{"id":106515,"date":"2020-01-15T20:19:05","date_gmt":"2020-01-15T17:19:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=106515"},"modified":"2020-01-15T20:19:05","modified_gmt":"2020-01-15T17:19:05","slug":"demirdag-15-bin-mwlik-2023-hedefini-yakalariz","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/demirdag-15-bin-mwlik-2023-hedefini-yakalariz\/","title":{"rendered":"(Turkish) Demirda\u011f: &#8220;15 Bin MW\u2019l\u0131k 2023 Hedefini Yakalar\u0131z&#8221;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/106515\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>GENSED Ba\u015fkan\u0131 Halil Demirda\u011f, T\u00fcrkiye\u2019de g\u00fcne\u015f enerjisi kapasitesinin 3 y\u0131lda % yakla\u015f\u0131k 75 art\u0131\u015f g\u00f6stererek 6 GW\u2019a ula\u015ft\u0131\u011f\u0131n\u0131 dile getirerek \u201c2019\u2019un ilk yar\u0131s\u0131nda s\u0131n\u0131rl\u0131 b\u00fcy\u00fcyen sekt\u00f6r\u00fcm\u00fcz 2&#8217;inci yar\u0131daki d\u00fczenlemelerle hareketlendi\u201d dedi. Sekt\u00f6r\u00fcn her y\u0131l 1.5-2 GW aras\u0131 kurulum planlad\u0131\u011f\u0131n\u0131 belirten Demirda\u011f, \u201cT\u00fcrkiye\u2019nin 100&#8217;\u00fcnc\u00fc y\u0131l hedefi olan 15 GW\u2019\u0131 yakalar\u0131z\u201d dedi.<\/strong><\/h1>\n<p>T\u00fcrkiye\u2019de ge\u00e7mi\u015fi ancak <strong>2014 y\u0131l\u0131na kadar<\/strong> uzanan <strong>g\u00fcne\u015f enerjisi sekt\u00f6r\u00fc<\/strong>, 40 MW kurulu g\u00fc\u00e7 ile ba\u015flayan yat\u0131r\u0131mlar\u0131n\u0131 art\u0131rarak b\u00fcy\u00fcmesini s\u00fcrd\u00fcr\u00fcyor. <strong>G\u00fcne\u015f Enerjisi Sanayicileri ve End\u00fcstrisi Derne\u011fi (GENSED)<\/strong> Ba\u015fkan\u0131 <strong>Halil Demirda\u011f<\/strong>, ya\u015fanan geli\u015fmeler, elde edilen sonu\u00e7lar ve yap\u0131lan <img loading=\"lazy\" class=\"alignright wp-image-106517\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/demirdag-15-bin-mwlik-2023-hedefini-yakalariz.jpg\" alt=\"\" width=\"320\" height=\"345\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/demirdag-15-bin-mwlik-2023-hedefini-yakalariz.jpg 453w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/demirdag-15-bin-mwlik-2023-hedefini-yakalariz-278x300.jpg 278w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/demirdag-15-bin-mwlik-2023-hedefini-yakalariz-371x400.jpg 371w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2020\/01\/demirdag-15-bin-mwlik-2023-hedefini-yakalariz-46x50.jpg 46w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>projeksiyonlar \u0131\u015f\u0131\u011f\u0131nda sekt\u00f6r\u00fcn <strong>2020 y\u0131l\u0131na<\/strong> iyi bir ba\u015flang\u0131\u00e7 yapt\u0131\u011f\u0131n\u0131 s\u00f6yledi. T\u00fcrkiye\u2019nin <strong>g\u00fcne\u015fte 6 bin megavatl\u0131k kapasiteye<\/strong> ula\u015ft\u0131\u011f\u0131n\u0131 belirten <strong>Demirda\u011f<\/strong>, sadece <strong>son 3 y\u0131ll\u0131k d\u00f6nemde<\/strong> kurulu g\u00fcc\u00fcn yakla\u015f\u0131k <strong>% 75 art\u0131\u015f<\/strong> g\u00f6sterdi\u011fine dikkat \u00e7ekti.<\/p>\n<h2><strong>YILIN 2&#8217;\u0130NC\u0130 YARISINDA HAREKETLEND\u0130<\/strong><\/h2>\n<p>Sekt\u00f6r\u00fcn <strong>2019 y\u0131l\u0131n\u0131n ilk yar\u0131s\u0131nda<\/strong> mevcut lisansl\u0131 projelerin azalm\u0131\u015f olmas\u0131 ve <strong>az say\u0131da lisansl\u0131 projenin<\/strong> hayata ge\u00e7mesi nedeniyle s\u0131n\u0131rl\u0131 b\u00fcy\u00fcd\u00fc\u011f\u00fcne i\u015faret eden Demirda\u011f, \u015fu de\u011ferlendirmelere yer verdi: \u201c<strong>G\u00fcne\u015f enerjisi sekt\u00f6r\u00fc<\/strong>, y\u0131l\u0131n <strong>2&#8217;inci yar\u0131s\u0131nda<\/strong> \u00e7at\u0131 uygulamalar\u0131n\u0131 kapsayan <strong>yeni lisanss\u0131z y\u00f6netmeli\u011finin<\/strong> yay\u0131nlanmas\u0131, <strong>elektrik tarifelerindeki art\u0131\u015flar<\/strong> ve s\u00fcresi biten <strong>lisanss\u0131z projelere<\/strong> ilave <strong>3 ayl\u0131k s\u00fcre verilmesi<\/strong> ile hareketlendi. <strong>YEKA GES-3<\/strong> (10 MW\u2019l\u0131k par\u00e7alar halinde yakla\u015f\u0131k 40 ilde yerli mal\u0131 kullan\u0131m kar\u015f\u0131l\u0131\u011f\u0131 <strong>1000 MW<\/strong> kapasite tahsisi) <strong>ihale \u015fartnamesinin<\/strong> \u00e7ok k\u0131sa s\u00fcre i\u00e7inde yay\u0131nlanmas\u0131 bekleniyor.\u201d<\/p>\n<h2><strong>KURULU G\u00dc\u00c7 2019 SONU \u0130T\u0130BAR\u0130 \u0130LE 6 GW\u2018A ULA\u015eTI<\/strong><\/h2>\n<p>G\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn <strong>2014 y\u0131l\u0131nda<\/strong> yakla\u015f\u0131k <strong>40 MW\u2019l\u0131k<\/strong> kurulumla hareketlenmeye ba\u015flad\u0131\u011f\u0131n\u0131 hat\u0131rlatan Demirda\u011f, <strong>6 y\u0131ll\u0131k geli\u015fmeyi<\/strong> \u015f\u00f6yle \u00f6zetledi: \u201cSekt\u00f6r\u00fcm\u00fcz 2017 y\u0131l\u0131nda yakalad\u0131\u011f\u0131 ivmeyi s\u00fcrd\u00fcr\u00fcyor. 2019 y\u0131l\u0131nda yakla\u015f\u0131k <strong>1.100 MW GES<\/strong> kurulum ile sene sonu toplam <strong>GES kurulu g\u00fcc\u00fcn\u00fcn<\/strong> 6 MW\u2019a ula\u015ft\u0131. T\u00fcrkiye neredeyse s\u0131f\u0131rdan ba\u015flad\u0131\u011f\u0131 g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcnde \u015firketlerin, devletin ve di\u011fer t\u00fcm payda\u015flar\u0131n katk\u0131lar\u0131yla b\u00fcy\u00fcyor. Biliyoruz ki daha yolun \u00e7ok ba\u015f\u0131nday\u0131z. Gidecek uzun bir yolumuzun oldu\u011funu s\u00f6ylemek gerekiyor. T\u00fcrkiye\u2019nin <strong>100\u2019\u00fcnc\u00fc y\u0131l<\/strong> hedefi <strong>15 GW\u2019a<\/strong> ula\u015fmak. <strong>G\u00fcne\u015f enerjisi sekt\u00f6r\u00fc<\/strong> altyap\u0131s\u0131yla, deneyimiyle buna haz\u0131r, biz bu hedefi yakalayabiliriz. Sekt\u00f6r\u00fcm\u00fcz\u00fcn beklentisi, <strong>g\u00fcne\u015f enerjisine yat\u0131r\u0131mlar\u0131n<\/strong> devam ederek, her y\u0131l d\u00fczenli olarak <strong>1.5-2 GW<\/strong> aras\u0131 <strong>GES kurulumunun<\/strong> ger\u00e7ekle\u015fmesi ve ilerleyen y\u0131llarda da bu <strong>kurulum kapasitesinin s\u00fcreklili\u011finin<\/strong> sa\u011flayacak bir pazar\u0131n olu\u015fmas\u0131. Sekt\u00f6r\u00fcn beklentileri ger\u00e7ekle\u015firse bu ivme h\u0131z kesmeden devam eder.\u201d<\/p>\n<h2><strong>\u00dcLKEM\u0130Z\u0130N REFAHI A\u00c7ISINDAN GEREKL\u0130<\/strong><\/h2>\n<p>\u201c<strong>G\u00fcne\u015fin T\u00fcrkiye<\/strong>\u2019deki <strong>toplam elektrik \u00fcretimi<\/strong> i\u00e7indeki pay\u0131n\u0131n artmas\u0131na y\u00f6nelik her hamle, \u00fclkemizin refah\u0131 a\u00e7\u0131s\u0131ndan gerekli\u201d diyen Demirda\u011f, \u015funlar\u0131 s\u00f6yledi: \u201c<strong>Yerli ve milli enerji<\/strong> kayna\u011f\u0131m\u0131z olan g\u00fcne\u015fe yap\u0131lan <strong>her yat\u0131r\u0131m, ekonomimizi<\/strong> g\u00fc\u00e7lendirecektir. Bunun i\u00e7in yeni kapasiteler a\u00e7\u0131larak <strong>GES yat\u0131r\u0131mlar\u0131n\u0131n desteklenmesi<\/strong> gerekti\u011fini d\u00fc\u015f\u00fcn\u00fcyoruz. <strong>Mevcut kurulu g\u00fc\u00e7<\/strong> sayesinde T\u00fcrkiye, ithal do\u011falgaza harcayaca\u011f\u0131 <strong>600 milyon dolarl\u0131k<\/strong> b\u00fct\u00e7eyi ekonomisine katt\u0131. G\u00fcne\u015f sistemlerinin yakla\u015f\u0131k <strong>30 y\u0131l \u00f6mr\u00fc<\/strong> oldu\u011fu d\u00fc\u015f\u00fcn\u00fcl\u00fcrse, bu da <strong>18 milyar dolarl\u0131k tasarruf<\/strong> edilmesi ve b\u00f6yle bir mebla\u011f\u0131n <strong>T\u00fcrkiye b\u00fct\u00e7esine kazand\u0131r\u0131lmas\u0131<\/strong> demek.\u201d<\/p>\n<p>T\u00fcrkiye\u2019nin g\u00fcne\u015f enerjisinde <strong>sahip oldu\u011fu potansiyelin<\/strong> yan\u0131 s\u0131ra \u015firketlerin \u00e7ok do\u011fru yat\u0131r\u0131mlar yapmas\u0131 ve <strong>g\u00fcne\u015f m\u00fchendisli\u011finin<\/strong> \u00e7ok ilerlemesi gibi avantajlar\u0131 da bulundu\u011funu vurgulayan Demirda\u011f, s\u00f6zlerini \u015f\u00f6yle tamamlad\u0131: &#8220;\u00d6nemli olan elde etti\u011fimiz bu ba\u015far\u0131n\u0131n devaml\u0131l\u0131\u011f\u0131n\u0131n sa\u011flanabilmesi. T\u00fcrkiye b\u00fcy\u00fck potansiyelinin daha iyi fark\u0131na vararak, g\u00f6ky\u00fcz\u00fcn\u00fc g\u00f6rebildi\u011fi her yerde, tar\u0131m yap\u0131lmayan <strong>arazilerini, fabrika, mesken, \u015firket \u00e7at\u0131lar\u0131n\u0131 ekonomisine<\/strong> dahil ederek kendi g\u00fcne\u015finden enerjisini \u00fcretmeli.\u201d<\/p>\n<h2><strong>T\u00fcrkiye\u2019nin G\u00fcne\u015f Enerjisi Kurulu G\u00fcc\u00fc<\/strong><\/h2>\n<h2><strong>YIL KURULU G\u00dc\u00c7 (MW)<\/strong><\/h2>\n<p><strong>2014<\/strong> &#8211; 40<\/p>\n<p><strong>2015<\/strong> &#8211; 249<\/p>\n<p><strong>2016<\/strong> &#8211; 832<\/p>\n<p><strong>2017<\/strong> &#8211; 3.420<\/p>\n<p><strong>2018<\/strong> &#8211; 5.003<\/p>\n<p><strong>2019<\/strong> &#8211; 5.995<\/p>\n<p><strong>Kaynak: TE\u0130A\u015e<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. GENSED Ba\u015fkan\u0131 Halil Demirda\u011f, T\u00fcrkiye\u2019de g\u00fcne\u015f enerjisi kapasitesinin 3 y\u0131lda % yakla\u015f\u0131k 75 art\u0131\u015f g\u00f6stererek 6 GW\u2019a ula\u015ft\u0131\u011f\u0131n\u0131 dile getirerek \u201c2019\u2019un ilk [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":106519,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[52362,5070,64974,52259,727,28399,19757,47806,53157,34862,60023,54979,846,61445],"views":125,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106515"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=106515"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/106515\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/106519"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=106515"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=106515"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=106515"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}