{"id":107330,"date":"2020-01-29T11:45:12","date_gmt":"2020-01-29T08:45:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=107330"},"modified":"2020-01-29T12:06:07","modified_gmt":"2020-01-29T09:06:07","slug":"kiyikoy-resin-finansmani-icin-4-milyon-dolarlik-anlasma-saglandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kiyikoy-resin-finansmani-icin-4-milyon-dolarlik-anlasma-saglandi\/","title":{"rendered":"(Turkish) K\u0131y\u0131k\u00f6y RES&#8217;in Finansman\u0131 \u0130\u00e7in 4 Milyon Dolarl\u0131k Anla\u015fma Sa\u011fland\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/107330\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>T\u00fcrkiye\u2019nin yenilenebilir enerji kaynaklar\u0131n\u0131 geli\u015ftirme y\u00f6n\u00fcnde yat\u0131r\u0131mlar\u0131na devam eden Borusan EnBW Enerji, 2017\u2019de sat\u0131n ald\u0131\u011f\u0131 K\u0131y\u0131k\u00f6y R\u00fczg\u00e2r Enerjisi Santrali\u2019ne 20 ilave t\u00fcrbin in\u015fa ederek tesisin kurulu kapasitesini 72 MW art\u0131racak. Yat\u0131r\u0131m i\u00e7in Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131 (EBRD) ve ICBC T\u00fcrkiye kredi sa\u011flayacak.<\/strong><\/h1>\n<p>T\u00fcrkiye\u2019nin <strong>yenilenebilir enerji potansiyelinin<\/strong> geli\u015ftirilmesini ve enerji alan\u0131nda <strong>d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n azalt\u0131lmas\u0131n\u0131<\/strong> destekleme misyonuyla faaliyetlerini s\u00fcrd\u00fcren <strong>Borusan EnBW Enerji<\/strong>, \u00f6nemli bir yat\u0131r\u0131ma imza at\u0131yor. <strong>A\u011fustos 2014\u2019den<\/strong> beri <strong>28 MW kurulu kapasite<\/strong> ile faaliyette olan <img loading=\"lazy\" class=\"alignright wp-image-107333\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/kiyikoy-resin-finansmani-icin-4-milyon-dolarlik-anlasma-saglandi.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/kiyikoy-resin-finansmani-icin-4-milyon-dolarlik-anlasma-saglandi.jpg 651w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/kiyikoy-resin-finansmani-icin-4-milyon-dolarlik-anlasma-saglandi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/kiyikoy-resin-finansmani-icin-4-milyon-dolarlik-anlasma-saglandi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/kiyikoy-resin-finansmani-icin-4-milyon-dolarlik-anlasma-saglandi-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>K\u0131y\u0131ko\u0308y R\u00fczg\u00e2r Enerjisi Santrali\u2019ni (RES)<\/strong> 1 Aral\u0131k 2017\u2019de <strong>AKSA Enerji U\u0308retim A.S\u0327.<\/strong>&#8216;den sat\u0131n alan <strong>Borusan EnBW Enerji<\/strong>, tesisin kurulu enerji kapasitesini <strong>3 kattan fazla<\/strong> artt\u0131racak.<\/p>\n<p>Bu kapsamda <strong>Borusan EnBW Enerji<\/strong>, 3,6 MW kapasiteye sahip <strong>20 t\u00fcrbin in\u015fa ederek<\/strong> 72 MW ilave kapasiteyi i\u015fletmeye almay\u0131 planl\u0131yor. <strong>100 milyon ABD dolar\u0131 yat\u0131r\u0131m<\/strong> yap\u0131lacak <strong>projenin finansman\u0131<\/strong> i\u00e7in <strong>Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131 (EBRD) <\/strong>ve<strong> ICBC T\u00fcrkiye Bankas\u0131<\/strong> kredi sa\u011flayacak. Toplam <strong>74 milyon ABD dolar\u0131<\/strong> tutar\u0131ndaki krediye her <strong>2 banka e\u015fit miktarda<\/strong> katk\u0131 yapacaklar.<\/p>\n<p>Projenin tamamlanmas\u0131n\u0131n ard\u0131ndan <strong>K\u0131y\u0131k\u00f6y RES<\/strong>, 34 t\u00fcrbinden elde edilecek <strong>100 MW<\/strong> toplam kurulu kapasiteye sahip olacak. <strong>K\u0131y\u0131ko\u0308y RES tesisi<\/strong> <em>\u201c0\u201d emisyonlu u\u0308retimi<\/em> sayesinde, <strong>sera gaz\u0131 sal\u0131m\u0131n\u0131<\/strong> yapan tesislerin \u00fcretimini ikame edecek ve atmosfere her y\u0131l yakla\u015f\u0131k <strong>140.000 ton karbondioksit sal\u0131m\u0131n\u0131<\/strong> engelleyecek.<\/p>\n<p>Ayn\u0131 \u00fcretimi yapacak bir <strong>dog\u0306algaz tesisini ikame edecek<\/strong> olan <strong>K\u0131y\u0131ko\u0308y RES<\/strong>, Tu\u0308rkiye\u2019nin yapmas\u0131 gereken <strong>dog\u0306algaz ithalat\u0131n\u0131 azaltarak<\/strong> ekonomiye her y\u0131l <strong>16,9 milyon ABD dolar\u0131<\/strong> katk\u0131 sa\u011flayacak ve <strong>d\u0131\u015f ticaret a\u00e7\u0131\u011f\u0131n\u0131n azalmas\u0131n\u0131 da<\/strong> destekleyecek.<\/p>\n<p><strong>K\u0131y\u0131k\u00f6y RES<\/strong> kapasite art\u0131\u015f\u0131 yat\u0131r\u0131m\u0131yla ilgili bir a\u00e7\u0131klama yapan <strong>Borusan EnBW Enerji<\/strong> Genel M\u00fcd\u00fcr\u00fc <strong>Mehmet Acarla<\/strong> <span style=\"text-decoration: underline;\">\u015funlar\u0131 s\u00f6yledi:<\/span><\/p>\n<p>\u201c<em>T\u00fcrkiye\u2019nin s\u00fcrd\u00fcr\u00fclebilir kalk\u0131nmas\u0131, yerli s\u00fcrd\u00fcr\u00fclebilir enerji kaynaklar\u0131n\u0131 etkin bir \u015fekilde kullanabilmesiyle yak\u0131ndan ili\u015fkili. Bunu yapabildi\u011fimiz \u00f6l\u00e7\u00fcde \u00fclkemizin enerjide d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 azaltaca\u011f\u0131z. Halen portf\u00f6y\u00fcnde <strong>8 R\u00fczg\u00e2r Enerji Santrali, 1 Hidroelektrik Santral ve bir G\u00fcne\u015f Enerji Santrali bulunan<\/strong> \u015firketimiz bu hedefe y\u00f6nelik yat\u0131r\u0131mlar\u0131n\u0131 aksatmadan s\u00fcrd\u00fcr\u00fcyor.\u00a0<strong>K\u0131y\u0131k\u00f6y RES<\/strong> i\u00e7in yapaca\u011f\u0131m\u0131z kapasite art\u0131\u015f\u0131 da bu \u00e7er\u00e7evede de\u011ferlendirilmeli. <strong>\u00c7evre, ekonomi ve enerji a\u00e7\u0131s\u0131ndan<\/strong> \u00fclkemize \u00e7ok \u00f6nemli faydalar sa\u011flayacak bu projeye desteklerinden \u00f6t\u00fcr\u00fc <strong>Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131<\/strong> ve <strong>ICBC T\u00fcrkiye\u2019ye<\/strong> te\u015fekk\u00fcr ediyoruz. <strong>Borusan EnBW Enerji<\/strong> olarak <strong>r\u00fczg\u00e2r enerjisinde sekt\u00f6r lideri olma<\/strong> hedefimize do\u011fru kararl\u0131l\u0131kla ilerlemeye devam edece\u011fiz<\/em>.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin yenilenebilir enerji kaynaklar\u0131n\u0131 geli\u015ftirme y\u00f6n\u00fcnde yat\u0131r\u0131mlar\u0131na devam eden Borusan EnBW Enerji, 2017\u2019de sat\u0131n ald\u0131\u011f\u0131 K\u0131y\u0131k\u00f6y R\u00fczg\u00e2r Enerjisi Santrali\u2019ne 20 ilave t\u00fcrbin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":107333,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[65899,44699,14225,5070,52259,65902,60397,21908,65901,65900,65903,12707,47022,35002,53282,62655,10316,1243,54979,508],"views":116,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/107330"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=107330"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/107330\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/107333"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=107330"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=107330"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=107330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}