{"id":10668,"date":"2013-05-08T16:58:44","date_gmt":"2013-05-08T13:58:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=10668"},"modified":"2013-05-08T17:02:17","modified_gmt":"2013-05-08T14:02:17","slug":"dogalgazin-elektrik-uretimindeki-payi-yuzde-30%e2%80%b2un-altinda-dustu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dogalgazin-elektrik-uretimindeki-payi-yuzde-30%e2%80%b2un-altinda-dustu\/","title":{"rendered":"(Turkish) Do\u011falgaz\u0131n Elektrik \u00dcretimindeki Pay\u0131 Y\u00fczde 30&#8217;un Alt\u0131nda D\u00fc\u015ft\u00fc!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/10668\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/turkiye-enerji-kurulu-gucu-2013-505x378.jpg\"><img loading=\"lazy\" class=\"wp-image-10669 alignright\" title=\"turkiye-enerji-kurulu-gucu-2013-505x378\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/turkiye-enerji-kurulu-gucu-2013-505x378-300x224.jpg\" alt=\"\" width=\"231\" height=\"171\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/turkiye-enerji-kurulu-gucu-2013-505x378-300x224.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/turkiye-enerji-kurulu-gucu-2013-505x378-66x50.jpg 66w\" sizes=\"(max-width: 231px) 100vw, 231px\" \/><\/a>TE\u0130A\u015e verilerine g\u00f6re, y\u0131l\u0131n ilk 4 ay\u0131nda T\u00fcrkiye kurulu g\u00fcc\u00fc 984 MW artt\u0131. 2012 y\u0131l\u0131 sonunda 57,058 MW\u2019a ula\u015fan T\u00fcrkiye kurulu g\u00fcc\u00fc May\u0131s itibari ile 58.042 MW\u2019a ula\u015ft\u0131.<\/strong><\/p>\n<p>Yak\u0131t cinslerine g\u00f6re art\u0131\u015f 163,3 MW do\u011falgaz, 284,7 MW barajl\u0131 hidroelektrik, 363 MW nehir tipi hidroelektrik, 119 MW r\u00fczgar enerjisi ve 22 MW biyoyak\u0131t olarak ger\u00e7ekle\u015fti. Devreye giren y\u00fcksek hidroelektrik kapasitesi ile, y\u00fczde 30,1 olan do\u011falgaz\u0131n elektrik \u00fcretimindeki pay\u0131 y\u00fczde 29,86\u2032a \u00e7ekildi.<\/p>\n<p>Son durum itibari ile kurulu g\u00fc\u00e7 da\u011f\u0131l\u0131m\u0131 a\u015fa\u011f\u0131daki \u015fekilde oldu:<\/p>\n<p><a href=\"http:\/\/static.enerjienstitusu.netdna-cdn.com\/medya\/kurulu_guc_300420131.png\"><img loading=\"lazy\" src=\"http:\/\/static.enerjienstitusu.netdna-cdn.com\/medya\/kurulu_guc_300420131.png\" alt=\"kurulu_guc_30042013\" width=\"468\" height=\"394\" \/><\/a><\/p>\n<p>Kaynak: <a href=\"yilin-ilk-4-ayinda-kurulu-guc-yaklasik-1-gw-artti\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.TE\u0130A\u015e verilerine g\u00f6re, y\u0131l\u0131n ilk 4 ay\u0131nda T\u00fcrkiye kurulu g\u00fcc\u00fc 984 MW artt\u0131. 2012 y\u0131l\u0131 sonunda 57,058 MW\u2019a ula\u015fan T\u00fcrkiye kurulu g\u00fcc\u00fc May\u0131s [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10669,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[92,19,63,67,1582,846],"views":619,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10668"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=10668"}],"version-history":[{"count":6,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10668\/revisions"}],"predecessor-version":[{"id":10672,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/10668\/revisions\/10672"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10669"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=10668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=10668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=10668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}