{"id":106520,"date":"2020-01-15T20:39:16","date_gmt":"2020-01-15T17:39:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=106520"},"modified":"2020-01-15T20:40:51","modified_gmt":"2020-01-15T17:40:51","slug":"siemens-gamesa-abd-nin-en-buyuk-offshore-ruzgar-santralini-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/siemens-gamesa-abd-nin-en-buyuk-offshore-ruzgar-santralini-kuracak\/","title":{"rendered":"(Turkish) &#8217;Siemens Gamesa&#8217; ABD\u2019nin En B\u00fcy\u00fck Offshore R\u00fczgar Santralini Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/106520\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>ABD\u2019li elektrik \u015firketi Dominion Energy ABD\u2019nin en b\u00fcy\u00fck offshore r\u00fczg\u00e2r santrali i\u00e7in Siemens Gamesa Yenilenebilir <img loading=\"lazy\" class=\"alignright wp-image-106523\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/siemens-gamesa-abd-nin-en-buyuk-offshore-ruzgar-santralini-kuracak.jpg\" alt=\"\" width=\"320\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/siemens-gamesa-abd-nin-en-buyuk-offshore-ruzgar-santralini-kuracak.jpg 813w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/siemens-gamesa-abd-nin-en-buyuk-offshore-ruzgar-santralini-kuracak-300x180.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/siemens-gamesa-abd-nin-en-buyuk-offshore-ruzgar-santralini-kuracak-768x461.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/siemens-gamesa-abd-nin-en-buyuk-offshore-ruzgar-santralini-kuracak-500x300.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/siemens-gamesa-abd-nin-en-buyuk-offshore-ruzgar-santralini-kuracak-80x48.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Enerji\u2019nin t\u00fcrbinlerini kullanmak \u00fczere anla\u015ft\u0131. Proje, 650 bin hanenin enerji ihtiyac\u0131na denk gelecek kadar elektrik \u00fcretecektir.<\/strong><\/h1>\n<p>Toplam kapasitesi <strong>2,600 mw<\/strong> olan projenin <strong>2026 y\u0131l\u0131nda tamamlanmas\u0131<\/strong> bekleniyor. <strong>Virginia eyaletinde<\/strong> \u00f6nemli oranda <strong>istihdam sa\u011flayacak<\/strong> proje i\u00e7in, <strong>Dominion Energy<\/strong> ve <strong>Siemens Gamesa<\/strong> birlikte \u00e7al\u0131\u015facak.<\/p>\n<p><strong>Dominion Energy<\/strong>, projenin <strong>in\u015fa ve operasyon<\/strong> plan\u0131n\u0131 <strong>2020 sonuna kadar<\/strong> haz\u0131r hale getirecek. <strong>2 \u015firket<\/strong> ayn\u0131 zamanda <strong>projenin maliyetini azaltmak<\/strong> i\u00e7in de <strong>\u00e7e\u015fitli mekanizmalar<\/strong> \u00fczerinde \u00e7al\u0131\u015facak.<\/p>\n<p>Kaynak: <a href=\"https:\/\/www.smart-energy.com\/renewable-energy\/siemens-gamesa-to-build-the-us-largest-offshore-wind-energy-project\/\" target=\"_blank\" rel=\"noopener\">Smart Energy International\u00a0<\/a>&#8211; <a href=\"http:\/\/www.elder.org.tr\/ebulten\/bulten252.html#haber9\" target=\"_blank\" rel=\"noopener\">Elder Ocak 2020 E- B\u00fclten<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ABD\u2019li elektrik \u015firketi Dominion Energy ABD\u2019nin en b\u00fcy\u00fck offshore r\u00fczg\u00e2r santrali i\u00e7in Siemens Gamesa Yenilenebilir Enerji\u2019nin t\u00fcrbinlerini kullanmak \u00fczere anla\u015ft\u0131. Proje, 650 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":106523,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[39137,64975,5070,52259,38282,37306,64976,35002,10595,53282,23130,35984,64977,26829],"views":263,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106520"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=106520"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106520\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/106523"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=106520"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=106520"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=106520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}