{"id":106893,"date":"2020-01-20T23:28:58","date_gmt":"2020-01-20T20:28:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=106893"},"modified":"2020-01-20T23:28:58","modified_gmt":"2020-01-20T20:28:58","slug":"siemens-gamesa-dan-anadolunun-ruzgarina-gore-turbin-uretimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/siemens-gamesa-dan-anadolunun-ruzgarina-gore-turbin-uretimi\/","title":{"rendered":"(Turkish) &#8217;Siemens Gamesa&#8217;dan Anadolu&#8217;nun R\u00fczgar\u0131na G\u00f6re T\u00fcrbin \u00dcretimi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/106893\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Siemens Gamesa taraf\u0131ndan 53 MW\u2019l\u0131k Kartal RES projesine y\u00f6nelik esnek g\u00fc\u00e7 <img loading=\"lazy\" class=\"alignright wp-image-106895\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/siemens-gamesadan-anadolunun-ruzgarina-gore-turbin-uretimi.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/siemens-gamesadan-anadolunun-ruzgarina-gore-turbin-uretimi.jpg 696w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/siemens-gamesadan-anadolunun-ruzgarina-gore-turbin-uretimi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/siemens-gamesadan-anadolunun-ruzgarina-gore-turbin-uretimi-500x282.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/siemens-gamesadan-anadolunun-ruzgarina-gore-turbin-uretimi-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>de\u011feri aral\u0131\u011f\u0131na sahip olan SG 4.5-145 karasal (onshore) r\u00fczg\u00e2r t\u00fcrbinlerinin tedari\u011fine y\u00f6nelik Callax Holding ile s\u00f6zle\u015fme imzaland\u0131.<\/strong><\/h1>\n<p>Anadolu\u2019nun <strong>genel iklim karakteri<\/strong> gibi <strong>orta seviyede r\u00fczg\u00e2r ko\u015fullar\u0131na<\/strong> sahip <strong>lokasyonlar i\u00e7in<\/strong> ideal bir \u00e7\u00f6z\u00fcm olan <strong>SG 4.5-145 t\u00fcrbini<\/strong>, spesifik saha ko\u015fullar\u0131na g\u00f6re <strong>\u00f6zelle\u015ftirilmi\u015f \u00e7\u00f6z\u00fcmlerle<\/strong> <em>maksimum verimlilik elde etmek<\/em> \u00fczere geli\u015ftirildi.<\/p>\n<p>R\u00fczgar t\u00fcrbini, ilgili projeye y\u00f6nelik esnek bir \u015fekilde yap\u0131land\u0131rma ile yap\u0131larak <strong>4,2 ile 5,0 MW<\/strong> aras\u0131 enerji \u00fcretebiliyor. T\u00fcrkiye\u2019de <strong>ilk kez sipari\u015f edilen<\/strong> bu t\u00fcrbinlerin kurulumuna ise\u00a0<strong>2020 y\u0131l\u0131nda<\/strong> ba\u015flanacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Siemens Gamesa taraf\u0131ndan 53 MW\u2019l\u0131k Kartal RES projesine y\u00f6nelik esnek g\u00fc\u00e7 de\u011feri aral\u0131\u011f\u0131na sahip olan SG 4.5-145 karasal (onshore) r\u00fczg\u00e2r t\u00fcrbinlerinin tedari\u011fine [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":106895,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[65355,5070,52259,65356,65353,35002,53282,28635,65354],"views":155,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106893"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=106893"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106893\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/106895"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=106893"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=106893"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=106893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}