<\/strong> i\u015fi \u00e7er\u00e7evesinde yap\u0131lacak tesislerin toplam <strong>yat\u0131r\u0131m bedellerinin 100 milyon liray\u0131<\/strong> bulaca\u011f\u0131 <strong>organik at\u0131klar\u0131n<\/strong> \u00f6zel y\u00f6ntemlerle <strong>Biyometanizasyon Tesisleri&#8217;<\/strong>nde bertaraf\u0131 sa\u011flan\u0131rken, <strong>biyogazdan elektrik enerjisi \u00fcretimi<\/strong> yap\u0131lacak. Hayata ge\u00e7irilecek\u00a0<strong>Entegre Kat\u0131 At\u0131k Y\u00f6netimi<\/strong>\u00a0projesiyle\u00a0<strong>Afyonkarahisar \u0130li \u00c7evre Hizmetleri Birli\u011fi<\/strong>\u00a0bir ilke daha imza at\u0131lacak. <strong>Tesislerin i\u015fletmeye al\u0131nmas\u0131<\/strong> ile birlikte <strong>organik at\u0131klar\u0131n<\/strong> \u00f6zel y\u00f6ntemlerle <strong>Biyometanizasyon Tesislerinde<\/strong> bertaraf\u0131 sa\u011flan\u0131rken, biyogazdan <strong>elektrik enerjisi \u00fcretimi<\/strong> yap\u0131lacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Afyonkarahisar \u0130li \u00c7evre Hizmetleri Birli\u011fi taraf\u0131ndan ihalesi ger\u00e7ekle\u015ftirilerek 17 Ocak 2019&#8217;da s\u00f6zle\u015fmesi imzalanm\u0131\u015f olunan Entegre Kat\u0131 At\u0131k Tesisine y\u00f6nelik t\u00fcm \u00e7al\u0131\u015fmalar kesintisiz [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":107745,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[1110,60264,23885,66313,64246,66314,57885,25962,5070,46519,66315,43148,54979],"views":191,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/107743"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=107743"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/107743\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/107745"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=107743"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=107743"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=107743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}